ML20045G500
| ML20045G500 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/08/1993 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gipson D DETROIT EDISON CO. |
| Shared Package | |
| ML20045G501 | List: |
| References | |
| EA-93-154, NUDOCS 9307140047 | |
| Download: ML20045G500 (2) | |
See also: IR 05000341/1993014
Text
&
_
- J L E ro
UNITED STATES
g.
.fg
NUCLEAR REGULATORY COYMisslON
[
)
y,
REGION til
$
'
4f
0,
&
CLEN ELLYN, ILLINOl$ 60137
%,
/
....+
JUL 0 81993
Docket flo. 50-341
License No. NPF-43
EA 93-154
The Detroit Edison Company
ATTN:
D. R. Gipson
Senior Vice President
Nuclear Generation
6400 North Dixie Highway
Newport, MI 48166
Dear Mr. Gipson:
SUBJECT:
NRC ENFORCEMENT CONFERENCE REPORT NO. 50-341/93014(DRP)
This refers to an Enforcement Conference conducted by Mr. John B. Martin and
other members of the Region Ill staff on July 1, 1993, of activities at your
Fermi 2 facility and to the discussion of our findings with you and those
members of your staff identified in the enclosed report.
You will be natified by separate correspondence of our decision regarding
enforcement action based on the information presented ar.d discussed at the
Enforcement Conference.
As discussed at the conference, a concern was identified with the numerous
breakdowns in the modifications process associated with the engineering design
package (EDP) covering installation of the transmitters and recorders for the
wide range drywell pressure channels.
The resulting apparent violation
concerned ?.he fact that both divisions of the Post Accident Monitoring for
wide range drywell pressure were technically ir: 'rable at the same time for
longer than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> as a result of multiple t-
lowns in the modification
and installation process for the associated erg
ering design package.
In accordance with 10 CFR 2.790 of the Commission's regulatiors, a copy of
Qis letter and the enclosed enforcement conference repert wil . be placed in
the NRC Public Document Poom.
9307240047 930708
$DR
ADOCK 05000341
r
f
f
,
<
if>D
a
,
JUL 0 81993
'
'
The Detroit Edison Company
2
We will gladly discuss any questions you have concerning this conference.
Sincerely,
g iginsi signed by W. L Forney.
Edward G. Greenman, Director
Division of Reactor Projects
Enclosures: Enforcement Conference
Report tio. 50-341/93014(DRP);
cc w/ enclosure:
John A. Tibai, Supervisor
of Compliance
P. A. Marquardt, Corporate
Legal Department
OC/LFDCB
Resident Inspector,- RIII
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Public Health
knroe County Office of
Civil Prepared 1ess
-fermi, LPM, f4RR
J. G. ParticN, hER
J. Lieberma, OE
J. R. Goldberg, OGC
); c c *,
h' ' i) !! G
.
- \\- Q
RIII
Rt11
RI
Rlli
4
g
c%stia er
I ,1ps
rg
su
1
.
Pifok
Twigg
P
A
4 >r enman
j
ln
130021