RELEASEDTOTHE PDR NOTATION V O T E-6//V/9%
- l
~
RESPONSE-SHEET
,,, fag,,,,,,,, jegs,,,,j i
T0:
SAMUEL J. CHILK, SECRETARY OF THE' COMMISSION FROM:
COMMISSIONER CURTISS j
SUBJECT:
SECY-93-112 - PROPOSED RULEMAKING TO ELIMINATE REQUIREMENT OF PRIOR COMMISSION i
APPROVAL FOR A SPECIFIC LICENSE FOR AN.ISFSI UNDER 10 CFR PART 72 t
APPROVED DISAPPROVED ABSTAIN ~
]
Nor PARTICIPATING REQUEST DISCUSSION i
COMMENTS:
Q (He<hl c23.
l l
l 9306160414 930513 AM
$0$aeEENSes$e'poa MMAWE_
RELEASE-VOTE
/x/
5-/3-93 DATE.
WITHHOLD VOTE
/
~/ j 50003
[g-ENTERED'ON'"AS"
.YES
-x No~
1
i
~
3 i
designed and constructed for interim spent fuel storage, after t
use of the nuclear fuel as a source of energy in a nuclear power reactor, until its shipment to the U.S. Department of Energy's planned geologic repository for disposal of radioactive waste.
Part 72 is limited in scope to the temporary storage (up to 20 J;
years with renewal at the option of the NRC) of spent fuel in an a :
This rulemaking proposes a change to jthe Commission's procedures for the issuance of a specific ISFSI fI
)
license to a qualified applicant.
'l l
Discussion i
l The Commission is proposing to amend the procedures that I
authorize the NRC Director of Nuclear Material Safety and j
Safeguards (or the Director's designee) to issue a. specific license for the interim storage of spent fuel in an ISFSI under
[
t 10 CFR Part 72, after the NRC completes a comprehensive, i
documented, public health and safety review; prepares an environmental assessment and determines that issuing the license would conform to all statutory and-regulatory requirements; and j
after an opportunity for a public hearing has been offered and i
4 any requested hearing is complete.
The amendment would end the I
i current internal practice under which the Director obtained the Commission's' express authorization for each ISFSI license, after the NRC review and determination that a license should be issued i
[;
g
,a
+
5
._w