Forwards Vogtle Electric Generating Plant Unit 1 Reactor Containment Bldg Integrated Leakage Rate Test Rept for Apr 1993, Final Rept
ML20045A959
Person / Time
Site: Vogtle 
Issue date: 06/04/1993
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045A960 List:
References
LCV-0015, LCV-15, NUDOCS 9306150391
Download: ML20045A959 (1)


Text

IE b

Georg>a Power Company

'I 40 inverness Corner Pa+way

'O' Post OHce Box 1295

_i i

Bt:mvige.am, A!absma'35201 l

Teleprere 205 877-7122 '

(

L t

C. K. McCoy Geore,iaPower j

c Vce Pres; dent. Nuclear I

Vog'le Pro:ect the southEwn electnc system June 4, 1993 LCV-0015 l

Docket Nos. 50-424

'i i

U. S. Nuclear Regulatory Commission ATTN. Document Control Desk l

Washington, D. C. 20555 l

. VOGTLE ELECTRIC GENERATING PLANT REACTOR CONTAINMENT BUILDING INTEGRATED LEAKAGE RATE TEST REPORT '

j Gentlemen:

Attached is the test report for the second periodic Reactor Containment Building Integrated Leakage Test for Vogtle Electric Generating Plant (VEGP) Unit 1. The test l

was completed on March 20,1993. All measured leakage rates met acceptance limits; therefore, in accordance with Technical Specifications the current test schedule will be.

maintained.

Sincerely, C. K. McCoy

'[

+

CKM/HWM/gmb l

Attachment xc: Georgia Power Company i

Mr. W. B. Shipman Mr. M. Sheibani NORMS ll U. S. Nuclear Regulatory Comminipn Mr. S. D. Ebneter, Regional' Administrator Mr. D. S. Hood, Licensing Project Manager, NRR

i

- Mr. B. R. Bonser, Senior Resident Inspector, Vogtle l

1 3 50 t)). 3 Oh t

.i L

4 9306150391 930604 Q

g{

i l

PDR ADOCK 05000424

]gf _

P

. ppg

-