ML20045B590

From kanterella
Jump to navigation Jump to search
Forwards Initial Exam Rept 50-213/93-05OL Administered During Wk of 930426-30
ML20045B590
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/09/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20045B591 List:
References
NUDOCS 9306180103
Download: ML20045B590 (3)


See also: IR 05000213/1993005

Text

-

___

_

.

_.

4

Docket No.' 50-213 -'

M

0E

Mr. John F. Opeka-

Executive Vice President - Nuclear

Connecticut Yankee Atomic Power Company

P. O. Box 270

Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT: INITIAL EXAMINATION REPORT NO. 50-213/93-05 (OL)

.

During the week of April 26 . 30,1993, the NRC administered initial examinations to twelve

employees of your company who had applied for licenses to operate the Haddam Neck Plant.

The examinations evaluated knowledge and abilities important to safety, and were conducted

. in accordance with NUREG-1021, " Operator Licensing Examiner Standards," Rev 7.

The results of the examinations were that all six senior reactor operator and five of six

reactor operator candidates passed all exam sections and were issued licenses. One reactor.

operator candidate failed the written examination and was denied a license. Details of exam .

grading and generic strengths and weaknesses are discussed in the enclosed report. Of note

was the higher than expected incidence of minor errors in execution of Emergency Operating

Procedures made by senior reactor operator candidates.

.

. Should you have any questions concerning this examination, please contact me at

.215-337-5291.

Sincerely,

Original Signed By:

Lee H. Bettenhausen

Lee H. Bettenhausen, Chief

r

Operations Branch

Division of Reactor Safety

Enclosure: Examination Report No. 50-247/93-05 (OL)

with Attachments 1,2, and 3

,.

'

"

,

.9306180103.930609-

' PDR -ADDCK 05000213

V-

PDR

,

so

e

m

_

-

Mr. John F. Opeka

2

Attachments:

1. Written Examinations and Answer Keys

2. Facility Comments and NRC Resolution

- 3. Simulation Facility Report

cc w/ encl; w/o Attachments 1 - 3:

J. P. Stetz, Vice President

W. D. Romberg, Vice President - Nuclear, Operations Services

G. H. Bouchard, Nuclear Unit Director

D. O. Nordquist, Director of Quality Services

R. M. Kacich, Director, Nuclear Licensing

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

NRC Resident Inspector

State of Connecticut

cc w/ encl. and Attachments 1 - 3:

B. Ruth, Manager, Operator Training

M. Bray, Assistant Supervisor - Operator Training

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

bec w/ encl; w/o Attachments 1 - 3:

J. D'Antonic, Chief Examiner, DRS

Art Lopez, PNL

Larry Sherfey, PNL-

OL Facility File

bec w/ encl and Attachments 1 - 3:

Master Exam File

bec with concurrences and w/ encl; w/o Attachments 1 - 3:

Region I Docket Room

bec w/ encl; w/o Attachments (VIA E-MAIL):

J. Stolz, NRR/PD I-4

V. McCree, OEDO

A. Wang, PM, NRR

R. Gallo, Chief, OLB, NRR

OFFICIAL RECORD COPY

G:HN9305.IER

t

!

,

,

Mr. John F. Opeka

3

g g3

NOTIFY VIA E-MAIL AND NO ATTACHED FILE:

L. Bettenhausen, DRS

G. Meyer, DRS

J. D' Antonio, DRS

l

h

!

,

.

RI:DRS

RI:DRS

RI:DRS

D' Antonio /dmg

Meyer

Bettenhausen

b 93

06/(/93

g93

0

OFFICIAL RECORD COPY

G:HN9305.IER

- -

. .

. . .

.

.

..