Corrected Page 3/4 7-14 of Amend 54 to Licenses NPF-37 & NPF-66
ML20045B721
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/14/1993
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20045B722 List:
References
NPF-37-A-054, NPF-66-A-054 NUDOCS 9306180350
Download: ML20045B721 (1)


Text

- - -

PLANT SYSTEMS LIMITING CONDITION FOR OPERATION (Continued) p ACTION (Continued _1 c.

With one essential service water makeup pump inoperable, within l

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> either:

1)

Restore the inoperable essential service water makeup pump to OPERABLE status, or

}

2)

Verify that the sme train deep well pump is OPERABLE with both UHS cooling tower basin levels 2 82%.

Continue to verify both basin levels are 2 82% every two hours and restore the inoperable essential service water makeup pump to OPERABLE status within *7 days.

(*This can be extended to 14 days for l

Essential Service Water Makeup pump inspection and extended maintenance during the time when at least one unit is in MODE 5 or 6.) The provisions of Specification 3.0.4 are not appl icable.

3)

Otherwise be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

d.

With the essential service water pump discharge water temperature not meeting the above requirement, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

e.

1)

With c.._ UHS cooling tower basin switch inoperable:

a)

Restore the level switch to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or verify both basin levels are 2 82%-within the next hour and every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> thereafter. The provisions of Specification 3.0.4 are not applicable.

b)

Otherwise be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

2)

With hoth UHS cooling tower basin level switches inoperable:

a)

Restore one level switch to OPERABLE status within I hour and follow the provisions of 3.7.5.e.1 above, or verify both basin levels are 2 82% within the next hour and every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> thereafter. The provisions of Specification 3.0.4 are not applicable.

b)

Otherwise be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

3)

With any. UHS cooling tower basin level switch inoperable for more than 30 days, prepare and submit a special report to the Commission pursuant to Specification 6.9.2 within the next la days outlining the cause of the inoperability and the plans for restoring the switch (es) to OPERABLE i

status.

f.

With Rock River water level forecasted by NWS to exceed 702.0 feet MSL:

9306180350 930614 PDR ADOCK 05000454 p

PDR BYRON - UNITS 1 & 2 3/4 7-14 AMENDMENT NO. 54