Forwards Insp Repts 50-456/93-11 & 50-457/93-11 on 930517- 28.No Violations Noted
ML20045B558
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 06/10/1993
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20045B559 List:
References
NUDOCS 9306180068
Download: ML20045B558 (2)


See also: IR 05000456/1993011

Text

lTi

dragg

~ UNITED STATES

c

.

' k.,

NUCLEAR ' REGULATORY l COMMisslON

3

.g.

REGION Ill"

.

.{

J$

2

799 ROOSEVELT ROAD

'i

%

cLEN Ettyn. itunOss soist

...e

l

Jl1N 101993

l

r

I

i

Docket No. 50-456

'

Docket No. 50-457

Commonwealth Edison. Company

,

ATTN: Mr. L. O. DelGeorge

1

'

Vice President

Nuclear Oversight and

Regulatory . Services

. Executive Towers West III

i

1400 Opus Place, Suite 300

l

Downers Grove, IL 60515

.l

Dear Mr. DelGeorge:

-l

f

This refers to the inspection conducted by Mr. A. Dunlop of this office on

!

May 17-28, 1993. The inspection included a review of authorized activities

!

for your Braidwood Nuclear Power Station, Units 1 and 2. - At the conclusion of

the inspection, the findings were discussed with those members of-your staff.

identified in the enclosed report.

j

.

.

.

-.

i

The areas examined during the inspection are identified in the report. These~

j

.

areas consisted primarily of a review of the Braidwood program for inservice

4

testing (IST) of pumps and . valves. Within these areas, the inspection

.

,

consisted of a selective examination of' procedures and representative records,

'

observations, and' interviews with personnel.

No violations of NRC requirements were identified during the course of this.

inspection.

'

l

One unresolved item is identified.in the report.

The item concerns stroke

l

timing power operated valves in one direction only when the valve has a safety '

{

function in both directions. This appears to be inconsistent with ASME

Section XI Code and NRC guidance issued with Generic Letter 89-04. .In

addition, we are concerned that neither your engineering personnel'nor your

quality verification process identified that a number'of. valves with safety

related functions had not been included in the IST program. You are requested

j

- to respond.to the unresolved item within 60 days of-your. receipt of.this

.

,

report.

Your response should include your evaluation of the issue and, if

1

.

applicable, your intended corrective action.

In accordance with 10 CFR 2.790 of.the Commission's regulations, a copy of:

this letter, the enclosure,'and your re'sponses to this letter will be placed.

in the NRC Public Document Room.

-,

I

9306180069 930610

PDR4 ADOCK 05000456

G

PDR

u_

\\

l

. . Pudu cMo /

- i

..

,

. .

.

'

.

l

Commonwealth Edison Company

2

301993

.

The responses directed by this letter are not subject to the clearance

procedures of the Office of Management and Budget as required by the Paperwork

Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

1

G. C. Wright, Chief

Engineering Branch

Enclosure:

Inspection Reports

No. 50-456/930ll(DRS);

No. 50-457/930ll(DRS)

cc w/ enclosure:

'

S. Berg, Site Vice President

K. Kofron, Station Manager

A. Haeger, Regulatory Assurance

Supervisor

D. Farrar, Nuclear Regulatory

Services Manager

OC/LFDCB

,

Resident Inspectors-Byron,

Braidwood, Zion

D. W. Cassel, Jr. , Esq.

Richard Hubbard'

J. W. McCaffrey, Chief,

Public Utilities Division

Licensing Project Manager, NRR

Robert Newmann, Office of Public

Counsel, State of Illinois Center

State Liaison Officer

Chairman, Illinois Commerce

Commission

J. Norberg, NRR/EMEB

T. Kobetz, TSS, DRP

,