ML20045A847

From kanterella
Jump to navigation Jump to search
Forwards Partially Withheld Insp Repts 50-424/93-12 & 50-425/93-12 on 930510-14 (Ref 10CFR73.21).Noncited Violation Identified
ML20045A847
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/09/1993
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20045A848 List:
References
NUDOCS 9306150071
Download: ML20045A847 (4)


See also: IR 05000424/1993012

Text

.

.

M 0 9 Im

Docket Nos. 50-424, 50-425

License Nos. NPF-68, NPF-81

Georgia Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President

Nuclear Operations

i

P. O. Box 1295

Birmingham, AL 35201

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

i

(NRC INSPECTION REPORT NOS. 50-424/93-12 AND 50-425/93-12)

'

'

This refers to the inspection conducted by W. W. Stansberry of this office on

May 10-14, 1993. The inspection included a review of activities authorized

for your Vogtle Electric Generating Plant facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

-

identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

.

activities in progress.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

i

Violation (Notice).

You are required to respond to this letter and should follow the instructions

,

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

-

actions you plan to prevent recurrence. After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

,

inspections, the NRC will determine whether further NRC enforcement action is

)

necessary to ensure compliance with NRC regulatory requirements.

)

The material enclosed herewith contains Safeguards Information as defined by

10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited

by section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the

_

material will ng1 be placed in the NRC Public Document Room.

.

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

'

by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

.__a40022 SAFEGUARDS INFORMAT!0N

- - . . - - -

====-

-

go

.

g

m,

g

.

I 3.

.

Mf0gjgg3

Georgia Power Compisy

2

i

Should you have any aue.;tions cormerning this W

r, please contact us.

Sincerely,

!

.

Douglas M. Collins, Chief

,

Nuclear Materials Safety and

Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosures:

1.

Notice of Violation

(Safeguards Information)

,

2.

NRC Inspection Report

(Safeguards Information)

cc w/encls:

>

R. P. Mcdonald

Executive Vice President

Nuclear Operations

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

.

i

C. K. McCoy

1

Vice President-Nuclear

Georgia Power Company

,

P. O. Box 1295

Birmingham, AL 35201

W. B. Shipman

General Manager

Nuclear Operations

Georgia Power Company

P. O. Box 1600

Waynesboro, GA 30830

J. A. Bailey

Manager-Licensing

,

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

cc w/ Inspection Summary:

(See page 3)

l

t

i

SIFEGUMDS !NFORMATION

_ . - - - -

k

- . - - - -

dMd?OfL hM $6paf8Isd If0M

~

erscbsipeg, IN, doc 1%et is decoTmfied

.

!

.

.

SAFEGlJAR)S INFORMA710N

Georgia Power Company

3

I N O 9 1933

cc w/ Inspection Summary:

Nancy G. Cowles, Counsel

,

Office of the Consumer's

Utility Council

84 Peachtree Street, Nw, Suite 201

Atlanta, GA 30303-2318

Office of Planning and Budget

Room 615B

270 Washington Street, SW

Atlanta, GA 30334

Office of the County Commissioner

Burke County Commission

Waynesboro, GA 30830

Harold Reheis, Director-

Department of Natural Resources

205 Butler Street SE, Suite 1252

Atlanta, GA 30334

Thomas Hill, Manager

R3dioactive Materials Program

Department of Natural Resources

4244 International Parkway

Suite 114

Atlanta, GA 30354

Dan H. Smith

Vice President

Power Supply Operations

i

Oglethorpe Power Corporation

2100 E. Exchange Place

Tucker, GA 30085-1349

Attorney General

Law Department

132 Judicial Building

Atlanta, GA 30334

Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky

and Walker

12th Floor

1050 Connecticut Avenue, NW

Washington, D. C.

20036

bec w/encls:

NRR/DRIS/SB

bcc w/ Inspection Summary:

(See page 4)

]

==== ==

SA FIGilAiiDS INFORMATi0h

- - - - , . _

.

evtzM t% doeurwed is deco **Nd

i

'%

..

<

g - , z. ,, e. . . . . .ME"kbusavv swihopiAll Oil,

, .

. . . _ , . , ,

.

u

Georgia Power Company

4

NIN 0 $ 199)

bec w/ Inspection Sumary:

P. Skinner, RII

'

A. Herdt, RII

D. Hood, NRR

'

Document Control Desk (RIDS IE04), 016

NRC Resident Inspector

U.S. Nuclear Regulatory Com.

P. O. Box 572

Waynesboro, GA 30830

!

?

,

>

!

RII:pSS

RII:[RS

RII DE

!

WWS d is erry

{dRMSuie

PS nner

06/3/93

06/h/93

06/

/93

I

,

,

I

t

n

.'

n

m,,.mruu- m

3g iiNFORMATION

,,'

.

.

ded

p.entattt$ &#M4rve U'N'IS%WhMS %ephfiffd if #ftnu

.

inI0 N Jtyt

,~.n_-. .

__

-