Forwards Insp Repts 50-289/93-13 & 50-320/93-06 on 930511- 0621.Valve Mispositioning Event Discovered & Formal Root Cause Analysis Being Performed
ML20045F233
Person / Time
Site: Crane  Constellation icon.png
Issue date: 06/30/1993
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Broughton T, Long R
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20045F234 List:
References
NUDOCS 9307070117
Download: ML20045F233 (3)


See also: IR 05000289/1993013

Text

E

{

j,rD

~

w :o

JLN 3 01993

Docket / License Nos.

50-289/DPR-50

50-320/DPR-73

Mr. T. Gary Broughton

Dr. Robert L. IAng

Vice President and Director, TMI-1

Vice President and Director, TMI-2

GPU Nuclear Corporation

GPU Nuclear Corporation

Three Mile Island Nuclear Station

Three Mile Island Nuclear Station

Post Office Box 480

Post Office Box 480

Middletown, PA 17057-0191

Middletown, PA 17057-0191

Dear Mr. Broughton and Dr. Long:

SUBJECT: NRC INSPECTION REPORT NOS. 50-289/93-13 AND 50-320/93-06

This letter transmits the findings of the resident safety inspection conducted by

Ms. M. Evans and Mr. D. Beaulieu from May 11,1993 - June 21,1993, at the Three Mile

Island Nuclear Station. The inspectors based these findings on observation of activities,

interviews, and document reviews and discussed them with Mr. T. G. Broughton and other

members of your staff at the conclusion of the inspection period. Inspector observations

indicated safe and conservative operation.

During the inspection period, a valve mispositioning event involving a building spray system

flow instrument was discovered. The mispositioning did not affect the operability of the

building spray system. However, we are concerned that there have been several recent

instances where Instrumentation and Controls technicians have not properly returned

equipment to service following maintenance or surveillance activities. We understand that

you are performing a formal root cause analysis to determine if the incidents have a common

root cause so that appropriate corrective actions can be taken. If this understanding is not

correct, please contact me promptly.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room. We appreciate your

cooperation.

Sincerely,

g ;,u e ., -

A. Randolph Blough, Chief

Projects Branch No. 4

Division of Reactor Projects

Enclosure: NRC Inspection Report Nos. 50-289/93-13 and 50-320/93-06

9307070117 930630

['h '

PDR

ADOCK 05000289

/

O

/

.,

JUN 3 01993

.o

r

..

GPU Nuclear Corporation

2

cc w/ encl:

E. L. Blake, Jr., Esquire

J. C. Fornicola, Licensing & Regulatory Affairs Director

R. E. Rogan, TMI Licensing Director

M. J. Ross, Operations and Maintenance Director, TMI-l

E. J. Scheyder, TMI-2 Site Operations Director

TMI-l Licensing Department

,

TMI-2 Licensing Department

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

TMI Alert (TMIA)

K. Abraham, PAO (2)

4

4

.

JUN 3 01993

.

.

GPU Nuclear Corporation

3

,

bec w/ encl:

Region I Docket Room (with concurrences)

bec w/enci (VIA F MAIL):

V. McCree, OEDO

J. Stolz, PD I-4, NRR

R.. Hernan, PD I-4, NRR

,

M. Masnik, NRR/PDNP

,

t

,

t

[

RI:DRP

RI:DRP

RI:DRP

fg) Evans

R,ogge

Blough

,

/J 6g/93

6/3 # 93

6/%/93

OFFICIAL RECORD COPY

'

G:\\ BRANCH 4\\TM931306. INS