ML20045C935

From kanterella
Jump to navigation Jump to search

Forwards SE Concluding That Analysis Adequately Demonstrates That Bounding Surge Line & Nozzles Meet ASME Code Stress & Fatigue Requirements for 40-yr Design Life of Facility
ML20045C935
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/22/1993
From: Wigginton D
Office of Nuclear Reactor Regulation
To: Barkhurst R
ENTERGY OPERATIONS, INC.
Shared Package
ML20045C936 List:
References
IEB-88-011, IEB-88-11, TAC-M72180, NUDOCS 9306250129
Download: ML20045C935 (4)


Text

.

! p "tauq

.7Y

- I UNITED STATES t

I I 'O E

NUCLEAR REGULATORY COMMISSION (g

'/

WASHINGTON D.C_20SS5-0001 gs, j

June 22, 1993 Docket No. 50-382 Mr. Ross P. Barkhurst Vice President Operations Entergy Operations, Inc.

Post Office Box B Killona, Louisiana 70066

Dear Mr. Barkhurst:

SUBJECT:

SAFETY EVALUATION FOR COMBUSTION ENGINEERING OWNERS GROUP REPORT CEN-387-P, REVISION 1, " PRESSURIZER SURGE LINE THERMAL STRATIFICATION EVALUATION" (BULLETIN 88-11) (TAC NO. M72180)

By letter dated March 3, 1989, you responded to NRC Bulletin 88-11 and indicated that Waterford 3 was participating in the Combustion Engineering Owners Group (CE0G) effort to evaluate pressurizer surge line thermal stratification. The staff and its consultant, Brookhaven National Laboratory, have completed their review of the CE0G Report CEN-387-P, " Pressurizer Surge Line Flow Stratification." The staff concludes that the CE0G analysis adequately demonstrates that the bounding surge line and nozzles meet ASME Code stress and fatigue requirements for the.40-year design life of the-facility considering the phenomenon of thermai stratification and thermal striping.

The staff's safety evaluation of CEN-387-P, Revision 1, is enclosed.

Action 1.d of Bulletin 88-11 required licensees to update their stress and fatigue analyses to ensure compliance with applicable Code requirements. The CE0G Report can be used to update plant-specific Code stress reports as required by Item 1.d.

Please verify the applicability of the CEOG bounding analysis in CEN-387-P, Revision 1, to Waterford 3.

In addition, please confirm that all actions required by Bulletin 88-11,. including the updating of the plant-specific stress and fatigue analyses required by Action 1.d, have-been completed.

Your response is requested within 180 days of receipt of this letter.

N$ $5

~

^

k 9306250129 930622 I

ADOCK 0500 2

gDR

C Mr. Ross P.~ Barkhurst This request is covered by Office of Management and Budget Clearance Number

[

3150-0011, which expires June 30,' 1994. The estimated average number of burden hours was already accounted for in the original bulletin, NRC Bulletin o

88-11, " Pressurizer Surge Line Thermal Stratification", dated March 29, 1989.

Sincerely, I

L 1

ORIGINAL SIGNED BY:

David L. Wigginton, Senior Project Manager Project Ditectorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page DISTRIBUTION Docket File NRC & Local PDRs PD4-1 Reading D. Wigginton E. Adensam T. Chan P. Noonan ACRS (10) (P-315)

OGC (15B18)

J. Roe A. B. Beach, RIV J. Shea (14E21)

=

0FC LA:PD4-ll y PM:PM.I' D:PD4-1 NAME PNoondn[

DWighton:pk TChan (3 /P f93

//R/93 DATE (WA93 l

COPY YE h YES/NO YES/b) v 0FFICIAL RECORD COPY Document Name: WAT72180.ltr

Mr. Ross P. Barkhurst This request is covered by Office of Management and Budget Clearance Number 3150-0011, which expires June 30, 1994. The estimated average number of burden hours was already accounted for in the original bulletin, NRC Bulletin 88-11, " Pressurizer Surge Line Thermal Stratification", dated March 29, 1989.

Sincerely,

/

4 savid L.

  1. linton, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page l

Mr. Ross P. Barkhurst Entergy Operations, Inc.

Waterford 3 cc:

Mr. Hall Bohlinger, Administrator Regional Administrator, Region IV Radiation Protection Division U.S. Nuclear Regulatory Commission Office of Air Quality and Nuclear Energy 611 Ryan Plaza Drive, Suite 1000 Post Office Box 82135 Arlington, Texas 76011 Baton Rouge, Louisiana 70884-2135 Resident Inspector /Waterford NPS Mr. John R. McGaha Post Office Box 822 Vice President, Operations Killona, Louisiana 70066 Support Entergy Operations, Inc.

Parish President Council P. O. Box 31995 St. Charles Parish Jackson, Mississippi 39286 P. O. Box 302 Hahnville, Louisiana 70057 William A. Cross Bethesda Licensing Office Mr. Harry W. Keiser, Executive Vice-

'3 Metro Center President and Chief Operating Officer Suite 610 Entergy Operations, Inc.

Bethesda, Maryland 20814 P. O. Box 31995 Jackson, Mississippi 39286-1995 Mr. Robert B. McGehee Wise, Carter, Child & Caraway Chcirman P.O. Box 651 Louisiana Public Service Commission Jackson, Mississippi 39205 One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Mr. D. F. Packer i

General Manager Plant Operations Mr. R. F. Burski, Director Entergy Operations, Inc.

Nuclear Safety P. O. Box B Entergy Operations, Inc.

Killona, Louisiana 70066 P. O. Box B Killona, Louisiana 70066-Mr. L. W. Laughlin, Licensing Manager Entergy Operations, Inc.

i P. O. Box B Killona, Louisiana 70066 Winston & Strawn Attn:

N. S. Reynolds 1400 L Street, N.W.

Washington, DC 20005-3502 i

i 4

-