Text
a
- t,
-
JUN 161993
p
9
Docket Nos. 50-454; 50-455
Q
%
,\\ '
Commonwealth Edison Company
ATTN: Mr. L. O. DelGeorge
Vice President, Nuclear Oversight
and Regulatory Services
Executive Towers West III
1400 Opus Place, Suite 300
Downers Grove, IL 60515
Dear Mr. DelGeorge:
This refers to the routine safety inspection conducted by Messrs.
H. Peterson, C. H. Brown, and D. E. Jones of this office from May 1,1993
through June 1, 1993.
The inspection included a review of activities at your
Byron Station, Units 1 and 2._ At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of a selective examination of procedures.
and representative records, observations, and interviews with personnel.
'
During this inspection period, certain of your activities appeared to be in
violation of NRC requirements. However, the violation satisfied the criteria
of 10 CFR Part 2, Appendix C, " General Statement of Policy and Procedure for
NRC Enforcement Actions,"Section VII.B, " Mitigation of Enforcement
Sanctions;" therefore, a Notice of Violation was not issued.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original Signed by Martin J. Fa: Der
dOMi
Martin a. Farber, Chief
Reactor Projects Section lA
Enclosure:
Inspection Report Nos.
50-454/93008(DRP);
50-455/93008(DRP)
See Attached Distribution
R 1
RIII
RIII
RIII
1h
.
3dfb
11v
M
La sfnan
McCormick-Barger
Rhusman
Farber
(y/k93
6//4/g3
blhil%
MN)
g(
9306220019 930616
"
ADOCK 05000454
l'
O
\\
'
i
.
_
,
,
.
,
.I
Commonwealth Edison Company
2
JUN 161993
i
Distribution
,
,
cc w/ enclosure:
,
K. Graesser, Site Vice President
G. Schwartz, Station Manager
D. Brindle, Regulatory Assurance
,
Supervisor
D. Farrar, Nuclear Regulatory Services
'
Manager
-
OC/LFDCB
Resident Inspectors, Byron,
Braidwood, Zion
R. Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
Licensing Project Manager, NRR
R. Newmann, Office of Public Counsel,
State of Illinois Center
i
R. M. Thompson, Admi",tstrator, Wisconsin
Division of Emergency Government
State Liaison Officer
Chairman, Illinois Commerce Commission
l
i
bcc: PUBLIC - IE01
-l
,
!
l
<
r
P
'!
n
,
1
1
-
-
,.
.
-
-
-
-
.