ML20045A847
| ML20045A847 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/09/1993 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20045A848 | List: |
| References | |
| NUDOCS 9306150071 | |
| Download: ML20045A847 (4) | |
See also: IR 05000424/1993012
Text
.
.
M 0 9 Im
Docket Nos. 50-424, 50-425
Georgia Power Company
ATTN: Mr. W. G. Hairston, III
Senior Vice President
Nuclear Operations
i
P. O. Box 1295
Birmingham, AL 35201
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
i
(NRC INSPECTION REPORT NOS. 50-424/93-12 AND 50-425/93-12)
'
'
This refers to the inspection conducted by W. W. Stansberry of this office on
May 10-14, 1993. The inspection included a review of activities authorized
for your Vogtle Electric Generating Plant facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
-
identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
.
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
i
Violation (Notice).
You are required to respond to this letter and should follow the instructions
,
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
-
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
,
inspections, the NRC will determine whether further NRC enforcement action is
)
necessary to ensure compliance with NRC regulatory requirements.
)
The material enclosed herewith contains Safeguards Information as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the
_
material will ng1 be placed in the NRC Public Document Room.
.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
'
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
.__a40022 SAFEGUARDS INFORMAT!0N
- - . . - - -
====-
-
go
.
g
m,
g
.
I 3.
.
Mf0gjgg3
Georgia Power Compisy
2
i
Should you have any aue.;tions cormerning this W
r, please contact us.
Sincerely,
!
.
Douglas M. Collins, Chief
,
Nuclear Materials Safety and
Safeguards Branch
Division of Radiation Safety
and Safeguards
Enclosures:
1.
(Safeguards Information)
,
2.
NRC Inspection Report
(Safeguards Information)
cc w/encls:
>
R. P. Mcdonald
Executive Vice President
Nuclear Operations
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
.
i
C. K. McCoy
1
Vice President-Nuclear
Georgia Power Company
,
P. O. Box 1295
Birmingham, AL 35201
W. B. Shipman
General Manager
Nuclear Operations
Georgia Power Company
P. O. Box 1600
Waynesboro, GA 30830
J. A. Bailey
Manager-Licensing
,
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
cc w/ Inspection Summary:
(See page 3)
l
t
i
SIFEGUMDS !NFORMATION
_ . - - - -
k
- . - - - -
dMd?OfL hM $6paf8Isd If0M
~
erscbsipeg, IN, doc 1%et is decoTmfied
.
!
.
.
SAFEGlJAR)S INFORMA710N
Georgia Power Company
3
I N O 9 1933
cc w/ Inspection Summary:
Nancy G. Cowles, Counsel
,
Office of the Consumer's
Utility Council
84 Peachtree Street, Nw, Suite 201
Atlanta, GA 30303-2318
Office of Planning and Budget
Room 615B
270 Washington Street, SW
Atlanta, GA 30334
Office of the County Commissioner
Burke County Commission
Waynesboro, GA 30830
Harold Reheis, Director-
Department of Natural Resources
205 Butler Street SE, Suite 1252
Atlanta, GA 30334
Thomas Hill, Manager
R3dioactive Materials Program
Department of Natural Resources
4244 International Parkway
Suite 114
Atlanta, GA 30354
Dan H. Smith
Vice President
Power Supply Operations
i
Oglethorpe Power Corporation
2100 E. Exchange Place
Tucker, GA 30085-1349
Attorney General
Law Department
132 Judicial Building
Atlanta, GA 30334
Charles A. Patrizia, Esq.
Paul, Hastings, Janofsky
and Walker
12th Floor
1050 Connecticut Avenue, NW
Washington, D. C.
20036
bec w/encls:
NRR/DRIS/SB
bcc w/ Inspection Summary:
(See page 4)
]
- ==== ==
SA FIGilAiiDS INFORMATi0h
- - - - , . _
.
evtzM t% doeurwed is deco **Nd
i
'%
..
<
g - , z. ,, e. . . . . .ME"kbusavv swihopiAll Oil,
, .
. . . _ , . , ,
.
u
Georgia Power Company
4
NIN 0 $ 199)
bec w/ Inspection Sumary:
P. Skinner, RII
'
A. Herdt, RII
D. Hood, NRR
'
Document Control Desk (RIDS IE04), 016
NRC Resident Inspector
U.S. Nuclear Regulatory Com.
P. O. Box 572
Waynesboro, GA 30830
!
?
,
>
!
RII:pSS
RII:[RS
RII DE
!
WWS d is erry
{dRMSuie
PS nner
06/3/93
06/h/93
06/
/93
I
,
,
I
t
n
.'
n
m,,.mruu- m
- 3g iiNFORMATION
,,'
.
.
ded
p.entattt$ &#M4rve U'N'IS%WhMS %ephfiffd if #ftnu
.
inI0 N Jtyt
,~.n_-. .
__
-