ML20045B628

From kanterella
Jump to navigation Jump to search
Forwards Rev 11 to FSAR Update for Jm Farley Nuclear Plant, Units 1 & 2. Rev Reflects Changes to Facility,Procedures or TS & Info or Analyses Submitted to NRC or Prepared Per NRC Requirements from Jan-Dec 1992
ML20045B628
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/08/1993
From: Woodard J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045B629 List:
References
NUDOCS 9306180165
Download: ML20045B628 (2)


Text

y. . - - ,

a

[rc o r 1

sh:q $.y[h. Southern Nucicht Operating' Company y J6 4

. Post Offv> Bot 12ki '

- ' Birmingtrm. Attema 35201.

h; . ,.ti1 1 Telephone 205 668-5086 '

+

J. D. Woodard Southem Nuclear Operating Company Vice President . the southem electric systern Farley Project 10 CFR.50.71 [

June 8, 1993 DocketcNos.;50-348

'~

50-364 U. S. Nuclear Regulatory Commission ATTN: Document' Control Desk-Washington, DC 20555 Joseph M. Farley Nuclear Plant Revision 11 to the Final Safety Analysis Report (FSAR) Update Gentlemen:

In accordance' with the requirements of 10 CFR 50.71(e), Southern Nuclear Operating Company (SNC) hereby submits Revision 11 to the Joseph M. Farley Nuclear Plant -: Units 1 and 2 FSAR Update. This submittal includes revised FSAR1information which accurately reflects (1) changes made to the facility, procedures, or technical specifications, and (2) information or analyses submitted.to the Commission or prepared pursuant'to Commission-requirements, from January 1, 1992 through December 31, 1992. Additionally, the.

information submitted includes changes identified in the annual report under

the' provisions.of 10 CFR 50.59(b). As required, this submittal is provided on a replacement-page. basis, and is accompanied by an effective page list that identifies the current pages of the FSAR.

Pursuant to 10 CFR 50.4(b), the original and 10 copies are being submitted to the Commission's Document Control Desk, and a copy is also being supplied to the NRC. Region II office'and the NRC Resident Inspector.

In accordance with the rule change for 10.CFR 50.71(e)(4) that allows revisions to be filed 6 months after- each refueling outage, SNC. plans to start filing revisions to'the FSAR Update 6 monthe after each Unit 1 outage.

.Therefore, Revision 12 to the FSAR Update will t iled six months following

,' completion of the next Unit- 1 refueling outage pr< 3ently ' scheduled for the spring of 1994.-

If you have any questions, please advise.

t Respectfully submitted, rd

'DRC:clt-RV11FSAR.DRC 1 Enclosures 9306180165 930608 PDR ADOCK 05000348 D W

4

^ '

.cc: Mr. S. D. Ebneter. 17001b I g'

Mr. T. A. Reed' (w/o Enclosures) k/

'Mr.1G. F. Maxwell-c

+ ,  :

']

@ r.S t > .;

~

':/

i BEFORE THE ,

UNITED STATES NUCLEAR REGULATOR) COMMISSION T

Unit No. 1 - Docket No. 50-348 Unit'No. 2 - Docket No. 50-364

^

~

REVISION N0. 11 '

TO '

THE FINAL SAFETY ANALYSIS REPORT UPDATE FOR J. M. FARLEY NUCLEAR PLANT

' UNIT NOS. 1 AND 2 UNDER THE' ATOMIC ENERGY ACT OF 1954  ;

t Southern Nuclear 0perating Company hereby files Revision 11'to its Final

. Safety Analysis Report Update for Farley Units I and 2. ,

This revision consists of updated pages' for the Final Safety Analysis. Report.

SOUTHERN NUCLEAR OPERATING COMPANY  !

By \k J. D. WoodardM Vice-President i

SWORN TO AND SUBSCRIBED BEFORE ME  ;

-THIS . W DAY 0F h ,'1993..

- Q de A uf Nop/Public

. My Commission Expires: 9-/Y F h

P e,

, -)