ML20045H305
| ML20045H305 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 07/14/1993 |
| From: | Mccormickbarge NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Delgeorge L COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20045H306 | List: |
| References | |
| NUDOCS 9307200068 | |
| Download: ML20045H305 (2) | |
See also: IR 05000456/1993019
Text
Dcb/Dcd
,-
..
1
JUL 141993
1
i
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN: Mr. L. O. DelGeorge, Vice President
Nuclear Oversight and
Regulatory Services
Executive Towers West III
1400 Opus Place, Suite 300
Downers Grove, IL 60515
Dear Mr. DelGeorge:
SUBJECT:
ROUTINE RADIOLOGICAL CONTROLS AND RADWASTE INSPECTION AT BRAIDWOOD
>
This refers to the inspection conducted by Messrs. M. Kunowski and R. Paul of
this office on May 24 to June 25, 1993. The inspection included a review of
authorized activities for your Braidwood Station, Units 1 and 2.
At the
conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of a selective examination of proceduras
and representative records, observations, independent dose rate measurements,
and interviews. As discussed in Section 5 of the inspection report, the
quantity of radioactive noble gases and tritium released in gaseous effluents
has fluctuated widely since 1990, apparently because of leakage and repair of
various valves, the recent Unit 2 fuel leak, changes in analysis methodology,
and other influences.
We request that you review the gaseous effluent data
from 1990 to the present and estimate the relative contribution of the causes
of the fluctuation to the number of curies of gas and tritium released during
this period.
Please describe the results of your efforts in the Semiannual
Radioactive Effluent Release Report for July to December 1993.
No violations of NRC requirements were identified during the inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
,
b
G
TC-c4
1
.
,~
Commonwealth Edison Company
2
JUL 141993
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original Signed By William Snell
J. W. McCormick-Barger, Acting Chief
Radiological Controls Section 1
Enclosure:
Inspection Reports
No. 50-456/93019(DRSS);
No. 50-457/93019(DRSS)
cc w/ enclosure:
S. Berg, Site Vice President
K. Kofron, Station Manager
A. Haeger, Regulatory
Assurance Supervisor
D. Farrar, Nuclear Regulatory
Services Manager
OC/LFDCB
Resident Inspectors, Byron,
Braidwood, Zion
D. W. Cassel, Jr., Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
Licensing Project Mgr., NRR
Robert Newmann, Office of Public
Counsel
State Liaison Officer
Chairman, Illinois Commerce
Commission
bec w/ enclosure:
PUBLIC
RIII
Rill
Rill
RII'
haulALf
6
AibL
Kunowski/dg
M ormick-Barger
Farber
07ky/93
-