ML20045C082

From kanterella
Jump to navigation Jump to search
Confirms Plans to Hold Meeting on 930701 at Glen Ellyn,Il to Discuss Violation Re Fact That Both Divs of Post Accident Monitoring for Wide Range Drywell Pressure Technically Inoperable at Same Time for Longer than 48 H
ML20045C082
Person / Time
Site: Fermi 
Issue date: 06/18/1993
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
References
EA-93-154, NUDOCS 9306220057
Download: ML20045C082 (2)


Text

~

\\\\

,A V

JUN 16 E93 Docket No. 50-341 License No. NPF-43 EA 93-154 The Detroit Edison Company ATTN:

D. R. Gipson Senior Vice President Nuclear Operations 6400 North Dixie Highway Newport, Michigan 48166

Dear Mr. Gipson:

This confirms our plans as discussed between Mr. M Phillips of this office and Mr. R. Newkirk of your staff to hold a meeting at 11 a.m. (EDT) on Thursday, July 1,1993, at the NRC Region III office, 799 Roosevelt Road, Glen Ellyn, Illinois.

This meeting is an enforcement conference to discuss the apparent violation concerning the fact that both divisions of the Post Accident Monitoring for wide range drywell pressure were technically inoperable at the same time for longer than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> as a result of multiple breakdowns in_ the modification and installation process for the associated engineering design package. At the enforcement conference you should be prepared to address the issues identified '

Inspection Report No. 50-341/93012(DRP).

While this meeting is considered a presentation and discussion forum between the Detroit Edison Company and the NRC, tne meeting will be opened to any other interested parties as observers in accordance with the Commission's trial program. Those persons outside the licensee and NRC staffs should inform the NRC Regional office of their intent to attend.

We appreciate your cooperation in this matter.

If you have any questions regarding this meeting, please contact Mr. Monte Phillips of my staff at (708) 790-5530.

Sincerely, C:1cL=a " W O

Edward G. Greenman, Director Division of Reactor Projects See Attached Distribution-g

]

W e

RII [

RI, 3 RI 6

\\,11 M

I g>t'.$t A

Tongue P

,ips P

S p

reenman

/

IGf(f5 bflW ^ (.

f 0

193

~a oo *n d

9306220057 930618 PDR ADOCK 05000341 O.

PDR-

,=

- = -

o,,

4 The Detroit Edison Company 2-Distribution John A. Tibai, Supervisor of Compliance P. A. Marquardt, Corporate Legal Department LOC /LFOCB Resident Inspector, RIII

- James R. Padgett, Michigan Public Service Commission Michigan Department of Public Health Monroe County Office cf Civil Preparedness Fermi, LPM, f4RR H. J. Miller, RIII

]'

l

-1 j

?

a l

I

.