James E. Cross Vice President and Chief Nuclear Officer June 9,
1993 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Dear Sirs:
Resoonse to Bulletin 93-02 Portland General Electric Company (PGE) has permanently ceased power operation of the Trojan Nuclear. Plant (TNP). PGE provided certification to the Nuclear Regulatory Commission (NRC) on February 2, 1993 that the reactor fuel was permanently off-loaded from the reactor vessel and placed in the spent fuel pool. The NRC issued Amendment 190 on May 5, 1993 which modified the Trojan Operating License to a i
possession only license.
Due to the plant condition described above, a loss-of-coolant accident (LOCA) is no longer possible at the TNP and consequently the Emergency Core Cooling System (ECCS) is no longer necessary.
Therefore, PGE will not be taking action relative to NRC Bulletin 93-02.
Sincerely, d' :- ': {
i 2000eg.
9306160325 930609 Il PDR ADOCK 05000344
{
O PDR 1: ^
g 12: S W Nem St/d Pouni Oregm 97234 (503) 464-8ea7
(/
i i
Document Control Desk June 9,
1993 i
Pace 2 c:
Mr. Bobby H.
Faulkenberry_
Regional Administrator, Region V U.
S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. James Melfi NRC Resident Inspector Trojan Nuclear Plant f
I y
i i
N
j 3
d j
l 4
4 il
)
STATE OF OREGON)
)
l COUiTY OF COLUMBIA)
{
)
i f
i I, James E. Cross, being duly sworn, subscribe to and say that I am the l
Vice President and Chief Nuclear Officer for Portland General Electric Company, the applicant herein that I have full authority to execute this
}
oath; that I have reviewed th>t foregoing; and that to the best of my i
knowledge, information, and 1elief the statements made in it are true.
i b !T 1993 Date fA i
f
)
.es E. Cross ice President and Chief Nuclear Officer
+
i i
i I
t l
On this day personally appeared before me James E. Cross, to me known to 1
l be the individual who executed the foregoing instrument, and acknowledged i
I that he signed the same as his free act.
l
\\
GIVEN under my hand and seal this W day of dLML
._, 1993.
i I
l 1f!AY]h. h 6tLLOON O ' O '(?-.
Notary Public in and for the hg li State of Oregon i
d kihY '
M Qg /t/
Residing at UCM 1A)
.{
My commission expires 3'Br3-TY
.e.:<
. w g.
-.