Forwards Insp Repts 50-454/93-09 & 50-455/93-09 on 930524- 28.Noncited Violation Noted
ML20045A832
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/08/1993
From: Snell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20045A833 List:
References
NUDOCS 9306150044
Download: ML20045A832 (2)


See also: IR 05000454/1993009

Text

r- -

O to

,.

a

.

JUN 0 81993

>

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN: Mr. L. O. DelGeorge, Vice President

Nuclear Oversight and

Regulatory Services

Executive Towers West III

1400 Opus P1 ace, Suite 300

Downers Grove, IL 60515

Dear Mr. DelGeorge:

SUBJECT:

ROUTINE RADIATION PROTECTION INSPECTION AT BYRON NUCLEAR POWER

'

STATION

This refers to the routine safety inspection conducted by Messrs. T. J. Kozak

and D. W. Nelson of this office on May 24 - 28, 1993. The inspection included

a review of authorized activities for your Byron Nuclear Power Station. At

the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of a selective examination of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements. However, as described in the enclosed inspection report,

the violation was categorized at Severity Level V and is not being cited

i

because the criteria specified in Section VII.B of the " General Statement of

Policy and Procedures for NRC Enforcement Actions" (Enforcement Policy,10 CFR

,

Part 2, Appendix C), were satisfied.

l

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

i

9306150044 930608

I

I

l

J

PDR

ADOCK 05000454

G

PDR

4

..

Commonwealth Edison Company

2

JUN 0 81993

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed By William Snell

'

William Snell, Chief

Radiological Controls Section 2

Enclosure:

Inspection Reports

No 50-454/93009(DRSS);

No. 50-455/93009(DRSS)

cc w/ enclosure:

K. Graesser, Site Vice President

G. Schwartz, Station Manager

i

D. Brindle, Regulatory Assurance

Supervisor

D. Farrar, Nuclear Regulatory

l

Services Manager

OC/LFDCB

Resident Inspectors, Byron,

j

Braidwood, Zion

Richard Hubbard

'

J. W. McCaffrey, Chief, Public

.

Utilities Division

Licensing Project Manager, NRR

Robert Newmann, Office of Public

Counsel

Robert M. Thompson, Administrator

Wisconsin Division of Emergency

Government

State liaison Officer

Chairman, Illinois Commerce

Commission

I. Johnson, Corporate

EP Director

,

bcc w/ enclosure:

PUBLIC

RIII

RIII

RII

RIII

K

/dg

!

on

F rber

06/ 6 /93

ge/fy