Amend 90 to License NPF-43,revising TS Re Testing of EDG Fuel Oil
ML20045A455
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/07/1993
From: Bill Dean
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20045A456 List:
References
NUDOCS 9306100297
Download: ML20045A455 (5)


Text

.-.

e+# "a

~

  1. i uq,?h UNITED STATES

[. 4 L!

j NUCLEAR REGULATORY COMMISSION WASHINoToN, D.C. 20556-0001 o

%..w.s]

DETROIT EDIS0N COMPANY DOCKET NO. 50-341 FERMI-2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 90 License No. NPF-43 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by the Detroit Edison Company (the licensee) dated September 28, 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter I;

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment -

and paragraph 2.C.(2) of Facility Operating License No. NPF-43 is hereby amended to read as follows:

9306100297 930607 PDR ADOCK 05000341 P

^

PDR

4,

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.

90, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

Deco shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effect ve as of the date of its issuance with full implementation within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION DL k lE[,

William M. Dean, Acting D. rector Project Directorate III Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

June 7, 1993 i

f F

e a

i ATTACHMENT TO LICENSE AMENDMENT NO. 90 FACILITY OPERATING LICENSE N0. NPF-43 DOCKET N0. 50-341 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.

REMOVE INSERT 3/4 8-3*

3/4 8-3*

3/4 8-4 3/4 8-4 i

t

  • 0verleaf page provided to maintain document completeness.

No changes contained on these pages.

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS 4.8.1.1.1 Each of the above required independent circuits between the offsite transmission network and the onsite Class 1E distribution system shall be detemined OPERABLE at least once per 7 days by verifying correct breaker alignments and indicated power availability.

4.8.1.1.2 Each of the above required diesel generators shall be demonstrated OPERABLE:

a.

In accordance with the frequency specified in Table 4.8.1.1.2-1 on a STAGGERED TEST BASIS by:

1.

Verifying the fuel level in the day fuel tank.

2.

Verifying the fuel level in the fuel storage tank.

3.

Verifying the fuel transfer pump starts and transfers fuel from the storage system to the day fuel tank.

4.

Verifying the diesel starts from ambient condition and accelerates to at least 900 rpm in less than or equal to 10 seconds.* The generator voltage and frequency shall be 4160 1 420 volts and 60 1 1.2 Hz within 10 seconds after the start signal.

The diesel generator shall be started for this test by using one of the following signals:

a)

Manual, b)

Simulated loss-of-offsite power by itself.

c)

Simulated loss-of-offsite power in conjunction with an ESF actuation test signal.

d)

An ESF actuation test signal by itself.

5.

Verifying the diesel generator is synchronized, loaded to greater than or equal to an indicated 2500-2600 kW in less than or equal to 150 seconds,* and operates with this load for at least 60 minutes.

6.

Verifying the diesel generator is aligned to provide standby power to the associated emergency busses.

]

7.

Verifying the pressure in all diesel generator air start I

receivers to be greater than or equal to 215 psig.

j l

  • All diesel generator starts for the purpose of this Surveillance Requirement 1

may be preceded by an engine prelube period.

The diesel generator start (10 sec)/ load (150 sec) from ambient conditions shall be performed at least once per 184 days in these surveillance tests.

All other engine starts for the purpose of this surveillance testing may be preceded by other warmup procedures recommended by the manufacturer so that the mechanical stress and wear on the diesel engine is minimized.

FERMI - UNIT 2 3/4 8-3

ELECTRICAL POWER SYSTEMS SURVEllLANCE RE0VIREMENTS (Continued) b.

By removing accumulated water:

1.

From the day tank at least once per 31 days and after each occasion when the diesel is operated for greater than I hour, and 2.

From the storage tank at least once per 31 days.

c.

By sampling new fuel oil in a:cordance with ASTM D4057-88 prior to l

addition to the storage tanks and.:

1.

By verifying in accordance with the tests specified in ASTM D975-91 prior to addition to the storage tanks that the j

sample has:

a)

An API Gravity of within 0.3 degrees at 60*F or a specific gravity of within 0.0016 at 60/60*F, when compared to the supplier's certificate or an absolute specific gravity at 60/60*F of greater than or equal to 0.83 but less than or equal to 0.89 or an API gravity at 60*F of greater than or equal to 27 degrees but less than or equal to 39 degrees.

b)

A kinematic viscosity at 40*C of greater than or equal to 1.9 centistokes, but less than or equal to 4.1 centistokes, if gravity was not determined by comparison with the supplier's certification.

c)

A flash point equal to or greater than 125'F, and d)

A clear and bright appearance with proper cobr when tested in accordance with ASTM D4176-86.

l 2.

By verifying within 31 days of obtaining the sample that the other properties specified in Table 1 of ASTM D975-91 are met when tested in accordance with ASTM D975-91.

d.

At least once every 31 days by obtaining a sample of fuel oil from the storage tanks in accordance with ASTM D2276-88, and verifying l

that total particulate contamination is less than 10 mg/ liter when checked in accordance with ASTM D2276-88, Method A.

l At least once per 18 months, during shutdown, by:

e.

1.

Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service.

FERMI - UNIT 2 3/4 8-4 Amendment No. 90

..