Forwards Enforcement Conference Insp Rept 50-341/93-14 on 930701
ML20045G500
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/08/1993
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
Shared Package
ML20045G501 List:
References
EA-93-154, NUDOCS 9307140047
Download: ML20045G500 (2)


See also: IR 05000341/1993014

Text

&

_

J L E ro

UNITED STATES

g.

.fg

NUCLEAR REGULATORY COYMisslON

[

)

y,

REGION til

$

'

4f

799 ROOSEVELT RO AD

0,

&

CLEN ELLYN, ILLINOl$ 60137

%,

/

....+

JUL 0 81993

Docket flo. 50-341

License No. NPF-43

EA 93-154

The Detroit Edison Company

ATTN:

D. R. Gipson

Senior Vice President

Nuclear Generation

6400 North Dixie Highway

Newport, MI 48166

Dear Mr. Gipson:

SUBJECT:

NRC ENFORCEMENT CONFERENCE REPORT NO. 50-341/93014(DRP)

This refers to an Enforcement Conference conducted by Mr. John B. Martin and

other members of the Region Ill staff on July 1, 1993, of activities at your

Fermi 2 facility and to the discussion of our findings with you and those

members of your staff identified in the enclosed report.

You will be natified by separate correspondence of our decision regarding

enforcement action based on the information presented ar.d discussed at the

Enforcement Conference.

As discussed at the conference, a concern was identified with the numerous

breakdowns in the modifications process associated with the engineering design

package (EDP) covering installation of the transmitters and recorders for the

wide range drywell pressure channels.

The resulting apparent violation

concerned ?.he fact that both divisions of the Post Accident Monitoring for

wide range drywell pressure were technically ir: 'rable at the same time for

longer than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> as a result of multiple t-

lowns in the modification

and installation process for the associated erg

ering design package.

In accordance with 10 CFR 2.790 of the Commission's regulatiors, a copy of

Qis letter and the enclosed enforcement conference repert wil . be placed in

the NRC Public Document Poom.

9307240047 930708

$DR

ADOCK 05000341

r

PDR

f

f

,

<

if>D

a

,

JUL 0 81993

'

'

The Detroit Edison Company

2

We will gladly discuss any questions you have concerning this conference.

Sincerely,

g iginsi signed by W. L Forney.

Edward G. Greenman, Director

Division of Reactor Projects

Enclosures: Enforcement Conference

Report tio. 50-341/93014(DRP);

cc w/ enclosure:

John A. Tibai, Supervisor

of Compliance

P. A. Marquardt, Corporate

Legal Department

OC/LFDCB

Resident Inspector,- RIII

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

knroe County Office of

Civil Prepared 1ess

-fermi, LPM, f4RR

J. G. ParticN, hER

J. Lieberma, OE

J. R. Goldberg, OGC

); c c *,

h' ' i) !! G

.

- \\- Q

RIII

Rt11

RI

Rlli

4

g

c%stia er

I ,1ps

rg

su

1

.

Pifok

Twigg

P

A

4 >r enman

j

ln

130021