ML20045A505
| ML20045A505 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/07/1993 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20045A506 | List: |
| References | |
| NUDOCS 9306110011 | |
| Download: ML20045A505 (3) | |
See also: IR 05000483/1993006
Text
..
.
-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
- _ _ _ _ _ _ _ _ _ _ _
~
-
Ob?l
'I DS3
Docket No. 50-483
Union Electric Company
ATTN: Mr. Donald F. Schnell
Senior Vice President - Nuclear
<
'
Post Office Box 149 - Mail Code 400
St. Louis, MO 63166
.
Dear Mr. Schnell:
The enclosed report refers to the inspection conducted by Mr. D. Shepard and
Mr. R. Bailey of this office on May 17 - 21, 1993. The inspection evaluated
.
'
activities at the Callaway Plant authorized by NRC Operating License
No. NPR-30. We discussed our inspection findings with Mr. J. Blosser and
members of your staff at the exit interview on May 21, 1993.
The purpose of the inspection was to assess the licensed operator
requalification program. The inspectors reviewed training administrative
i
,
procedures, representative records, requalification training materials, and
I
observed licensed operators during requalification examination administration.
Additionally, the inspectors interviewed members of the operations and
training staffs.
Overall, the inspectors concluded that the licensed operator requalification
l
training program was being implemented in accordance with 10 CFR Part 55
'
requirements.
However, one open item regarding training administration
'
procedures was identified.
We request that you respond within 60 days of the date of this letter to Open
Item 50-483/93006-01 as discussed in Section 2.1.1 of this report.
Your
response should include the actions that you have taken or plan to take with
your licensed operator requalification program to ensure that licensed
t
operators have the ability to perform required plant control manipulations.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements.
However, the violation will not be subject to
enforcement action because your efforts in identifying and correcting the
violation meet the criteria specified in Section VII.B of the " General
Statement of Policy and Procedures for NRC Enforcement Actions," (Enforcement
Policy, 10 CFR Part 2, Appendix C (1992)), were satisfied.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed report will be placed in the NRC Public Document
Room.
.,
i
9306110011 930607
ADDCK 0S000483
0
'
,
.
.
.lUN - 71933
Union Electric Company
2
We will gladly discuss any questions you may h.we concerning this inspection.
.
Sincerely,
'
ORIGINAL SIGNFD BY T. O. MARTIN
T. O. Martin, Acting Director
'
Division of Reactor Safety
Enclosures:
1.
Inspection Report
No. 50-483/93006(DRS)
2.
Simulation Facility Report
,
cc w/ enclosures:
G. L. Randolph, Vice President,
Nuclear Operations
J. V. Laux, Manager Quality
Assurance
S. E. Sampson, Supervising
Engineering, Site Licensing
OC/LFDCB
Resident Inspector, RIII
Region IV
Resident Inspector, Wolf Creek
K. Drey
C. John Renken, Engineer
,
Policy & Federal Dept.
Gerald Charnoff, Esq.
R. A. Kucera, Deputy Director,
Department of Natural Resources
W. Jessop, Plant Training Manager
L. R. Wharton, LPM, NRR
R. Gallo, LOLB, NRR
_'
M. W. Hodges, RI
A. F. Gibson, RII
S. J. Collins, RIV
K. E. Perkins, Jr., RV
B. Boger, RCHF, NRR
J. S. Wermiel, HFAB, NRR
bec w/ enclosures: PUBLIC-IE42:
,
RIII
RIII
RIII
RIII
RIII
RIII
'
[--------------See Following Page-------------------------------]
@S
Shepard /ds/cg
Bailey
Burdick
Jackiw
Ring
Martin
06/ /93
06/ /93
06/ /93
06/ /93
06/ /93
06/7/93
d b Oli -s n
.1 0
_ _
,
.
.
JUN - 7 EG3
Union Electric Company
2
We will gladly discuss any questions you may have concerning this inspection.
Sincerely,
T. O. Martin, Acting Director
Division of Reactor Safety
Enclosures:
1.
Inspection Report
No. 50-483/93006(DRS)
2.
Simulation Facility Report
cc w/ enclosures:
G. L. Randolph, Vice President,
Nuclear Operations
J. V. Laux, Manager Quality
Assurance
S. E. Sampson, Supervising
Engineering, Site Licensing
OC/LFDCB
Resident Inspector, RIII
Region IV
Resident Inspector, Wolf Creek
K. Drey
C. John Renken, Engineer
Policy L Federal Dept.
Gerald Charnoff, Esq.
R. A. Kucera, Deputy Director,
Department of Natural Resources
W. Jessop, Plant Training Manager
L. R. Wharton, LPM, NRR
B. Gallo, LOLB
.
.bcc w/ enclosures:
PUBLIC-IE42
,
,
i
RIII @
RIII
Ril,J
J1 I L
R .I
RIII-
1Ci
bl$ f41
$2
b
- (See Previous Page)
l
Shepard /ds/cg
Bailey
Burdi_ck
Jack'iw
Ring
Martin
06/ 3 /93
06/j/93
06/q/93
06/f/93
06/t//93
06/ /93
/
,
.
.