Advises That Revised Insp of Category E Welds Remains within Requirements of GL 88-01 & Reduced Insp for Refueling Outage 12 Projected to Have Dose Savings of 12 Mrem.Revised Category E Weld Schedule Acceptable
ML20045F357
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 06/29/1993
From: Pulsifer R
Office of Nuclear Reactor Regulation
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
GL-88-01, GL-88-1, TAC-M86747, NUDOCS 9307070228
Download: ML20045F357 (3)


Text

Docket No. 50-331 June 29, 1993 DISTRIBUTION:

Docket-File OGC Mr. Lee Liu NRC & Local PDRs ACRS (10)

Chairman of the Board and PDIII-3 Reading EGreenman, RIII Chief Executive Officer JRoe PDIII-3 Gray I

Iowa Electric Light and Power Company JZwolinski Post Office Box 351 JHannon Cedar Rapids, Iowa 52406 MRushbrook RPulsi fer

Dear Mr. Liu:

SUBJECT:

GL 88-01 CATEGORY E WELD INSPECTIONS - DUANE ARNOLD ENERGY CENTER (TAC M86747)

The NRC safety evaluation sent to Duane Arnold (DAEC) on May 31, 1990, for the implementation of Generic Letter 88-01 approved the DAEC commitment to inspect all Category E welds each refueling outage. However, the safety evaluation also stated GL 88-01 requirements were that 50% of Category E welds.had to be examined during the next refueling outage and all Category E welds be examined every two refueling outages.

Your [[letter::NG-93-2401, Informs That Util Intends to Modify Schedule for Insp of Category E Welds for Refueling Outage (RFO 12) Scheduled to Commence 930729 & Next Refueling Outage (RFO 13) for Remainder of 10-yr ISI Interval,Per GL 88-01 Requirements|letter dated June 10, 1993]], provided a revised schedule to inspect

}

Category E welds for the remainder of the 10-year inservice inspection interval.

You intend to examine the four Category E welds located on the A recirculation loop piping during the upcoming refueling outage (RF012) commencing July 29, 1993. The remaining five Category E welds are located on the B recirculation loop piping and these will be examined during the sub-sequent refueling outage (RF0 13).

DAEC has been examining all of the Category E welds each outage. The licensee indicates that no new IGSCC indications have been identified in these inspections.

The revised inspection of Category E welds remains within the requirements of GL 88-01 and the reduced inspection for refueling outage 12 is projected to have a dose savings of 12 man-Rem. The revised Category E weld schedule is acceptable to the staff.

Sincerely,

/s/

l Robert M. Pulsifer, Project Manager Project Directorate III-3 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc: See next page

  • See Previous Concurrence OFFICE PDIII-3:LA:DRPW PDIII-3:PM:DRRW PDIII-3:PD:DRPW MR N b ok RPulsife[bhsw JHanns(M.[__

NAME DATE h/%/93 (p/ M /93

/'. /lf'/93 0FFICE

  • EMCB NAME JStrosnider DATE 6/22/93 0FFICIAL RECORD 0.

DOCUMENT NAME:

g:\\duanearn\\DUA88-01.LTR 5%ME.Jg%Y 9307070228 930629 ADOCK 0500 1

gDR

g>

li

~ ' ', g UNITED STATES l

li f [f NUCLEAR REGUL ATORY COMMISSION l

(*v WASHINGTON, D.C. 205 % -0001 June 29, 1993 Docket No. 50-331 Mr. Lee Liu Chairman of the Board and Chief Executive Officer Iowa Electric Light and Power Company Post Office Box 351 Cedar Rapids, Iowa 52406

Dear Mr. Liu:

SUBJECT:

GL 88-01 CATEGORY E WELD INSPECTIONS - DUANE ARNOLD ENERGY CENTER (TAC M86747)

The NRC safety evaluation sent to Duane Arnold (DAEC) on May 31, 1990, for the implementation of Generic Letter 88-01 approved the DAEC commitment to inspect all Category E welds each refueling outage.

However, the safety evaluation also stated GL 83-01 requirements were that 50% of Category E welds had to be examined during the next refueling outage and all Category E welds be examined every two refueling outages.

Your [[letter::NG-93-2401, Informs That Util Intends to Modify Schedule for Insp of Category E Welds for Refueling Outage (RFO 12) Scheduled to Commence 930729 & Next Refueling Outage (RFO 13) for Remainder of 10-yr ISI Interval,Per GL 88-01 Requirements|letter dated June 10, 1993]], provided a revised schedule to inspect Category E welds for the remainder of the 10-year inservice inspection interval.

You intend to examine the four Category E welds located on the A recirculation loop piping during the upcoming refueling outage (RF012) commencing July 29, 1993.

The remaining five Category E welds are located on the B recirculation loop piping and these will be examined during the sub-sequent refueling outage (RF0 13).

DAEC has been examining all of the Category E welds each outage. The licensee indicates that no new IGSCC indications have been identified in these inspections.

The revised inspection of Category E welds remains within the requirements of GL 88-01 and the reduced inspection for refueling outage 12 is projected to have a dose savings of 12 man-Rem.

The revised Category E weld schedule is acceptable to the staff.

Sincerely,

.A-

/

ober M.

ulsife, Project Manager Project Director te III-3 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc:

See next page

)

.s,.

i Mr. Lee Liu Iowa Electric Light and Power Company Duane Arnold Energy Center cc:

Jack Newman, Esquire Kathleen H. Shea, Esquire Newman and Holtzinger 1615 L Street, N.W.

Washington, D.C.

20036 Chairman, Linn County Board of Supervisors Cedar Rapids, Iowa 52406 lowa Electric Light and Power Company ATTN: David L. Wilson Plant Superintendent, Nuclear 3277 DAEC Road Palo, Iowa 52324 Mr. John F. Franz, Jr.

Vice President, Nuclear Duane Arnold Energy Ceriter 3277 DAEC Road Palo, Iowa 52324 Mr. Keith Young Manager, Nuclear Licensing Duane Arnold Energy Center 3277 DAEC Road Palo, Iowa 52324 U.S. Nuclear Regulatory Commission Resident Inspector's Office Rural Route Fl Palo, Iowa 52324 Regional Administrator, Region 111 U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Stephen N. Brown Utilities Division Iowa Department of Commerce Lucas Office Building, 5th Floor Des Moines, Iowa 50319

/