Text
-o 3
JUL 81993 Docket Nos. 50-317 50-318 Mr. Robert E. Denton Vice President - Nuclear Energy Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant L
1650 Calvert Cliffs Parkway Lusby, Maryland 20657 - 4702
Dear Mr. Denton:
t
SUBJECT:
REACTOR AND SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation on June 28,1993, between Mr. J. Prell and Mr. Coon, arrangements were made for the administration of licensing examinations at the Calvert Cliffs Nuclear Power Plant.
The written examinations and operating tests are scheduled for the week of October 25,1993. Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in NUREG-1021, " Operator Licensing i
Examiner Standards," (ES-201, Attachment 4) during the week of October 4,1993.
To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by August 5,1993.
Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examination being iescheduled.
The NRC will prepare and administer the written examinations in accordance with ES-401 l
and ES-402 of NUREG-1021. In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.
l OFFICIAL RECORD COPY G:CC102593 9307140010 93070s PDR ADDCK 05000317
' D
Jul.
8 1993 i
Mr. Robert E. Denton 2
The NRC will prepare and administer the operating tests in accordance with ES-301 and I
ES-302 of NUREG-1021. In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above.
Your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination j
results are final.
ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.
Your staff should submit preliminary reactor and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This request is covered by Office of Management and Budget (OMB) Clearance Number i
3150-0101, which expires October 31,1995. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, includes gathering, xeroxing, and mailing the required material. Send comments about this burden estimate or any other aspect of this collection of information, including i
suggestions for reducing this burden, to the Information and Records Management Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-3019, Office of Management and Budget, Washington, D.C. 20503.
Thank you for your consideration in this matter. Mr. Coon has been advised of the NRC guidelines and policies addressed in this letter. If you have any questions on the evaluation process, please contact me at (215) 337-5211.
Sincerely, b
l y
Glenn W. Meyer, Chief PWR Section Operations Branch Division of Reactor Safety
}
OFFICIAL RECORD COPY G:CC102593 i
~ - - - -
n
Jul 8 1993
)
-4
}
Mr. Robert E. Denton 3
1 CC:
G. Detter, Director, Nuclear Regulatory Matters (CCNPP)
R. McLean, Administrator, Nuclear Evaluations N. Millis, General Supervisor - Nuclear Training i
J. Walter, Engineering D. vision Public Service Commission of Maryland K. Burger, Esquire, Mar / land P m;%'s Counsel R. Ochs, Maryland Safe 3.cr.y. Cc "+bn Public Document Room (PDR)
Local Public Document Roorr "a sDF)
Nuclear Safety Information Center ('El-)
NRC Resident Inspector State of Maryland (2) s bec:
Region 1 Docket Room (with concurrences)
J. Prell, Examiner, DRS OL Facility File DRS Files (2) bec (VIA LMAIL)
V. McCree, OEDO R. Capra, NRR D. Mcdonald, NRR (VIA LMAIL AND NO ATTACIIMENT)
G. Meyer, DRS 1
RI-RS RI:DRS P eli ng Meyer (
t M/2 /93 04/$/93 OFFICIAL RECORD COPY G:102593 i