Confirms Plans Discussed to Hold Meeting on 930621 in Glen Ellyn,Il to Discuss Enforcement Conference Re Four Apparent Violations
ML20045A859
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 06/04/1993
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20045A860 List:
References
EA-93-162, NUDOCS 9306150110
Download: ML20045A859 (2)


Text

'

yt{

41993 Q

Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 EA 93-162 Commonwealth Edison Company ATTN: Mr. L. O. DelGeorge Vice President, Nuclear Oversight and Regulatory Services Executive Towers West III 1400 Opus Place, Suite 300 Downers Grove, IL 60515

Dear Mr. De1 George:

This confirms our plans as discussed between Mr. F. J. Jablonski of this-office and Ms. M. A. Jackson of your staff to hold a meeting beginning at 9:00 a.m. (CDT) on Monday, June 21, 1993, at the NRC Region III Office, 799 Roosevelt Road, Building 4, Glen Ellyn, Illinois.

This meeting is an enforcement conference to discuss the circumstances surrounding the following four apparent violations at your Quad Cities Nuclear Power Station:

(1)

Your operation of Unit 2 with the Unit 1 RHR Service Water Sys' tem Loop A (opposite unit / shared safe shutdown (SSD) equipment) inoperable for more than 67 days; (2)

Failure to test fire protection equipment in accordance with established procedures; (3)

Failure to establish a test program for certain 10 CFR 50, Appendix R SSD equipment; and (4)

Failure to take timely corrective action.

At the enforcement conference you should be prepared to discuss the apparent violations as identified in Inspection Report 50-254/265-93009(DRS).

Additionally, you should be prepared to discuss whether the operation of Unit 2 without the Unit 1 RHR Service Water System Loop A in-service would have resulted in the inability to achieve or maintain Unit 2 in a safe shutdown condition given a design basis fire.

You should also be prepared to discuss the significance of not testing certain SSD equipment, including operability determinations and compensatory measures.

9306150110 930604 PDR ADDCK 05000254 0

PDR

4 MN Commonwealth Edison Company 2

We appreciate your cooperation in this matter and will gladly discuss any questions you have concerning this meeting.

,ncerely,td 4C W

Sip 14dward G. Greenman, birector i Division of Reactor Projects cc:

R. Pleniewicz, Site Vice President R. Bax, Station Manager A. Misak, Regulatory Assurance Supervisor D. Farrar, Nuclear Regulatory Services Manager OC/LFDCB Resident Inspectors, Quad Cities, Dresden, LaSalle, Clinton R. Hubbard J. W. McCaffrey, Chi.r, Public Utilities Division Licensing Project Manager, NRR R. Newmann, Office of Public Counsel, State of Illinois Center State Liaison Officer Chairman, Illinois Commerce Commission H. J. Miller, RIII J. Lieberman, OE J. Partlow, NRR J. Soldberg, OGC J. Dyer, NRR bcc:

PUBLIC-IE01 RIII RI RIII.

RIII gKA4<r p%

mbame Ja nski Wright MaFtin 06404/93 06/04/93 06/04/93 06/04/93 fh/

t i

R I RQI RII RIl l

D

[

Y

(%N

&l} Jh DIFa)ytte Hland Clayton usman Greenman 06/04 93 06/04/93 h06/04/93 06/04/93 06/04/93