ML20045A724

From kanterella
Jump to navigation Jump to search
Fire Barrier Breach & Failure to Establish Fire Watch Per TS
ML20045A724
Person / Time
Site: Sequoyah 
Issue date: 06/07/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045A725 List:
References
NUDOCS 9306110271
Download: ML20045A724 (2)


Text

L s,.

A Tennessee Valley Auttaty Post OSce Box 2000. Soddy-Dasy. Tennessee 3?3732000 Robert A. Fenech Vce Pres. dent. Sequoyah Nuclear Rant

~

June 7, 1993

(

U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555 Gentlemen:

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT UNIT 1 - DOCKET NO. 50-327 - FACILITY OPERATING LICENSE DPR LICENSEE EVENT REPORT (LER) 50-327/93011 The enclosed LER provides details concerning a fire barrier breach and the failure to establish a fire watch as required by technical specifications (TSs).

This event is being reported in accordance with 10 CFR 50.73(a)(2)(1)(B) as an operation prohibited by TSs.

Sincerely, ef $.- " A Robert A. Fenech Enclosure cc:

See page 2 h0ffK05000327 )k 930607 PD 5

PDR

U.S. Nuclear Regulatory Commission Page 2 June 7, 1993 cc (Enclosure);

7 INP0 Records Center

'i Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. D. E. LaBarge, Project Manager

[

U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600.Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 i

Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 f

r I

t a

l

.5 i

.i l