t
yn
,
JUN 041993
"
,
Docket No.
50-333
Mr. Harry P. Salmon, Jr.
Resident Manager
New York Power Authority
James A. FitzPatrick Nuclear Power Plant
Post Office Box 41
Lycoming, New York 13093
Dear Mr. Salmon:
SUBJECT:
ENGINEERING INSPECTION AT THE JAMES A. FITZPATRICK
NUCLEAR POWER PLANT NRC INSPECTION REPORT NO.
50-333/93-08)
This letter refers to the announced safety inspection of your design change and modification
program conducted by Messrs. L. Prividy and P. Drysdale from March 15,1993 to April 2,
1993 at the James A. FitzPatrick Nuclear Power Plant, Scriba, New York. The results of
this inspection were discussed with you and your staff at the conclusion of the inspection.
'
Areas examined during this inspection are discussed in the enclosed inspection report. The
inspection consisted of selective examinations of plant design changes, physical walkdowns of
modifications, discussions with your personnel responsible for implementing modifications
and observations by our inspectors. The control of plant design changes is important to
'
safety to assure that such changes do not degrade safety systems, structures and components.
.
i
The program for controlling design changes and plant modifications was found to be
effective. Your development of a systematic modification prioitization process was a
notable improvement. Notwithstanding your work accomplishments during the shutdown in
1992, your staff recognized the need for additional progress to reduce the engineering work
backlog consistent with the NYPA Nuclear Generation Business Plan goals.
I
t
F
f
-i
!
!
f
L
9306080130 930604
{/
ADOCK 05000333
'
g
O
w
- .
JUN 041993
,
Mr. Harry P. Salmon, Jr.
2
No response to this letter is required, and your cooperation with us in this matter is
appreciated.
Sincerely,
~
i
Jacque P. Durr, Chief
.
Engineering Branch
I
Division of Reactor Safety
Enclosure: Inspection Report No. 50-333/93-08
l
cc w/ encl:
J. Brons, President
R. Beedle, Executive Vice President - Nuclear
G. Goldstein, Assistant General Counsel
J. Gray, Jr., Director, Nuclear Licensing - BWR
Supervisor, Town of Scriba
,
C. Donaldson, Esquire, Assistant Attomey General, New York Department ofI2w
Director, Energy & Water Division, Department of Public Service, State of New York
K. Abraham, PAO (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York, SLO Designee
i
bec w/ encl:
Region I Docket Room (with concurrences)
-!
bec: (VIA E-MAIL)
V. McCree, OEDO
j
R. Capra, NRR
B. McCabe, NRR
OFFICIAL RECORD COPY A:FITZ9308. INS
f)
.
.
JUN 041993
.
Mr. Harry P. Salmon, Jr.
3
bec w/ Letter, Report Cover Sheet
C. Hehl, DRP
J. Wiggins, DRP
M. Hodges, DRS
W. Lanning, DRS
L. Bettenhausen, DRS
J. Durr, DRS
R. Cooper, DRSS
J. Joyner, DRSS
RI:DRS
RI:DRS
RI:DRS
f
5/lI/93
5/19'93
64/93
OFFICIAL RECORD COPY A:FITZ9308. INS
,