Forwards Request for Addl Info Re Licensee 920709 Response to GL 92-01,rev 1, Reactor Vessel Structural Integrity, 10CFR50.54(f). Response Requested within 60 Days of Receipt of Ltr
ML20045E090
Person / Time
Site: FitzPatrick 
Issue date: 06/29/1993
From: Menning J
Office of Nuclear Reactor Regulation
To: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
GL-92-01, GL-92-1, TAC-M83464, NUDOCS 9307010093
Download: ML20045E090 (4)


Text

__-

June 29, 1993 Docket No. 50-333 DISTRIBUTION:

Docket: File NRC & PORs PDI-l Reading SVarga JCalvo RAcapra CVogan JMenning Mr. Ralph E. Beedle OGC ACRS (10)

Executive Vice President, Nuclear CCowgill, RGN-1 JStrosnider, 7/D/4 Generation DMcDonald Power Authority of the State of New York 123 Main Street White Plains, New York 10601

Dear Mr. Beedle:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - RESPONSE TO GENERIC LETTER 92-01, REVISION 1, " REACTOR VESSEL STRUCTURAL INTEGRITY, 10 CFR 50.54(f)," FOR THE JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. M83464)

By letter dated July 9,1992, the Power Authority of the State of New York (PASNY) responded to Generic Letter 92-01, Revision 1.

The staff has completed a preliminary review of the PASNY response and identified the need for additional information in order to complete our review. We, therefore, request that PASNY provide a response to the questions enclosed.

In order to support completion of our final review on schedule, we request a response within 60 days of receipt of this letter.

This requirement affects one respondent and, therefore, is not subject to Office of Management and Budget review under P.L.96-511.

Sincerely, Original signed by:

John E. Menning, Project Manager Project Directorate I-l Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosure:

Request for Additional Information i

cc w/ enclosure:

i See next page OFFICE PDI-1:LA PDI-1:PM PDI-1:D NAME CVogan Od JMenning RAcapra F h $3 93 6/2r/93 6 /11/93

/ /-

/ /

DATE

/ /

i 0FFICIAL RECORD COPY L

300044 9307010093 930629 hdh @{

PDR ADDCK 05000333 P

PDR

\\

g

[on arog'o UNITED STATES

~,,

NUCLEAR REGULATORY COMMISSION n

g a

WASHINGTON, D. C. 20555 k..... p June 29, 1993 Docket No. 50-333 Mr. Ralph E. Beedle Executive Vice President, Nuclear Generation Power Authority of the State of New York 123 Main Street White Plains, New York 10601 i

Dear Mr. Beedle:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - RESPONSE TO GENERIC LETTER 92-01, REVISION 1, " REACTOR VESSEL STRUCTURAL INTEGRITY, 10 CFR 50.54(f)," FOR THE JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. M83464)

By letter dated July 9,1992, the Power Authority of the State of New York (PASNY) responded to Generic Letter 92-01, Revision 1.

The staff has l

completed a preliminary review of the PASNY response and identified the need for additional information in order to complete our review. We, therefore, request that PASNY provide a response to the questions enclosed.

In order to l

support completion of our final review on schedule, we request a response within 60 days of receipt of this letter.

This requirement affects one respondent and, therefore, is not subject to Office of Management and Budget review under P.L.96-511.

Sincerely, t.

John E. Menning, Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosure:

Request for Additional Information cc w/ enclosure:

?*i See next page l

l

h Mr. Ralph E. Beedle James A. FitzPatrick Nuclear Power Authority of the State of New York Power Plant cc:

Mr. Gerald C. Goldstein Ms. Donna Ross Assistant' General Counsel New York State Energy Office Power Authority of the State 2 Empire State Plaza of New York 16th Floor 1633 Broadway Albany, New York 12223-New York, New York 10019 -

Resident Inspector's Office U. S. Nuclear Regulatory Commission Post Office Box 136 I

Lycoming, New York 13093 Mr. Harry P. Salmon, Jr.

Resident Manager James A. FitzPatrick Nuclear Power Plant Post Office Box 41 l

Lycoming, New York 13093 Mr. J. A. Gray, Jr.

Director Nuclear Licensing - BWR Power Authority of the State of New York 123 Main Street White Plains, New York 10601 i

Supervisor Town of Scriba Route 8, Box 382 Oswego, New York 13126 Mr. Robert G. Schoenberger, Acting i

President Power Authority of the State of New York 123 Main Street White Plains, New York.10601 Charles Donaldson, Esquire

' Assistant Attorney General New York Department of Law 120 Broadway I

New York, New York 10271 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 i

l

\\

.x n..,+

a.

t ENCLOSURE RE0dESTFORADDITIONALINFORMATION FITZPATRICK RESPONSE TO GENERIC LETTER 92-01 1.

The response to Question 2.a in Generic Letter'(GL) 92-01 indicates.that the initial upper-shelf energy (USE) values for all beltline submerged arc welds, except for the surveillance weld, are not known. A Topical Report, NED0-32205, "BWR Owners' Group Topical Report on Upper Shelf Energy Equivalent Margin Analysis," regarding beltline materials with low USE, was submitted by General Electric Corporation'(GE) on April 30, 1993.

Please confirm that this topical report will be used as the licensing bases to demonstrate that all beltline welds will meet the USE requirements of 10 CFR Part 50, Appendix G.

2.

The response to Question 2.b in GL 92-01 indicates that data from the drop weight test and Charpy test for beltline materials is either absent or 4

incomplete for initial RT determination. An alternate method developed by GE was used to derive UIe initial RT for these materials.

In the GE method, the establishment of the slope Io'r the transition zone of the Charpy curve is crucial in deriving the initial RT from incomplete test or data. Please provide all plate and weld Charpy test curves compiled by GE for establishing the 2 "F per ft-lb slope for the transition zone of the Charpy curve. All test data must be from materials equivalent to the beltline materials of this reactor vessel (i.e., same vendor, fabrication time frame, fabrication process, material specification, etc.).

3.

The response to Question ?..b also indicates that the chemistry data for Weld 1-233 and Weld 2-233 are based-on the " analytical combination" of separate chemistry data.

Please identify these separate chemistry data and their sources from which this analytical combination was made.

l i