Forwards Vogtle Electric Generating Plant Unit 1 Reactor Containment Bldg Integrated Leakage Rate Test Rept for Apr 1993, Final Rept
ML20045A959
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/04/1993
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045A960 List:
References
LCV-0015, LCV-15, NUDOCS 9306150391
Download: ML20045A959 (1)


Text

IE ,

b Georg>a Power Company 'I 40 inverness Corner Pa+way

'O' Post OHce i Box 1295 _i

,' Bt:mvige.am, A!absma'35201 Teleprere 205 877-7122 ' l

(

L t C. K. McCoy Geore,iaPower c j Vce Pres; dent. Nuclear the southEwn electnc system I Vog'le Pro:ect June 4, 1993  !

LCV-0015 l Docket Nos. 50-424 'i i

U. S. Nuclear Regulatory Commission ATTN. Document Control Desk l Washington, D. C. 20555 l

. VOGTLE ELECTRIC GENERATING PLANT REACTOR CONTAINMENT BUILDING .

INTEGRATED LEAKAGE RATE TEST REPORT ' j Gentlemen:  ;

Attached is the test report for the second periodic Reactor Containment Building .

Integrated Leakage Test for Vogtle Electric Generating Plant (VEGP) Unit 1. The test l; was completed on March 20,1993. All measured leakage rates met acceptance limits; therefore, in accordance with Technical Specifications the current test schedule will be .  !

maintained. .

Sincerely, C. K. McCoy '[

+

CKM/HWM/gmb l Attachment  !

xc: Georgia Power Company i Mr. W. B. Shipman Mr. M. Sheibani -

NORMS ll U. S. Nuclear Regulatory Comminipn Mr. S. D. Ebneter, Regional' Administrator Mr. D. S. Hood, Licensing Project Manager, NRR :i

- Mr. B. R. Bonser, Senior Resident Inspector, Vogtle l 1

3 50 t)). 3 t Oh .i l

L 4 9306150391 930604 Q g{ i PDR ADOCK 05000424 l P . ppg ]gf _ .

. . . . . - -