ML20045E344

From kanterella
Jump to navigation Jump to search
Confirms 930413-15 Dates for NRC Insp.Dates Established in 930405 Telcon Between SR Mitchell & Rc Wilson.Insp Will Review Selected Procedures & Implementation for 10CFR50,App B,Quality Assurance Program
ML20045E344
Person / Time
Issue date: 04/06/1993
From: Norrholm L
Office of Nuclear Reactor Regulation
To: Mcqueen M
FLUID COMPONENTS, INC.
References
REF-QA-99901264 NUDOCS 9307020043
Download: ML20045E344 (2)


Text

.

(3_

APR gg 7993 Docket No.

99901264 Mr. Malcolm M. McQueen, President Fluid Components, Inc.

1755 La Costa Meadows Drive San Marcos, California 92069

Dear Mr. McQueen:

SUBJECT:

FUTURE NRC INSPECTION OF FLUID COMPONENTS, INC.

This letter confirms the dates of April 13-15, 1993, for an NRC inspection of Fluid Components, Inc. (FCI)

These dates were established in an April 5, 1993, telephone call between Mr.

Stephen R. Mitchell of FCI and Mr. Richard C. Wilson of the NRC.

The inspection will review selected procedures and implementation for FCI's 10 CFR Part 50, Appendix B, quality assurance program

'for supplying nuclear safety-related equipment, and will review the 10 CFR Part 21 reporting program.

It will concentrate on range and repeatability calibrations for mass flowmeters and their calibration transfer standards.

We look forward to your cooperation on this inspection.

If you have any questions, please contact me at 301/504-2961 or Mr.

Wilson at 301/504-2997.

Sincerely, Lei'f Norrholm, Chief Vendor Inspection Branch Division of Reactor Inspection 7.nd Licensee Performance of.' ice of Nuclear Reactor Regulation DISTRIBUTION:

Central Files / Docket File No. 99901264/ RIDS IE:09 VIB R/F DRIS R/F CRossi fj, fS: '/'

RZimmerman 9,

SAlexander OFFICE VIB/DRIL SCVIB/DRIL BCVIB/pRIL r

hCWilson CCwalina y ob holm NAME DATE 4/(/93 4/(/93 I4/h/93 h No h/No Eho COPY OFFICIAL RECORD COPY DOCUMENT ~NkME:

FCI.LTR BC FILE CENTER COPY

d. i0 9307020043 930406 PDR GA999 ENVFLUID u

f 99901264 PDR

L..

O o

~. _

/

UNITED STATES NUCLEAR REGULATORY COMMISSION o

g

E WASHINGTON. D. C. 20555

%***l h

4 477. C C 593 i

Docket No.

99901264 Mr. Malcolm M. McQueen, President Fluid Components, Inc.

1755 La-Costa Meadows Drive San Marcos, California 92069 l

Dear Mr. McQueen:

SUBJECT:

FUTURE NRC INSPECTION OF FLUID COMPONENTS, INC.

This letter confirms the dates of April 13-15, 1993, for an NRC inspection of Fluid Components, Inc. (FCI)

These dates were established in an April 5, 1993, telephone call between Mr.

Stephen R. Mitchell of FCI and Mr. Richard C. Wilson of the'NRC.

i The inspection will review selected procedures and implemehtation for FCI's 10 CFR Part'50, Appendix B, quality assurance program for supplying nuclear safety-related equipment,;and will review the 10 CFR Part 21 reporting 1 program.

It'will concentrate'on range and repeatability calibrations for mass flowmeters and' their calibration transfer standards.

1 We look forward to your cooperation on this inspection. 'If you have any questions, please contact me at 301/504-2961 or Mr.

Wilson at 301/504-2997.

Sincerely, k

if J. Norrholm, C

er Vendor Inspection' Branch t

Division:offReactor Inspection and Licensee' Performance Office of Nuclear Reactor Regulation

' i

,