ML20045A959
| ML20045A959 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/04/1993 |
| From: | Mccoy C GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20045A960 | List: |
| References | |
| LCV-0015, LCV-15, NUDOCS 9306150391 | |
| Download: ML20045A959 (1) | |
Text
IE b
Georg>a Power Company
'I 40 inverness Corner Pa+way
'O' Post OHce Box 1295
_i i
Bt:mvige.am, A!absma'35201 l
Teleprere 205 877-7122 '
(
L t
C. K. McCoy Geore,iaPower j
c Vce Pres; dent. Nuclear I
Vog'le Pro:ect the southEwn electnc system June 4, 1993 LCV-0015 l
Docket Nos. 50-424
'i i
U. S. Nuclear Regulatory Commission ATTN. Document Control Desk l
Washington, D. C. 20555 l
. VOGTLE ELECTRIC GENERATING PLANT REACTOR CONTAINMENT BUILDING INTEGRATED LEAKAGE RATE TEST REPORT '
j Gentlemen:
Attached is the test report for the second periodic Reactor Containment Building Integrated Leakage Test for Vogtle Electric Generating Plant (VEGP) Unit 1. The test l
was completed on March 20,1993. All measured leakage rates met acceptance limits; therefore, in accordance with Technical Specifications the current test schedule will be.
maintained.
Sincerely, C. K. McCoy
'[
+
CKM/HWM/gmb l
Attachment xc: Georgia Power Company i
Mr. W. B. Shipman Mr. M. Sheibani NORMS ll U. S. Nuclear Regulatory Comminipn Mr. S. D. Ebneter, Regional' Administrator Mr. D. S. Hood, Licensing Project Manager, NRR
- i
- Mr. B. R. Bonser, Senior Resident Inspector, Vogtle l
1 3 50 t)). 3 Oh t
.i L
4 9306150391 930604 Q
g{
i l
PDR ADOCK 05000424
]gf _
P
. ppg
-