ML20045G863

From kanterella
Jump to navigation Jump to search
Forwards Proposed TS Re Shutdown,Addressing Issue 16 for ABWR
ML20045G863
Person / Time
Site: 05200001
Issue date: 06/30/1993
From: Fox J
GENERAL ELECTRIC CO.
To: Poslusny C
Office of Nuclear Reactor Regulation
Shared Package
ML20045G864 List:
References
NUDOCS 9307160082
Download: ML20045G863 (1)


Text

FE

~

4 GENuclear Energy.

C,ene:ai[iectnc Carrvany US Curtna Avenue. San Jcse. CA 95125 June 30,1993 Docket No. STN 52-001 Chet Poslusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation

Subject:

Submittal Supporting Accelerated ABWR Schedule - Shutdown Technical Specifications (Issue #16)

Dear Chet:

Enclosed please find the following shutdown technical specifications (pertaining to Issue

  1. 16) proposed for the ABWR:

1.

3.4.5, RIIR-Cold Shutdown, 2.

3.5.2, ECCS-Shutdown 3.

3.7.2, RCW/RSW and UllS-Shutdown 4.

3.7.3, RCW/RSW and UliS Refueling, new LCO added, 5.

3.9.7, RHR Iligh Water Level, and 6.

3.9.8, RIIR-Low Water Level Because LCO 3.7.3 (Item 4) is new, the subsequent LCOs in Section 3.7 need to be re-numbered. The other items replace the previously submitted LCOs. The electrical shutdown LCOs will be submitted on July 9,1993.

Please provide a copy of this transmittal to Mark Reinhart.

Sincerely, ack Fox Advanced Reactor Programs ec: Alan Beard (GE)

Norm Fletcher (DOE)

Cal Tang (GE) 130I70 J143 216 9307160002 930630 p

pc(O PDR ADOCK 05200001 yM A

PDR fj 1\\ \\