ML20045A528
| ML20045A528 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/08/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20045A529 | List: |
| References | |
| NUDOCS 9306110032 | |
| Download: ML20045A528 (5) | |
See also: IR 05000445/1993020
Text
-
'
UNITED STATES
q>Q MGuq$g
NUCLEAR REGULATORY COMMISSION
y,
,
REGION IV
[
611 RYAN PLAZA DRIVE. SUITE 400
o
<,
e
Alt LINGTON, T E XAS 76011-8064
.....
JUN - 8 EB
Dockets:
50-445
50-446
Licenses: NPF-87
NPF-89
TV Electric
ATTN:
W. J. Cahill, Jr., Group Vice President
Nuclear Engineering and Operations
Skyway Tower
400 North Olive Street, L.B. 81
Dallas, Texas 75201
SUBJECT: NRC INSPECTION REPORT 50-445/93-20; 50-446/93-20
This refers to the inspection conducted by Mr. W. B. Jones, and the inspectors
identified in the enclosed report, of this office, on April 26 through May 13,
1993. The inspection included a review of activities authorized for the
Comanche Peak Steam Electric Station, Units 1 and 2, facility. At the
conclusion of the inspection, the findings were discussed with you and those
members of your staff identified in the enclosed report.
This special inspection was conducted to assess Unit 2 operation up through
the 50 percent power ascension testing plateau.
The focus of the inspection
was to evaluate plant operations, the effectiveness of management ' controls,
and the implementat:on of the safety assessment program. This included
conduct of operational activities, startup test witnessing, identification and
resolution of plant deficiencies, and self-assessment activities. Within
these areas the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress. The results of this inspection are documented on
pages 1-3 in the enclosed report.
In accordance with 10 CFR Section 2.790 of the NRC's " Rules of Practice," a
copy of this letter and its enclosure will be placed in the NRC's Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased'
to discuss them with you.
Sincerely,
,-
(
-
W
'
i
,
.
A. Bill Beach, Dire
'
roheds
I
r
Division of Reactor
r
1
9306110032 930608
J
ADOCK 05000445
/ {} {
g
G
g
,
i
-
- .-
- -
-
-.
-
-
.
-.
!
. . -
.
e
TV Electric
-2-
,
Enclosure:
Appendix - NRC Inspection Report
i
50-445/93-20; 50-446/93-20 w/ attachment
cc w/ enclosure:
TV Electric
-
ATTN:
Roger D. Walker, Manager of
Regulatory Affairs for Nuclear
Engineering Organization
Skyway Tower
.
'
400 North Olive Street, L.B. 81
Dallas, Texas 75201
i
Juanita Ellis
President - CASE
1426 South Polk Street
1
'
Dallas, Texas 75224
GDS Associates, Inc.
Suite 720
1850 Parkway Place
i
Marietta, Georgia 30067-8237
TU Electric
'
Bethesda Licensing
3 Metro Center, Suite 610
Bethesda, Maryland 20814
Jorden, Schulte, and Burchette
ATTN: William A. Burchette, Esq.
Counsel for Tex-La Electric
Cooperative of Texas
1025 Thomas Jefferson St., N.W.
,
Washington, D.C.
20007
Newman & Holtzinger, P.C.
ATTN: Jack R. Newman, Esq.
,
1615 L. Street, N.W.-
- ;
Suite 1000
i
'
. Washington, D.C.
20036
Texas Department of Licensing & Regulation
i
ATTN:
G. R. Bynog, Program Manager /-
Chief Inspector
t
Boiler Division
P.O. Box 12157, Capitol Station
,
I
l
1
l
,
e
-
.n-
-
.
-
.
-. .
-
.
.
..
-
-
-
.
.
.
.
.
.
TU Electric
-3-
'
Honorable Dale McPherson
County Judge
-
P.O. Box 851
>
Glen Rose, Texas 76043
t
Texas Radiation Control Program Director
1100 West 49th Street
Owen L. Thero, President
'
Quality Technology Company
P.O. Box 408
201 West 3rd
.. ;
Lebo, Kansas 66856-0408
!
i
l
r
-
1
l
I
'I
!
l
'
i
-
a
1
-
l
-
'
.
_
-
..
-
_ - . . _ .
-
_
.
-
.
. 4
.
4
JUN - 81993
TV Electric
-4-
-
bcc to DMB (IE01)
bec distrib, by RIV:
J. L. Milhoan
Resident Inspector (2)
Section Chief (DRP/B)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/B)
Section Chief (DRP/TSS)
T. Taylor, RIII
A. B. Beach, D/DRP
RIV: SRI:DRP/B
RI:DRP/B
SRI:DRP/B
PE:DRP/B*
WBJones:ww
GEWerney
DNGraves/
TReis
6 7 /9hf/
/ /93
b /h
6 / 7 /d3}/
6 / 7 /93
/
/
RIII/R:RJ ",
RI:DRS/kk*,
C:DRS/k' n E:DRS/PS*
C:l)R$7PS
C:DRP/B /
S
TTaylork[c/
DLKell$dy DAPowersk JWhittemoreLble
LAYandelk
6 ~7 /93
/ /93
G/ 7/93
4/>/93[
6/3 /93 knk b/1/93
/
DD:DRP nW D:DRP &j
TPGwynn
MBBeach
f
'
(,/I/93
1 (,/(/93
- Previously concurred
,
1
P
1
. ' '
,1
.
JUN - 8 1993
TV Electric
-4_
bccnto.DMB (IE01)-
bec distrib. by RIV:
J. L. Milhoan
Resident Inspector (2)
Section Chief (DRP/B)
Lisa Shea, RM/ALF, MS: MNb8 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/B)
Section Chief (DRP/TSS)
T. Taylor, RIII
A. B. Beach, D/DRP
E""
.
-
RIV: SRI:DRP/B
RI:DRP/B
SRI:DRP/B
PE:DRP/B*
,
WBJones:wys _
GEWerney
DNGraves/
TReis
6 / 7 /93
(o / 7 /d3h G /7 /9$$/
/ /93
RIII/R:R)
RI:DRS/k*,
C:DRS/kS u E:DRS/PS*
C:QRT/PS
C:DRP/B /
TTaylorh[c/
DLKellMib DAPowersk JWhittemoreLble
LAYandelk
,
6/3 /93 Hb b/1/93
I./7/93
/ /93
G/ 7/93
4/>/93[
DD:DRP nW
D:DRP &s/
TPGwynn
MBBeach
0
'
[,/I/93
y (/I/93
- Previously concurred