5D-3W June?23, 1993' LICENSEE: Detroit Edison Company
']
FACILITY:
Fermi-2 Nuclear Plant
SUBJECT:
MEETING
SUMMARY
FOR JUNE 9, 1993 A meeting was held with Detroit Edison Company-(Deco) representatives and j
members.of the NRC technical and Region III staffs on June 9,21993,ito. discuss proposed changes to Section 6.0 of. the Fermi-2 Technical.-Specifications'.7These" changes were' the result of-discussions held at 'the' Great'. Lakes Quality-.
Assurance-(QA) Managers' Conference in October 1992.
Lynne Goodman of.the Deco staff spearheaded those discussions.
The licensee discussed. current regulatory requirementsifor performance of.
audits including the relative inflexibility of audit scheduling to meet these requirements. The licensee also discussed various options which might improve.-
flexibility to licensees including changes-to the. Technical Specifications (TS) changes to the Regulatory Guides'and;Rulemaking changes. The proposed TS changes:were described using three options ~ of varying degreesLof preference to the licensee.
The. proposed changes'would affect-the QA audit' functions described in Section 6.0.
These changcs would allow the: licensee more flexibility to target problem areas as the focus of QA audits, and maximize the use of existing resources. Although the staff felt the~11censee'sEapproach was.in the right -
direction, at least one of the licensee's: proposals,7 that!of removing all QA
. audit function requirements from Section-6.0:and relocating them to the'.QA Program Manual, was believed.to-be more' than the staff was.willing to approve at this time. :The proposal to relocate audit frequencies from-the Technical
. Specifications to the QA' Program Manual was ' viewed as having' some merit. ' The licensee indicated they would consider the staff's. comments in preparing any-license amendment application. for Fermi-2.
Enclosed.is a copy of the: licensee's slides used in their presentation-~and. a-list'of attendees; Original-signed'by~
Timothy G. Colburn, Sr. Project Manager Project. Directorate III-I Division of Reactor Projects.III/IV/V-cc w/ enclosures:
'See next page-93063003db930623
^
PDR' ADOCK 05000341
Enclosures:
P PDR
., r.
PMINd-eof [,7 k hg,[_[.. $, h i
11.
List of Attendees 2.
Presentation Slides-
<*SEE PREVIOUS. CONCURRENCE-f 0FFICE~
LA:PDIII-1*.
~PM:PDIII-1 (A)PD:PDIII AD:RIII7d' NAME CJamerson TColburn N JHall MI
'JZwolinski DATE' 06/18/93E
($/Af/93 la /M3'
%/d/93 COPY' YES/N0 hNO-
/kS)N0-YES/N0' G:\\WPDOCS\\ FERMI \\FEMIG6-9. SUM D
4
q j
q l
2.
Fermi-2 Detroit Edison Company
- )
]
+
CC:
John Flynn, Esquire Senior Attorney--
j Detroit Edison Company l
l 2000 Second Avenue l
Detroit,' Michigan 48226 Monitoring Section Office.
j!
Nuclear Facilities and Environment'a11 Division of' Radiological' Health' i
- Department of Public Health ~-
3423 N. Logan' Street P. 0. Box 30195 Lansing, Michigan 48909
~ '
s, Mr. Wayne Kropp U.S. Nuclear. Regulatory _ Commission Resident-ilnspector Office 6450 W.' Dixie' Highway-Newport,' Michigan: 48166 q
Monroe. County Office of Civil' s
Preparedness-963 South-Raisinville-
- Monroe ~, Michigan '48161 Regional' Administrator, Region III r
U.S.1 Nuclear Regulatory Conmission 799 Roosevelt Road
. Glen Ellyn, Illinois 60137
'Mr. l Willi a' m' E. Miller Director - Nuclear. Licensing Detroit Edison' Company 6~
Fermi-2 6400 North Dixie Highway 1
' Newport, Michigan ~ 48166 Mr. Douglas;R. Gipson Senior Vice Presidenti Nuclear Generation Detroit. Edison' Company i
6400 North. Dixie Highway ~
Newport, Michigan 48166 i
l 1
-9
+
+-
y e
w w
e m,*-
e y
v s
DISTRIBUTION-FOR~ MEETING'
SUMMARY
OF JUNE. 9,1993 DISTRIBUTION w/ enclosures 1 & 2
< Docket:Fileud NRC & Local-PDRs PD 3-1 Reading File WShafer,.RIII l
TColburn
.l DISTRIBUTION w/ enclosure 1'-
L TMurley/FMiraglia lJPartlow JRoe 5
JZwolinski,:
JHall,.
CJamerson; OGC' EJordan CGrimes GZech.
MRing,~RIII zRGramm FAllenspach
.j GGrant, 17tG21 l
- I
- \\
- q q
q i
i
-1: / :m: :.u_
Enclosure I MEETING ATTENDANCE. SHEET-JUNE 9, 1993 - MEETING WITH DETROIT EDIS0N COMPANY (Deco) TO DISCUSS PROPOSED-TECHNICAL SPECIFICATION CHANGES TO SECTION 6.0.
NAME ORGANIZATION / TITLE' James Partlow NRC/NRR/ Associate Director for Projects Chris I. Grimes NRC/NRR/ Chief, Technical Specifications Branch Gary G. Zech NRC/NRR/ Chief, Performance. and Quality
- Evaluation Branch Mark Ring NRC/ Region III/ Chief, Operations Branch-Robert Gramm NRC/NRR/ Quality Assurance Section Chief,-
Performance and Quality Evaluation-Branch Timothy G. Colburn NRC/NRR/ Project Manager Frederick R. Allenspach NRC/NRR/ Performance and Quality Evaluation Branch Lynne Goodman Deco / Director, iiuclear Quality Assurance:
Robert' Newkirk Deco / Supervisor Nuclear Licensing Randy Becker-Consumer's Power Company / Assistant Administrator l
i
?
Proposal:
Licensee's control audit progam with NRC Oversight instead of NRC Control 1
e i
_1_
l 1
l Requirements for Performance of Audits Technical Specifications Section 6 Environinental Protection Plan l
=
i
[
10CFR73.56 (g)(1)- Access Authorization 10CFR50.54 (t) - Emergency Preparedness.
i
=
i l
'10CFR71.137 - Environmental Protection - Radioactive Materials i
=
l-10CFR26.80 - Fitness for Duty Testing Lab.
i I
L10CFR20.1101 - Radiological Protection?
a
[
10CFR50.54 (p) -_ Safeguards Contingency Plan -
10CFR73.40 (d) - Safeguards Contingency Plan' j
a
\\l..
. i
4 1
i
. Requirements for. Performance of Audits (Continued) 10CFR73.55. (g)-(4) - Security ~ Program
. NUREG CR-4640 - Simulator I
Reg. Guide 1.155 - Station Blackout -
- =
[
. LReg Guide 1.21 - Environmental Protection -
Radioactive Effluents j
[
. Reg: Guide 4.1 -; Environmental Protection -
[
Environmental Monitoring
'a
~ Reg Guide 11.144 -
[
ANSI /ASME'N45.2.12 -
[
- :QAl Program as contained:in. Updated Final
.I Safety -Analysis ~ Report or QA Topical: Report:
t i
+
1.-
-3.
j
i'
. Frequency of Audits Per Requirements and Guidance 6 Months - 36 Months With few exceptions, no flexibility permitted for ' schedule extension.
Leads to resource waste with no benefit i
Perform audits when due regardless of activities in progress Can lead to meaningless audits Can lead to extra audits, e.g. to avoid refueling or to catch refueling l
Can lead.to auditing prior to corrective action completion i
l when. waiting a short time could have scheduled audit to measure effectiveness of corrective action l
L Can claim resources for non-problem areas that would be better c
[
used in monitoring and assessing weak areas b
l-..
Actions:
- Tech Spec Changes
- Regulation. Changes-
- Regulatory Guidance Changes l
- QA Program Changes
b l
1 t
l Tech Spec Changes:
1 Three~ options (Option 1 preferrable)
=
- Want to pursue option with greatest chance
- of timely success-i i
I.'
i'
'I i
l l
o l-.
I
'i j-4' th u
j
2 Tech Spec Changes Option 1-Remove Audits from Section 6 Audited areas listed in QA Program i
Changes in Audit Coverage specified in' QA Program treated per 10CFR50.54 (a) i
-- Reduction in' audit' coverage requires NRC review
[.
Audits required by rules conducted at specified frequency (unless rule I
changes or. exemption granted) with 25% internal extension allowable Provides more control.to QA Management on Audit and other oversight l-L activities -
Permits ~ greater flexibility based on performance and plant activities L
Allows licensees to better focus QA efforts'on how to improve weak or-i poor performance areas i
' Consistent with draft Standard Review Plan 17.3 l-l.
}
a
-7 i
L t
TechiSpec. Changes Option 2 -Tech Specs retain requirement to audit L
QA Organizatiori activities under Offsite Review-
[
Committee cognizance otherwise, same as L
Option 1.
i.
+ Assures Offsite Review Committee retains oversightLof QA l
l Activities and this is not changeable by QA Program change-
~
L i.
i c
j i
l:
l~
. l
l O
L i
TechLSpec Changes Option 3 -Remove Audit frequencies;only from Tech e
Specs.
- Audited areas not affected i
~
- Provides some flexibilty to adjust frequency based on performance and plant' activities
. Consistent with approach in revised Standard Tech Specs to remove
- audit frequencies.'
L
. 4 9
4
4 QA Program Changes
- QA Program revised to include listing of audited areas and fre-7 quencies.of. audits required by: regulations to be-conducted at
. specific frequencies e
=
QA Program change implementing lthis major revision to receive-NRC. review in parallel with Tech Spec change review p
l i-
)
- 1. -
1:
i.. '
e
-