ML20045D690

From kanterella
Jump to navigation Jump to search
Forwards Summary of Results of Investigations Conducted in Response to NRC Re Individual Alleged to Be Selling Illegal Narcotics in Plant Parking Lot & Broken Drive Chain in Refueling Crane.Allegations Unsubstantiated
ML20045D690
Person / Time
Site: Beaver Valley
Issue date: 06/18/1993
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NPDSVP:7401, NUDOCS 9306290306
Download: ML20045D690 (2)


Text

,.

_. ~.

. _, ~.

ver Valley Power Station' 1

Snippingport, PA 15077-0004 j

JOHN D. StEBER

- (412) 393-5255 -

Senior Wee President and Fax (412) 643-8069 Chief Nuclear Officer

~

j i

Nuclear Power Division June 18,_1993 NPDSVP:7401 1

i U. S. Nuclear Regulatory Commission Attn:

Document Control De*

Washington, DC 20555

Subject:

Beaver Valley Power Statire1,, Unit No. 1 and No. 2 l

BV-1 Docket No. 50-334, License No. D7?R ;

BV-2 Docket No.-50-412, License.No.._EPF-73 NRC Letter of May 21, 1993, James T Wiggins to J.D._'Sieber

)

i In response to the notification of,certain activitie's. reported to

~'

your' office as described in _the subject

letter, two separate investigations 'were conducted.

A.

summary of the results.of the investigations is provided in' the. Attachment.

The reports of'each investigation are available'in our-files.

As a' result of our evaluations, we have-concluded that there were-no safety issues related to either of'the activities identified.

Should you have.any questions, please contact Mr. Nelson Tonet'at-(412) 393-5210.

Sincerely, M o n D.

Sieber i.

Attachment i

250005-l ELECTRK

~

~

UTlUTYof

,pP i i

$4 [ t THE YEARS II h JDR306290306 9306is-p ADOCK 05000334-fi-

.p 1.

c PDR y';

~. -.

c.

l ATTACIDUQtT

-i The results of the ' investigations conducted in' response-to NRC.

'i letter to J. D. Sieber. dated May 21, 1993, are summarized:below.

r i

1.

An individual.was alleged-to.be selling illegal narcotics in the Beaver-Valley parking ' lot ~Lat -night..

The specific

-activity-was..

not -able to-be substantiated.

Ongoing j

. surveillance of parking. lots-by' security personnel.'during the ninth. refueling outage at Beaver Valley Unit:No. 1 have-1 not identified..any evidence of..the.use. or 'the sale-of:

illegal. substances.-

i 2.

The-Unit No. 1. refueling. crane was drivenLinto'its stops at a

slow. speed on:Nay 11, 1993, in an attempt to recenter the-

~

crane on its tracks.' In conjunction with this' activity, a-drive chain broke.

The event was identified and'. reported by Duquesne.. Light. Company.

personnel' ~ ?in' accordance with I

. appropriate. procedures, and. corrective actions'were taken to repair the crane'.

4 l-i L

l l

c_.

a u... a...

..