ML20045H325
| ML20045H325 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 07/13/1993 |
| From: | Eugene Kelly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 9307200088 | |
| Download: ML20045H325 (2) | |
Text
.
JUL I 31993 U.S. NUCLEAR REGULATORY COMMISSION No. 93-89 REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:
Boston Edison Company (BECo)
Facility:
Pilgrim Nuclear Power Station (PNPS)
Docket No.:
50-293 Time and Date:
10:00 a.m., Wednesday, July 28,1993 Location:
DRSS Conference Room, Region I Office, King of Prussia, Pennsylvania
Purpose:
Management Meeting to Discuss Security Program Upgrades NRC Attendecs:
J. Joyner, Chief, Facilities Radiological Safety and Safeguards Branch, Division of Radiation Safety and Safeguards (DRSS)
R. Eaton, Acting Chief, Reactor Projects Section 3A, Division of Reactor Projects (DRP)
D. Limroth, Senior Reactor Engineer, DRSS E. King, Physical Security Inspector, DRSS Licensee Attendees: J. Neal, Security Manager R. Hird, Security Operations Division Manager T. Flaherty, Security Training Coordinator Note: This meeting is closed to the public because of the nature of safeguards information being discussed Handicapped persons requiring assistance to attend the meeting shall make their requests known to Eugene Kelly, Chief, Reactor Projects Section 3A, U.S. Nuclear Regulatory Commission, Region 1,475 Allendale Road, King of Prussia, PA., 19406, (215) 337-5183 prior to the meeting. Attendance by NRC personnel at this meeting should be made known by 8:00 a.m., July 26,1993.
ORIGINAL SIGNED BY:
Prepared by:
E. Kelly, Chief, RPS 3A 9307200088 930713 l
PDR ADOCK 05000293 i
p PDR I
OFFICIAL RECORD COPY g6 L
~
2 JUL i 31993 Distribution (Via E-Maill:
J. M. Taylor, Executive Director for Operations J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)
H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)
B. K. Grimes, Director, Division of Operating Reactor Support, NRR C. Rossi, Director, Division of Reactor Inspection and Licensee Performance, NRR J. Lieberman, Director, Of6ce of Enforcement S. Lewis, OfGee of the General Counsel (OGC)
T. E. Murley, Director, Of5cc of Nuclear Reactor Regulation W. T. Russell, Associate Director for Inspection and Technical Assessment, NRR J. Partlow, Associate Director for Projects, NRR S. Varga, Director, Division of Reactor Projects - 1/II, NRR J. Calvo, Assistant Director for Region i Reactors, NRR S. Bajwa, RPEB, NRR D. Wheeler, Regional Coordinator, OEDO N. Green, Jr., Policy Development & Technical Support Branch W. Butler, Director, Project Directorate I-3, NRR R. Eaton, Project Manager, PD I-3, NRR NRC Resident inspector Thomas T. Martin, Regional Administrator William F. Kane, Deputy Regional Administrator Regt a I Branch Chiefs Regiu Section Chiefs K. Abranam, Public Affairs Officer, RI D. Screnci, Field Public Affairs Officer, RI M. Miller, State Liaison Officer, RI T Darden, State Agreements Officer, RI K. Smith, Regional Attorney, RI D. Holmly, Enforcement Of0cer, RI B. Letts, Office of Investigations, Region I Field Of0cc J. Lanning, DRP, RI P. Jefferson, Computer Assistant, DRMA P. McKee, NRR/RSGB I2btribution:
E. Boulette, Senior Vice President - Nuclear, Boston Edison Company Public Document Room (PDR)
Local Public Document Room (LPDR)
Commonwealth of Massachusetts (2)
Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DRSS Division Secretary, RI DRMA Division Secretary, RI Projects Branch No.1 Secretary, RI P {/
{
iP Region I Receptionist R
m Kelly /meo nvill 7)gkf OFFICIAL RECORD COPY 7/12/93
.