ML20045C940

From kanterella
Jump to navigation Jump to search

Ack Receipt of 930608 Response to NRC Bulletin 93-002.No Fibrous Matl Identified as Being Used or Stored in Containment,Therefore Actions Considered Complete
ML20045C940
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/22/1993
From: Gamberoni M
Office of Nuclear Reactor Regulation
To: Richard Anderson
NORTHERN STATES POWER CO.
References
IEB-93-002, IEB-93-2, TAC-M86604, TAC-M86605, NUDOCS 9306250134
Download: ML20045C940 (3)


Text

.

Docket Nos. 50-282:

June 122, 1993 and 50-306 Roger 0. Anderson, Director ~

Licensing and Strategic-Issues Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401

Dear Mr. Anderson:

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANTS UNIT NOS. 1 AND 2 - RESPONSE TO NRC BULLETIN 93-02, " DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS" (TAC NOS. M86604 AND M86605)

This letter acknowledges receipt of your response dated June 8,1993 to NRC.

Bulletin 93-02 (Bulletin). The Bulletin was issued May-11,1993, to all nuclear power reactor licensees.

It requested licensees to identify fibrous material in the primary containment,' take any necessary compensatory measures, i

and remove any such material. Your response stated that no fibrous filter material, such as described in the Bulletin, was identified as being used.or -

stored in your containment.

Based on that, we consider your actions to be complete.

Please retain any records of your actions in response to this-Bulletin, as subsequent inspection activities may be conducted in regards to this issue.

Should you have any questions, please contact me at~ (301) 504-3024 or the lead Project Manager for this issue, John B. Hickman, at (301) 504-3017.

Sincerely,

///

Marsha Gamberoni, Project Manager Project Directorate III-l Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation cc:

see next page DISTRIBUTION:

Docket File-NRC & Local PDRs PD 3-1 Reading File JRoe JZwolinski WDean RBarrett, 8H7 JHickman CJamerson MGamberoni OGC 2/i0077 ACRS (10)

WShafer, RIII ORIGINAL OFFICE COPY G:\\WPDOCS\\ PRAIRIE \\PI86604'LET OFFICE-

'LA:PDIII-l.

PM:PDIII-l,

PD:PDIII-I NAME CJamerson Ch MGamberodM WDean N;

.]

DATE 6/2S/93 b

G /22/93

(./72/93

(

COPY

[hESh0 (E$4l0

((ES/NO f

g(-

~-

v 9306250134 930622 r nxm PDR ADOCK 0500 2

, gy gg G

,a no

!'\\

l,f )e e-(

S UNITED STATES

' ( Q;^

j NUCLEAR REGULATORY COMMISSION 4

p WASHINGTON D.C. 20555-0001 June 22, 1993 Docket Nos. 50-282 and 50-306 Poger 0. Anderson, Director Licensing and Strategic Issues Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401

Dear Mr. Anderson:

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANTS UNIT NOS. 1 AND 2 - RESPONSE TO NRC BULLETIN 93-02, " DEBRIS PLUGGING 0F EMERGENCY CORE COOLING SUCTION STRAINERS" (TAC NOS. MB6604 AND M86605)-

This letter acknowledges receipt of your response dated June 8,1993 to NRC Bulletin 93-02 (Bulletin). The Bulletin was issued May 11, 1993, to all nuclear power reactor licensees.

It requested licensees to identify fibrous material in the primary containment, take any necessary compensatory measures, and remove any such material.

Your response stated that no fibrous filter material, such as described in the Bulletin, was identified as being used or stored in your containment.

Based on that, we consider your actions to be complete.

Please retain any records of your actions in response to this Bulletin, as subsequent inspection activities may be conducted in regards to this issue.

Should you have any questions, please contact me at (301) 504-3024 or the lead Project Manager for this issue, John B. Hickman, at (301) 504-3017.

Sincerely, I

k f c~6 La N Marsha Gamberoni, Project Manager Project Directorate III-l' Division of Reactor Projects - III/IV/V Office of Nuclear Reactor elegulation cc:

see next page

Mr. Roger 0. Anderson,- Director Prairie Island Nuclear Generating Northern States Power Company Plant cc:

J. E. Silberg, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.

Washington DC 20037 Mr. E. L. Watzl, Site General Manager Prairie Island Nuclear Generating Plant Northern States Power Company Route 2 Welch, Minnesota 55089 Lisa R. Tiegel Assistant Attorney General Environmental Protection Division Suite 200 520 Lafayette Road St. Paul, Minnesota 55155 U.S. Nuclear Regulatory Commission Resident Inspector Office 1719 Wakonade Drive East Welch, Minnesota 55089 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Jeff Cole, Auditor / Treasurer Goodhue County Courthouse Red Wing, Minnesota 55066 Kris Sanda, Commissioner Director of Public Service 121 Seventh Place East Suite 200 St. Paul, Minnesota 55101-2145