ML20045A180
| ML20045A180 | |
| Person / Time | |
|---|---|
| Issue date: | 05/27/1993 |
| From: | Surmeier J NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Chernoff A ENERGY, DEPT. OF |
| References | |
| REF-WM-54 NUDOCS 9306090487 | |
| Download: ML20045A180 (1) | |
Text
_
MAY 2 71993 Mr. Albert R. Chernoff, Project Manager Uranium Mill Tailings Remedial Action N oject Office U.S. Department of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerque, New Mexico 87115
Dear Mr. Chernoff:
We have reviewed Project Interface Document (PID) 05-S-56, dated May 10, 1993.
The Class I PID addresses the proposed reconfiguration of the tailings embankment top slope, and the addition of a transition zone between contaminated materials and the radon barrier at the Grand Junction Uranium Mill Tailings Remedial Action Project site.
Based on review by the Nuclear Regulatory Commission staff, we concur in DOE's proposed changes as described in the PID.
If you have any questions regarding the above, please contact me at 301-504-3439 or the NRC Project Manager, Daniel Rom at 301-504-2573.
Sincerely, ORIGINAL SnNED BY John J. Surmeier, Chief Uranium Recovery Branch Division of Low-level Waste Management and Decommissioning Office of Nuclear Material Safety and Safeguards cc:
J. Stelmach, DOE /AL S. Hamp, DOE /AL C. Cormier, DOE DISTRIBUTION:
Central. File # -
NMSS r/f RBangart WBrach JAustin MFliegel LLWM r/f RHall,URF0 LCallan,RIV TLJohnson EBrummett i Ma r k' Sina11] Boxe sii nTCohpurFshde5 B1 hc kTtM DifliiMDi sRilint i WCapBFs feten;cq OFC LLUR LLUR,,j ;
LLUR, 7 NAME DRom/eb b DGillhnh JSurmeNr DATE 5FI /93 5/2 7/93 5/>h93 S:\\LLWMTYPE\\EDIE\\GRJPID56.DSR OFFICIAL RECORD COP.Y In small Box on "DATE:" line enter: M = E-Mail Distribution Copy H = Hard Ccpy PDR : YES X
NO Category:
Proprietary or CF Only ACNW: YES X
NO Delete file after distribution Yes No IG: YES NO v
1 10
?fl)0 n o 0
gjk(
9306090407 930527 F