Application for Amends to Licenses DPR-77 & DPR-79, Consisting of Proposed Change 93-08,revising Allowable Values for Intermediate & Source Range neutron-flux Reactor Trip Setpoints
ML20045C633
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/17/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045C634 List:
References
NUDOCS 9306240097
Download: ML20045C633 (2)


Text

o I

1 e.

l A

Tennessee Valley Authonty Post Office Box 2000. Soddy-Daisy Tennessee 37379-2000 Robert A. Fenech vice President, Sequoyah Nuclear Plant June 17, 1993 TVA-SQN-TS-93-08 10 CFR 50.90-U.S. Nuclear Regulatory Commission ATTN: Document Control' Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 93-08,

" REVISION OF REACTOR TRIP ALLOWABLE VALUES FOR INTERMEDIATE-RANGE AND SOURCE-RANGE NEUTRON FLUX" s

In accordance with 10 CFR 50.90, we are enclosing a requested amendment to Licenses DPR-77 and DPR-79 to change the T3a of SQN Units 1 and 2.

The proposed change revises the allowable values for-the intermediate-and source-range neutron-flux reactor trip setpoints. The present value for the intermediate range is 1.ess than or equal to 30 percent of rated thermal power (RTP) and would be changed to less than or equal to 45.20 thanorequagto1.3x10gangepresentlyhasanallowablevalueofless percent RTP.

The source counts per second (CPS) and would be changed to 1.45 x 10 CPS. This change affects Items 5 and 6 of TS Table 2.2-1 for both units.

1 The proposed TS change is identified in Enclosure 1.

The justification for the proposed TS change is provided in Enclosure 2.

A proposed determination of no significant hazards consideration performed pursuant i

to 10 CFR 50.92 is provided in Enclosure 3.

The determination of-l demonstrated accuracy for the proposed allowable values is provided in j.

TVA requests a 45-day implementation period for.this TS change following l'

issuance, j

l l

l

%!?000i l

9306240097 930617~

I l

PDR_ ADDCK 05000327

}

-P PDR- :

t

1 l

v U.S. Nuclear Regulatory Commission Page 2 June 17, 1993 Please direct questions concerning this issue to Keith C. Weller at (615) 843-7527.

Sincerely, hbY

  • JL Robert A. Fenech Sworn to and subscr ed before me this /7 fA day of

_ 1993 6(sbbex_-)

Notary Pubiic My Commission Expires b/ 7/ 9'7

/

Enclosures i

ec (Enclohm es):

Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tennessee 37243-1532 NRC Resident Inspector Sequoyah Nuclear. Plant i

2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711