Requests Response to Generic Ltr 92-01,Rev 1, Reactor Vessel Structural Integrity,10CFR50.54(f)
ML20045F747
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 06/30/1993
From: Olshan L
Office of Nuclear Reactor Regulation
To: Donnelly P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
GL-92-01, GL-92-1, TAC-M83435, NUDOCS 9307080337
Download: ML20045F747 (2)


Text

.

m Docket No. 50-155 June 30,.1993 j

Mr. Patrick M. Donnelly, Plant Manager i

Big Rock Point Plant Consumers Power Company 10269 U.S. 31 North

l Charlevoix, Michigan 49201

{

Dear Mr. Donnelly:

l

SUBJECT:

BIG ROCK POINT PLANT - RESPONSE TO GENERIC LETTER-(GL) 92-01, REVISION 1, " REACTOR VESSEL STRUCTURAL INTEGRITY, 10 CFR 50.54(f)"

(TAC NO. M83435)

Your previous responses dated July 1,1992, and February 25,-1993, to

=t questions 2a & 2b in GL 92-01 indicate that the initial upper-shelf energy.

(USE) and chemistry data for all beltline welds, except for the surveillance weld, are not known.

Either provide the data (initial Charpy USE and chemistry data) for each beltline' weld or provide the data and analysis from welds that were fabricated using the same vendor, fabrication time frame, fabrication process, and material specification to demonstrate that the j

surveillance weld is indeed representative of all beltline welds, and all beltline welds will meet the USE requirements of Appendix G,10 CFR Part 50.

(Your response dated February 25, 1993, indicates that the surveillance weld is only representative of the lower shell longitudinal weld.)

If this cannot be provided, then submit an analysis which demonstrates that lower values of USE will provide margins of safety against fracture equivalent to those required by Appendix G of the ASME Code.

Please provide a response within 60 days of recei t of this letter.

p The information requested by this letter is within the scope of the overall burden estimated in Generic Letter 92-01,' Revision 1, " Reactor Vessel Structural Integrity,10 CFR 50.54(f)." The estimated average number of burden hours is 200 person hours for each addressee's response. This estimate i

pertains only to the identified response-related matters and does not include the time required to implement actions required by the regulations. This action is covered by the Office of Management and Budget Clearance Number 3150-0011, which expires June 30, 1994.

l Sincerely,

{

ORIGINAL SIGNED BY Leonard N. Olshan, Project Manager i

Project Directorate 111-1 i

Division of Reactor Projects - III/IV/V l

Office of Nuclear Reactor Regulation cc:

See next page

[

DISTRIBUTION:

Docket File NRC & Local PDRs I

PD3-1 Reading JRoe i

JZwolinski WDean merson h

M00%

NvO E ES @y l

kC WShafer. RIII BElliott 0FFICE LA:PDIII-l f M M:PDIII-1 J(A)PD:PDIll-1 l

b kOlshan:dy h f

I NAME CJamerson Dean DATE G/d/93 h

b M93 b N 93 l

/

/ /

[E NNO h40 YES$)

y COPY G:\\WPDOCS\\BIGROLD BRP83435.LlR ORIGINAL OFFICE COPY 93070B0337 930630 I 0 l

PDR ADOCK 05000155 P.

PDR

a Mr. Patrick H. Donnelly, Plant Manager Big Rock Point Nuclear Plant cc:

Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Jane E. Brannon, County Clerk County Building Charlevoix, MI 49720 Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3423 N. Logan Street P. O. Box 30195 Lansing, Michigan 48909 U.S. Nuclear Regulatory Commission Resident Inspector Office Big Rock Point Plant 10253 U.S. 31 North Charlevoix, Michigan 49720 Mr. David P. Hoffman, Vice President Nuclear Operations Big Rock Point Plant Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201