MONTHYEARML20202H8821997-12-0303 December 1997 Final Response to FOIA Request for Documents.Records in App a Being Made Available in PDR & Encl IA-97-428, Final Response to FOIA Request for Documents.Records in App a Being Made Available in PDR & Encl1997-12-0303 December 1997 Final Response to FOIA Request for Documents.Records in App a Being Made Available in PDR & Encl ML20202H8981997-10-27027 October 1997 FOIA Request for Listed Pages from Section 19 of General Electric ABWR Ssar ML20210J3591997-08-11011 August 1997 Transmits Revised Fda for Us ABWR Std Design,Per App 0 of 10CFR52.FDA Allows ABWR Std Design to Be Ref in Application for Const Permit or Operating License,Per 10CFR50 or in Application for Combined License,Per 10CFR52 ML20149J7101997-07-23023 July 1997 Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization ML20148A5701997-05-0202 May 1997 Forwards Affirmation Ltr Complying W/Filing Requirements of 10CFR52.45(d) & 50.30(b) Re Application for Review of ABWR Design Control Document,Rev 4 for Design Certification ML20196F8771997-03-28028 March 1997 Forwards Licensee ABWR Design Control Document,Rev 4 to Incorporate Changes Needed to Reflect Commission SRM Decisions & Subsequent Discussion W/Staff & to Support Ssar ML20137G3161997-03-28028 March 1997 Forwards Rev 4 to Ge'S ABWR Design Control Document to Incorporate Changes That Are Needed to Reflect Commission SRM Decisions & Subsequent Discussions W/Staff ML20147C1041997-01-23023 January 1997 Responds to Requesting Opportunity to Review Design Certification Rule for ABWR Before Sent to Ofc of Fr for Publication.Request Denied ML20133A9791996-12-18018 December 1996 Approves Rules Certifying Asea Brown Boveri-Combustion Engineering Sys 80+ & General Electric Nuclear Energy Advanced Boiling Water Reactor ML20133A9811996-12-18018 December 1996 Informs That NRC Has Approved Rules Certifying Two Evolutionary Reactor Designs:Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energy ABWR ML20133A9871996-12-18018 December 1996 Informs of NRC Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-CE Sys 80+ & GE Nuclear Energy ABWR ML20133A9901996-12-18018 December 1996 Informs That NRC Has Approved Asea Brown Boveri CE Sys 80+ & GE Nuclear Energy ABWR as Evolutionary Reactor Designs ML20133B0191996-12-18018 December 1996 Informs of Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energys Advanced BWR ML20128P4981996-09-23023 September 1996 Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing ML20128N6001996-09-16016 September 1996 Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking ML20117H3311996-08-30030 August 1996 Forwards GE ABWR Dcd,Rev 3 (Filed in Category A),Abwr Cdm, Rev 8 (Filed in Category a) & ABWR Ssar,Amend 37,Rev 9 (Filed in Category K) to Incorporate Changes Ref in 960701 & s from Jf Quirk ML20115C0861996-07-0101 July 1996 Forwards GE Providing Background for Need for Proposed Changes to ABWR Design Control Document (Dcd), Markups Incorporating Comments Resulting from Interactions W/Nrc & DCD Markups for Addl Proposed Change ML20115G2201996-06-10010 June 1996 Provides Comments from Two NRR Organizations on Cdm & Ssar Change Pages.Markups of DCD & Ssar Encl ML20108D4481996-04-26026 April 1996 Responds to Staff Ltr Re ABWR DCD Change Package Which Recommends That GE Submit All Changes Identified by Foake Program.Ltr Contrary to Previous Understandings ML20107H3241996-04-16016 April 1996 Forwards marked-up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR Engineering Program ML20108D3111996-04-0303 April 1996 Forwards Marked Up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR First-Of-A-Kind Engineering Program ML20101G9021996-03-22022 March 1996 Forwards Amend 36 to Rev 8 to 23A6100, ABWR Ssar & Rev 7 to 25A5447, Certified Design Matl ML20101P1231996-03-15015 March 1996 Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations ML20092G0171995-09-15015 September 1995 Forwards Missing Pp 103-117 from Attachment B of from SR Specker on Behalf of GE Nuclear Energy Re Response to Proposed RM for Std Design Certification of Us Advanced BWR Design LD-95-041, Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design1995-09-0505 September 1995 Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design ML20092B6431995-09-0101 September 1995 Forwards Analysis of Ocre 950812 Supplemental Comments on Design of Abwr,Notice of Final Rule & Statement of Considerations,In Order to Ensure That NRC Has Complete Technical Info on Subj ML20086G7981995-07-12012 July 1995 Informs of Changes to Svc List,Per Request of Jn Fox ML20084Q0621995-05-31031 May 1995 Forwards Revised Effective Page Listing for ABWR Design Control Document ML20078F4271995-01-26026 January 1995 Provides Info for Closure of ABWR FSER Confirmatory Item F1.2.2-2 Previously Addressed in 941222 Closure Ltr ML20077R9141995-01-17017 January 1995 Forwards Rev 2 to ABWR Design Control Document. Rev of Design Control Document Accompanied by List of Currently Effective Pages.List Provided as Attachment 2 ML20081K9361994-12-22022 December 1994 Documents Closure of ABWR FSER Confirmatory Items ML20080D3341994-12-22022 December 1994 Forwards Rev 1 to Advanced BWR Design Control Document ML20077A7471994-11-23023 November 1994 Forwards Revised Fda for Us ABWR Std Design,Per App O of 10CFR52 & Notice of Issuance of Fda ML20081K9031994-11-18018 November 1994 Forwards Rev 0 to Technical Support Document (Tsd) for ABWR & Updated ABWR Ssar App 19P Markup.Updated Version of App 19P Incorporated as Attachment a to Tsd,As Agreed During 941006 Meeting W/Nrc ML20073M7221994-11-0404 November 1994 Forwards Proposed Rev to Section 3.8 of DCD Introduction for ABWR Re GE Meeting on 941102 ML20078E6391994-11-0101 November 1994 Forwards Description of Proposed Process for Controlling Changes to Severe Accident Evaluations & Explains Bases for Proposed Process ML20149G9751994-10-31031 October 1994 Requests That Encl Ltrs Be Distributed to Controlled Copy of Licensee QA Program ML20149G7081994-10-28028 October 1994 Forwards Rev 0 to ABWR Design Control Document (Dcd). DCD Comprised of Introduction,Certified Design Matl & Approved Safety Analysis Matl.Responses to NRC Comments Requested by Also Encl ML20081K8881994-10-13013 October 1994 Maintains That Proposition That GE Be Designated in Notice of Proposed Rulemaking as Source from Which Public Could Request Copies of Design Control Document (DCD) Inappropriate.Public Should Obtain Access to DCD from NRC ML20076F8451994-10-0505 October 1994 Responds to Re Root Cause & Corrective Measures on Unidentified Changes That Occurred in Design Control Document ML20081K8721994-09-20020 September 1994 Requests That ABWR Final Design Approval (Fda) Be Amended to Provide for Term of 15 Years from Date of Issuance & That,As Provided in SRM on COM-SECY-95-025,FDA Be Updated as Needed to Conform to Any Changes Resulting from Certification RM ML20149F7681994-09-0707 September 1994 Forwards Rev 0 to Advanced BWR Design Control Document ML20072T2691994-08-30030 August 1994 Advises That Industry Intends to Comment in Opposition to Applicable Regulations Approach & Proposed Text of Applicable Regulations in Design Certification Rulemaking Proceeding for Both ABWR & Sys 80+ ML20072Q2811994-08-30030 August 1994 Submits mark-up of Previous Version of Design Control Document Introduction Together W/Typed Rev ML20072C9821994-08-12012 August 1994 Responds to Re NRC Fee Regulations for Design Certification & Request Confirmation of Understanding of 10CFR170 ML20072E3381994-08-0909 August 1994 Requests Addition of Author Name to Svc List for Advanced BWR ML20072A8451994-08-0303 August 1994 Forwards Chapter 21 17x22 Inch Drawings to Replace Temporary 11x17 Drawings Provided in ML20071Q9091994-08-0202 August 1994 Forwards Ten Copies of Draft ABWR Design Control Document ML20070H9651994-07-20020 July 1994 Forwards Rev 7 to 23A6100, ABWR Ssar, Amend 35 & Rev 6 to 25A5447, ABWR Certified Design Matl 1997-08-11
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20202H8981997-10-27027 October 1997 FOIA Request for Listed Pages from Section 19 of General Electric ABWR Ssar ML20149J7101997-07-23023 July 1997 Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization ML20148A5701997-05-0202 May 1997 Forwards Affirmation Ltr Complying W/Filing Requirements of 10CFR52.45(d) & 50.30(b) Re Application for Review of ABWR Design Control Document,Rev 4 for Design Certification ML20196F8771997-03-28028 March 1997 Forwards Licensee ABWR Design Control Document,Rev 4 to Incorporate Changes Needed to Reflect Commission SRM Decisions & Subsequent Discussion W/Staff & to Support Ssar ML20137G3161997-03-28028 March 1997 Forwards Rev 4 to Ge'S ABWR Design Control Document to Incorporate Changes That Are Needed to Reflect Commission SRM Decisions & Subsequent Discussions W/Staff ML20128P4981996-09-23023 September 1996 Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing ML20128N6001996-09-16016 September 1996 Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking ML20117H3311996-08-30030 August 1996 Forwards GE ABWR Dcd,Rev 3 (Filed in Category A),Abwr Cdm, Rev 8 (Filed in Category a) & ABWR Ssar,Amend 37,Rev 9 (Filed in Category K) to Incorporate Changes Ref in 960701 & s from Jf Quirk ML20115C0861996-07-0101 July 1996 Forwards GE Providing Background for Need for Proposed Changes to ABWR Design Control Document (Dcd), Markups Incorporating Comments Resulting from Interactions W/Nrc & DCD Markups for Addl Proposed Change ML20115G2201996-06-10010 June 1996 Provides Comments from Two NRR Organizations on Cdm & Ssar Change Pages.Markups of DCD & Ssar Encl ML20108D4481996-04-26026 April 1996 Responds to Staff Ltr Re ABWR DCD Change Package Which Recommends That GE Submit All Changes Identified by Foake Program.Ltr Contrary to Previous Understandings ML20107H3241996-04-16016 April 1996 Forwards marked-up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR Engineering Program ML20108D3111996-04-0303 April 1996 Forwards Marked Up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR First-Of-A-Kind Engineering Program ML20101G9021996-03-22022 March 1996 Forwards Amend 36 to Rev 8 to 23A6100, ABWR Ssar & Rev 7 to 25A5447, Certified Design Matl ML20101P1231996-03-15015 March 1996 Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations ML20092G0171995-09-15015 September 1995 Forwards Missing Pp 103-117 from Attachment B of from SR Specker on Behalf of GE Nuclear Energy Re Response to Proposed RM for Std Design Certification of Us Advanced BWR Design LD-95-041, Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design1995-09-0505 September 1995 Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design ML20092B6431995-09-0101 September 1995 Forwards Analysis of Ocre 950812 Supplemental Comments on Design of Abwr,Notice of Final Rule & Statement of Considerations,In Order to Ensure That NRC Has Complete Technical Info on Subj ML20086G7981995-07-12012 July 1995 Informs of Changes to Svc List,Per Request of Jn Fox ML20084Q0621995-05-31031 May 1995 Forwards Revised Effective Page Listing for ABWR Design Control Document ML20078F4271995-01-26026 January 1995 Provides Info for Closure of ABWR FSER Confirmatory Item F1.2.2-2 Previously Addressed in 941222 Closure Ltr ML20077R9141995-01-17017 January 1995 Forwards Rev 2 to ABWR Design Control Document. Rev of Design Control Document Accompanied by List of Currently Effective Pages.List Provided as Attachment 2 ML20080D3341994-12-22022 December 1994 Forwards Rev 1 to Advanced BWR Design Control Document ML20081K9361994-12-22022 December 1994 Documents Closure of ABWR FSER Confirmatory Items ML20081K9031994-11-18018 November 1994 Forwards Rev 0 to Technical Support Document (Tsd) for ABWR & Updated ABWR Ssar App 19P Markup.Updated Version of App 19P Incorporated as Attachment a to Tsd,As Agreed During 941006 Meeting W/Nrc ML20073M7221994-11-0404 November 1994 Forwards Proposed Rev to Section 3.8 of DCD Introduction for ABWR Re GE Meeting on 941102 ML20078E6391994-11-0101 November 1994 Forwards Description of Proposed Process for Controlling Changes to Severe Accident Evaluations & Explains Bases for Proposed Process ML20149G9751994-10-31031 October 1994 Requests That Encl Ltrs Be Distributed to Controlled Copy of Licensee QA Program ML20149G7081994-10-28028 October 1994 Forwards Rev 0 to ABWR Design Control Document (Dcd). DCD Comprised of Introduction,Certified Design Matl & Approved Safety Analysis Matl.Responses to NRC Comments Requested by Also Encl ML20081K8881994-10-13013 October 1994 Maintains That Proposition That GE Be Designated in Notice of Proposed Rulemaking as Source from Which Public Could Request Copies of Design Control Document (DCD) Inappropriate.Public Should Obtain Access to DCD from NRC ML20076F8451994-10-0505 October 1994 Responds to Re Root Cause & Corrective Measures on Unidentified Changes That Occurred in Design Control Document ML20081K8721994-09-20020 September 1994 Requests That ABWR Final Design Approval (Fda) Be Amended to Provide for Term of 15 Years from Date of Issuance & That,As Provided in SRM on COM-SECY-95-025,FDA Be Updated as Needed to Conform to Any Changes Resulting from Certification RM ML20149F7681994-09-0707 September 1994 Forwards Rev 0 to Advanced BWR Design Control Document ML20072Q2811994-08-30030 August 1994 Submits mark-up of Previous Version of Design Control Document Introduction Together W/Typed Rev ML20072T2691994-08-30030 August 1994 Advises That Industry Intends to Comment in Opposition to Applicable Regulations Approach & Proposed Text of Applicable Regulations in Design Certification Rulemaking Proceeding for Both ABWR & Sys 80+ ML20072C9821994-08-12012 August 1994 Responds to Re NRC Fee Regulations for Design Certification & Request Confirmation of Understanding of 10CFR170 ML20072E3381994-08-0909 August 1994 Requests Addition of Author Name to Svc List for Advanced BWR ML20072A8451994-08-0303 August 1994 Forwards Chapter 21 17x22 Inch Drawings to Replace Temporary 11x17 Drawings Provided in ML20071Q9091994-08-0202 August 1994 Forwards Ten Copies of Draft ABWR Design Control Document ML20070H9651994-07-20020 July 1994 Forwards Rev 7 to 23A6100, ABWR Ssar, Amend 35 & Rev 6 to 25A5447, ABWR Certified Design Matl ML20070D9381994-07-12012 July 1994 Forwards D-RAP Design Description & ITAAC for Inclusion in Section 3.6 of Cdm & Cdm & Ssar Markups Addressing Minor Corrections ML20069Q3001994-06-23023 June 1994 Forwards Rev 6 for Ssar Amend 35 & Rev 5 for Certified Design Matl ML20070E1981994-06-0808 June 1994 Forwards Ssar Markup Indicating Applicable Edtion to UBC, AISI SG-673 & NEMA FB1 to ABWR Ssar.Changes Will Be Included in Amend 35 Mod Package.Notifies That Applicable Edition of Bechtel Rept BC-TOP-3-A Is Rev 3 ML20070E1891994-06-0808 June 1994 Forwards Ssar Markup of Section 1A.2.34 Which Responds to TMI Item III.D.1(1).Mod Makes Section Consistent W/Ts 5.5.2.2.Change Will Be Included in Amend 35 Mod Package Scheduled for Distribution Later This Month ML20070D9331994-05-26026 May 1994 Forwards Results of Analyses to Assess Impact of Drywell Spray Actuation Following LOCA to Ensure Bounding Scenario ML20069H2101994-05-25025 May 1994 Forwards 25A5447,Rev 4, ABWR Certified Design Matl & Nonproprietary & Proprietary Version of 23A6100,Rev 5, ABWR Ssar. Proprietary Version of Ssar Withheld ML20069G9301994-05-25025 May 1994 Submits non-proprietary Ssar Amend 35 & Certified Design Material Rev 4 to Listed NRR Recipients ML20069B1831994-05-25025 May 1994 Resubmits Affidavit for GE Abwr,Proprietary Info Section 18H, Supporting Analysis for Emergency Control Operation Info ML20069A7371994-05-20020 May 1994 Forwards Proprietary Ssar Sections 11A.2 & 11A.4 to Specified NRR Recipients Listed on Attachment 1.Encl Withheld ML20029D4211994-04-29029 April 1994 Forwards Revised Ssar Markups Responding to Commitments Made at 940415 Meeting in Rockville,Md,Including Addl Info Reflecting Locking Mechanisms of Subassemblies & European Experience & Finalized TS for CRD Removal - Refueling 1997-07-23
[Table view] |
Text
-
e, GE bclear Energy 4
ceesi neenc comwr
> cuna A,n aa a :<pn June 21, 1993 1
i To: Jerry Wilson, Section Chief Standardization Projt et Directorate IRC - Mail Stop 11-H-3 From: Nore Hackford/ Tony James GE- Nuclear Energy.
San Jose
Subject:
June 18th ITAAC Submittal - REVISION
Reference:
MFN 098-93, Docket STN 52-001 The ten copies dated 6/18/93 addressed to the Document Control Desk of 'US-NRC sent to you Friday contained the fourth phase of revised ABWR Tier 1/ ITAAC material. These ten copies each have a two-page revision (copies attached).
Please replace pp. 1 and 4 of Section 2.14.1 with the enclosed revised pages.
Thanks.
Norm Hackford' b A i
l GE-Nuclear Energy, San Jose (408) 925-2227 enclosures i
1 I
L 230032 l i 9306280197 930621 66 r
PDR A
ADOCK 05200001 PDR i{\
4 , ..~
. ABWR 03 sign Docum:nt RewsclTedis hgh Wkl&
c
! .2.14' Containment and Environmental Control Systems O 2.,4., eri- rv Cent in-ent vs 1 -
Design Description The Primay Containment System (PCS) encompasses:
(1) A reinforced concrete containment structure with an internal steel liner. The structure includes various penetrations, equipment hatches
- and personnel access locks.
(2) Structures inside the primary containment which partition the containment into dqwell and wetwell regions, provide equipment <
support, radiation protection, and components for operation of the ABWR pressure suppression containment.
Figure 2.14.1 shows the basic configuration and scope.
The steel lined reinforced concrete containment structure attached to a reinforced concrete basemat provides the primary containment pressure barrier and is classified as AShfE Code Section III, Division 2.The Reactor Pressure Vessel (RPV) support pedestal and a diaphragm floor partition the containment p volume into drywell and wetwel! egions. The RPV support pedestal is a steel d structure with concrete fill material. The diaphragm floor is a reinforced concrete structure. Other major internal structures within the containment are the reactor shield wall, lower dqwell personnel and equipment access tunnels 5 and the dywell equipment and piping support structure. These internal structures are steel fabrications.
1 Penetrations through the containment pressure boundary include; the drywell !
head closure, equipment hatches to both upper and lower drywell regions, j personnel locks into upper and lowei drywells, a combined personnel access and i equipment hatch into the wetwell and piping and electrical penetrations. These l pressure boundary appurtenances are steel structures classified as AShiE Code {
Section III, Disision 1, Class hic.
The containment design pressure is 3.16 kg/cm 2g. The design temperatures for ,
the dgwell and the wetwell are 171 C and 104 C respectively.The maximum )
calculated pressures and temperatures for the design basis accident are less than these design conditions. The primary containment pressure boundary including penetrations and isolation valves, has a leak rate equal to or less than 0.5% per day (excluding main steamline isolation valves (htSIV) leakage) of the containment gas mass at the maximum calculated containment pressure for the design basis accident.
6/18/93 1 2.14
w S (,) ~
O (J~'t \_/
j Table 2.14.1 Primary Containment System ,
g Inspections, Tests, Analyses and Acceptance Criteria Design Commitment inspections, Tests, Analyses Acceptance Criteria
- 1. The basic configuration of the PCS is as 1. Inspections of the as-built system will be 1. The as-built PCS conforms with the basic shown on Figure 2.14.1. conducted. configuration shown on Figure 2.14.1.
- 2. The ASME Code pressure boundary 2. A structural integrity test (SIT) will be 2. The results of the SIT of the pressure components of the PCS retain their conducted on the pressure boundary boundary components' conform with the integrity under internal pressures that will components of the PCS per ASME Code requirements of the ASME Code.
be experienced during service. requirements.
- 3. The maximum calculated pressures and 3. Analyses of the design basis accident will 3. The maximum calculated pressures and temperatures for the design basis accident be performed using as-built PCS data. temperatures are less than design are less than design conditions. conditions
- 4. The primary containment pressure 4. An integrated leak rate test of the as-built 4. The primary containment pressure boundary including penetrations and primary containment will be conducted. boundary including penetrations and isolation valves has a leak rate equal to or isolation valves has a leak rate equal to or less than 0.5% per day (excluding MSIV less than 0.5% per day (excluding MSIV
. leakage) of the containment gas mass at leakage) of the containment gas mass at t the maximum calculated containment the maximum ca:culated containment pressure fcr the design basis accident. pressure for the design basis accident.
- 5. The design differential pressure of the 5. An SIT will be conducted of the as-built 5. An SIT report exists concluding that the as-diaphragm floor between the drywell and diaphragm floor with the drywell pressure built diaphragm floor is able to withstand wetwell is 1.76 kg/cm2 in the downward greater than wetwell pressures by 1.15 the design differential pressure.
direction. times the design differential pressure
- 6. The water volume in the suppression pool 6. Analyses of the as-built PCS will be 6. The water volume in the suppression pool including the vents is equal to or greater performed. including the vents is equal to or greater than 3580 m3. than 3580 m 3
- 7. The horizontal center line of the SRVDL 7. Irupections of the as-built SRVDL 7. The horizontal center line of the SRVDL quencher arms are located at or below the quenchers will be conducted. quencher arms are located at or below the elevation of the center row of horizontal elevation of the center row of horizontal vents in the suppression pool. vents in the suppression pool.
N