Text
{{#Wiki_filter:1. 2 - tc S: . . MAY 25 WIB Docket Nos. 50-334 50-412 Mr. J. D. Sieber Senior Vice President Nuclear Power Division Duquesne Light Company Post Ofnce Box 4 Shippingport, Pennsylvania 15077 Dear Mr. Sieber: SUBJECT: NRC INSPECTION REPORT NOS. 50-334/93-09 AND 50-412/93-09 AND NOTICE OF VIOLATION This refers to the inspection conducted by Messrs. L. Rossbach, P. Sena, and S. Greenlee of ' this office from April 6 to May 10,1993. The inspection included a review of activities'- authorized for the Beaver Valley Power Station _ in Shippingport, Pennsylvania. ' At the' conclusion of the inspection, the findings were discussed with Mr. D. Spocrry and other members of your staff. _ Areas examined during the inspection are identified in the report. The inspection consisted of document reviews, interviews, and observation of activities important to public health and. _ safety. The purpose of the inspection was to determine whether activities authorized by the license were conducted safely and in accordance with NRC requirements. Based on the results of this inspection, certain of your activities' appeared to be in violation / of NRC requirements, as specified in the enclosed Notice of Violation (Notice). Several high head safety injection pump lube oil piping support brackets were found missing - as a result of our inspection. One of these brackets had been previously identified asfmissing by your staff, but this had not been followed up in a timely manner. Although your staff - responded promptly to our inspector's finding and performed a detailed analysis which showed that the system was operable, we are concerned that the identification of a missing -- bracket by your staff did not receive similar attention. We consider this to be a violation of' NRC corrective action requirements. Also, during this inspection period, your staff identified two examples of failure to adhere to-- radiation protection requirements.' These incidents appear to indicate a' weakness in the understanding of some radiation protection requirements by your staff and are also considered a violation of NRC requirements. 9306080140 930525 l PDR' ADOCK 05000334 G PDR ) _ OFFICIAL RECORD COPY q . p
' , .
> , .'! ,
Mr 25 50 ~! Mr. J. D. Sieber 2
- v You are required to respond to this letter and should follow the instructions specified in'the , enclosed Notice when preparing your response. In your response, you should document the j , specific actions taken and any additional actions you plan to prevent recurrence. After - 1 reviewing your response to this Notice, including'your proposed corrective actions and the .. results of future inspections, the NRC will determine whether further NRC enforcement ! action is necessary to ensure compliance with NRC regulatory requirements. l i In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and .i its enclosures will be placed in the NRC Public Document Room. j ' The responses directed by this letter and the enclosed Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction
Act of 1989, Pub. L No. 96.511. j l Sincerely, Oddnal Signed By: hmes C. Linvillo l
! James C. Linville, Chief j Projects Branch No. 3
Division of Reactor Projects - i ! Enclosures: .! 1. Notice of Violation -{ 2. NRC Inspection Report Nos. 50-334/93-09 and 50-412/93-09 ! , cc w/encls: l G. S. Thomas, Vice President, Nuclear Services l D. E. Spoerry, Vice President, Nuclear Operations _j L .R. Freeland, General Manager, Nuclear Operations . Unit ' t K. D. Grada, Manager, Quality Services Unit ! N. R. Tonet, Manager, Nuclear Safety Department i H. R.' Caldwell, General Superintendent, Nuclear Operations j ! K. Abraham, PAO, (2 copies) Public Document Room (PDR) l Local Public Document Room (LPDR) j Nuclear Safety Information Center (NSIC) .i ' NRC Resident Inspector Commonwealth of Pennsylvania ! State of Ohio f ! i 3
i ! ! OFFlQlAI. RECORD COPY 1 - -
. .. . Mr. J. D. Sieber 3 MAY 25 E ! - bec w/encls: Region I Docket Room (with concurrences) SRI, Perry, Region III bec w/enci (VIA FeMAIL): W. Butler, NRR G. Edison, NRR V. McCree, OEDO , 'l--> i RI:DRP RI:DRP RI:DRSS .'. RP L.'Rossbach . s W. Pasciak J. Linvi e - l5}E/93' h' Ik Section 3.0 gl79 4) ,. 5/E5/91 b OFFICIAL RECORD COPY