MAY 2 81993.
l
.
Docket Nos. 50-334
!
50-412
,
i
Mr. J. D. Sieber
Senior Vice President
Nuclear Power Division
l
Duquesne Light Company
,
Post OfGce Box 4
.i
Shippingport, Pennsylvania 15077
,.
Dear Mr. Sieber:
SUBJECT: COMBINED NRC INSPECTION REPORT NOS. 50-334/93-10; 50-412/93-11 -
An announced ss.fety inspection of the radiological controls program at your facility was
conducted by Mr. J. Nick during the period April 26 - 30,1993. The findings of the
inspection were discussed with members of your staff during the exit' meeting on April 30,.
1993.
!
!
Areas reviewed during the inspection were important to health and safety and are discussed
in the enclosed inspection report. These areas included job coverage during outage
conditions, health physics training, the ALARA progmm, dose assessments and assignments,
,
quality assurance, and instructions to workers.
'
Your staff pmvided good health physics covemge to protect the health and safety of the
radiological area workers. The radiological controls for the steam generator work and the
reactor head lift were appropriate and comprehensive. Adequate information was provided to
.
workers for awareness of the radiological conditions in their work areas. The ALARA
progmm was a signiGcant contribution in lowering total dose and dose rates in some work
.
areas. The self-assessment and surveillance programs continued to promote identification
and resolution of problems in a timely manner.
Within the scope of this inspection, one violation of NRC regulations was identified for
failure to follow radiological control precedures dealing with personnel access control during
i
radiographic operations. This violation will not be subject to enforcement action due to
identification and reasonable corrective action by the your staff in accordance with the
criteria specified in Section VII.B of the Enforcement Policy,10 CFR 2, Appendix C.
i
!
9306080181 93052s
I
OO
i
$
ff^',
a}j llq p
ADOCK 05000334
O
m
,
,
h
m
~
y,
T
.
Duquesne Light Company
2
MAY 2 8 1993
No response to this letter is requimd. Your cooperation with us in this matter is appreciated.
!
Sincemly,
!
OriginalSigned By;
James H.Joyner
.
James H. Joyner, Chief
Facilities Radiological Safety
and Safeguards Section
,
"
Division of Radiation Safety
and Safeguards
Enclosure:
Combined NRC Inspection Report Nos. 50-334/93-10; 50-412/93-11
cc w/ encl:
G. S. Thomas, Vice President, Nuclear Services
D. E. Spoerry, Vice President, Nuclear Operations
L. R. Freeland, Germral Manager, Nuclear Operations Unit
K. D. Grada, Manager, Quality Services Unit
N. R. Tonet, Manager, Nuclear Safety Department
H. R. Caldwell, General Superintendent, Nuclear Operations
,
K. Abraham, PAO (2)
Public Document Room (PDR)
Ixcal Public Document Room (LPDR)
,
Nuclear Safety Infonnation Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
State of Ohio
1
OFFICIAL RECORD COPY
j
,
'
P
- .
- - - -
- -
-
- - -
. -
-
.
. _ . .
_
,..
.
.
I N 2 8 1993
Duquesne Light Company
3
bec w/ encl:
,
Region I Docket Room (with concurrences)
J. Joyner, DRSS
,
W. Pasciak, DRSS
SRI, Perry, Region III
j
bec w/enci (VIA FAIAIL):
'
W. Butler, NRR
G. Iklison, NRR
V. McCree, OEDO
,
,
!
I
t
i
i
i
RI:DRSS
R:
RI:DRSS
.
J. Nick
T . Pa. ak
J. Joy y
g
.-
-
05/k/93
05$ 93
057)d793
)
1
1
OFFICIAL RECORD COPY
,
I