Ack Receipt of to Chairman Selin Re Closure of Urfo in Denver,Co.Nrc Interest in Areas Covered by Urfo Will Not Be Diminished by Closing
ML20045G959
Person / Time
Issue date: 07/06/1993
From: Bernero R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Schern E
WESTERN NUCLEAR, INC.
References
REF-WM-3 NUDOCS 9307160190
Download: ML20045G959 (2)


Text

l

.Mr. E. Michael Schern, Manager

  1. .
  • Western Nuclear, Inc.

Union. Plaza Suite 300 200 Union Boulevard R 0C E Lakewood, CO 80228

Dear Mr. Schern:

Thank you for your letter to Chairman Selin dated March 24, 1993, regarding closure of the Uranium Recovery Field Office (URF0) in Denver, Colorado.

As you are aware, the President directed all Federal agencies to reduce personnel I

staffing and the closure of URF0 was under consideration for that reason.

Your letter provides several reasons for keeping URF0 open, and these were t

considered in our evaluation of the various options to reduce staffing.

However, the Nuclear Regulatory Commission has decided to close URF0 in 1994.

The Commission recognizes and is sensitive to the substantive concerns of the states that are involved in the uranium recovery program and the mining industry, particularly with respect to the need to ensure continued l

constructive and effective communication and interaction with the NRC. On June 28, 1993, the Commission approved a detailed URF0 closure plan that addresses these and related issues. The plan indicates a date of August 1,1994, for final closure of URFO.

The plan also includes formation l

of an NRC Transition Oversight Team to ensure as smooth a transition as possible.

Interaction with this group will allow both industry and states an avenue for continued input, as the plan is implemented.

l l

The decision to close URF0 was primarily driven by projected resource limitations.

However, be assured that NRC's interest in the areas covered by URF0 will not be diminished by the closing.

Sincerely, Originalsigned by l

Robert M. Bernaro l

Robert M. Bernero, Director Office of Nuclear Material Safety and Safeguards Markf SmallfBoxesiin C6n~ urrence'Blosk.to; Define 1 Distribution 3C6pyjPfsfsren'ce)

T c

In small Box on "0FC:" line enter: C = Cover E = Cover & Enclosure N = No Copy

  • SEE PREVIOUS CONCURRENCE OFC LLUR7 C

LLUR X Q

LLllR a /

C LLWM /

LLW[!O NAME EBrummett/eb MFA[er DG1k BbfIch RBahrk

(

  • 4/I/93 N/n//93 DATE 6/30/93 M

6/30/93

/7' 6/30/93 H

l M

0FC NMSS NHSS !/f(

f,Y. Q

]f

~'

m l

NAME GArlotto RBernero DATE i

/

/93

~7/t//93 130135 g

c

[ '

S:\\LLWMTYPE\\EDIE\\E8729.ESB 0FFICIAL RECORD COPY l 0 In small Box on "DATE:" line enter: M - E-Mail Distribution Copy H = Hard Copy stu PDR : YES X

NO Category:

Proprietary or CF Only E

ACNW: YES X

NO Delete file after distribution Yes No g$

y j / :,

  • p j

IG: YES N0 X

EDO TKT 8729 (CRC #93-0254) j!

' a0 Distribution:

' Central File NMSS r/f EDO r/f LLWM t/f (0

,0 g j Dir r/f JKnubel JMilhoan,RIV SECY PLohaus JAustin LLWM r/f JSniezek JBlaha DMorris CJPoland RHall,URF0

[,

l LJCallan,RIV CKammerer JSurmeier DGillen JTaylor HThompson i

l I

L

...,Mr. E. Michael Schern, Manager C

Western Nuclear, Inc.

Union Plaza Suite 300 200 Union Boulevard f

Lakewood, CO 80228

Dear Mr. Schern:

Thank you for your letter to Chairman Selin dated March 24,/1993, regarding closure of the Uranium Recovery Field Office (URFO) in Denver, Colorado. As you are aware, the President directed all Federal agencies' to reduce personnel staffing and the closure of URF0 was under consideration'for that reason.

Your letter provides several reasons for keeping URF0 open, and these were considered in our evaluation of the various options to/ reduce staffing.

However, the Nuclear Regulatory Commission has decided to close URF0 in 1994.

The Commission recognizes and is sensitive to the su stantive concerns of the states that are involved in the uranium recovery program and the mining industry, particularly with respect to the need to' ensure continued constructive and effective communication and interaction with the NRC. On June 28, 1993, the Commission approved a detailed URF0 closure plan that addresses these and related issues. The plan in'dicates a target date of August 1,1994, for closure of URF0. The plan falso includes an NRC Transition Oversight Team to ensure as smooth a transition as possible.

Interaction with this group will allow both industry and states an avenue for continued input, as the final plan is implemented.

/

The decision to close URF0 was primarily driven by projected resource limitations. However, be assured that NRC'.s interest in the areas covered by URF0 will not be diminished by the closing.

Sincerely, Robert M. Bernero, Director Office of Nuclear Material Safety fand Safeguards Matk}Small385KsMihiC6nsudenEijB16Eht6]Difih(Dijtrib0ifion(losu CopWPEdferenest In small Box on "0FC:" line enter: C = Cover E = cover & Enc 0FC LLUR C

Lt d C LLWM LLWM NMSS NMSS NAME EBrummetNeh MFbegel EWBrach RBangart GArlotto RBernero b 30/93 N

g/f0/93 8

/ /93 7/ /93 7/ /93 7/ /93 DATE

/

S:\\LLWMTYPE\\EDIE\\E8729.ESB 0FFICIAL RECORD COPY In small Box on "DATE:" line enIer: M = E-Mail Distribution Copy H = Hard Copy Cat l gory: Preprietary or CF Only PDR : YES X

NO e

ACNW:.YES-X NO Delete file after distribution Yes No IG: YES NO X

/

EDO TKT'8729 (CRC #93-0254)

/

Distribution:

Central File NMSS r/f ED0 r/f LLWM t/f f

Dir r/f JKnubel JMilhoan,RIV SECY PLohaus JAustin LLWM r/f JSniezek JBlahaf DMorris CJPoland RHall,URF0 LJCallan,RIV CKammerer JSurmeier DGillen JTaylor HThompson

_