NN 2 3 }$
Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37 Virginia Electric and Power Company ATTN: Mr. W. L. Stewart Senior Vice President - Nuclear 5000 Dominion Boulevard j
Glen Allen, VA 23060
)
Gentlemen:
SUBJECT:
DOCKET NOS. 50-280 AND 50-281 This acknowledges the receipt of your letter of Aprii 12, 1993, which transmitted Revision 28 to the Surry Physical Security Plan.
Our review of the changes has found most of them to be consistent with the provisions of 10 CFR 50.54(p). Accordingly, they are acceptable for inclusion into the plan.
Section 2.3 dealing with vital areas and Chapter 8 dealing with the Independent Spent Fuel Storage Facility have policy implications and have been referred to the Office of Nuclear Reactor Regulation for review.
You will be advised by separate correspondence of our deliberations on these matters.
Several sections require clarification. These are contained in the enclosure to this letter.
These matters were discussed during a teleconference on May 24, 1993, between Mr. Glenn Wilson with your staff and Ms. Orysia Masnyk of this Region.
The enclosure to your letter is being withheld from public disclosure because it contains Safeguards Information and must be protected in accordance with the provisions of 10 CFR Part 73.21.
Should you have any questions concerning this letter, se will be glad to discuss them with you.
Sincerely,s j
LfL L42 '(
hC Ahid2b d5>CL' ouglas M. Coliins, C) ef
)
040051 Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards
Enclosure:
(See page 2) 9306070469 930528 i
PDR ADOCK 05000280 F
PDR gy ip
i
.N 2 j Jgg{
Virginia Electric and Power Company 2
Enclosure:
l Changes Requiring Clarification cc w/ encl:
M. L. Bowling, Jr., Manager Nuclear Licensing Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 M. R. Kansler Station Manager Surry Power Station P. O. Box 315 l
I Surry, VA 23883 Ray D. Peace, Chairman Surry County Board of Supervisors P. O. Box 130 Dendron, VA 23839 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. O. Box 1197 Richmond, VA 23209 Michael W. Maupin Hunton and Williams Riverfront Plaza, East Tower 951 E. Byrd Street Richmond, VA 23219 Robert B. Strobe, M.D., M.P.H.
State Health Commissioner Office of the Commissioner Virginia Department of Health P. O. Box 2448 Richmond, VA 23218 Attorney General Supreme Court Building 101 North 8th Street Richmond, VA 23219 bec w/ encl:
G. Belisle, RII S. Vias, RII B. Buckley, NRR Document Control Desk (RIDS IE04), 016 (bcc w/ encl cont'd - See page 3)
- N 2 d }$33 Virginia Electric and Power Company 3
(bcc w/ encl cont'd)
NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 1, Box 166 Surry, VA 23883 NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 78-A Mineral, VA 23117 RII:Dg4 RII:DRSS p RII: RSS RII:DRP S
13t W
c~T 4 ti84y-i MASNYJC TIL N
MC-ilE SINKul.E I
05/g93 05/
93 05/g/93 05/pr/93 i
I
i 4
m
('
u i )
ENCLOSURE CHANGES REQUIRING CLARIFICATION r
Section 2.22, pages 2-1,2 l
Replace the details of the protected area' barrier construction previously' contained in this section, as required by 10 CFR 73.2(3).
l Section 2.23, page 2-2 i
In reference to the Security Access Control Building replace the previousiplan-commitments:
"Any glass which forms part of the PA barrier is under the-
.t surveillance and control of security personnel to prevent. transgression" and:
" Passages / areas permitting access to SACB not'under the surveillance and control of security personnel are alarmed." _In reference to the protected area portal between the two High Level Intake' Structure replace "When access is permitted, two security personnel, cne et which is armed, are present to' control access." The deletion of these decreased the effectiveness of the pl an.
Section 2.4, page 2-6 q
Replace the previous commitments dealing with the functions of'the defensive-positions as follows:
"Each D.P. officer is responsible for monitoring designated sectors of the Protected Area barrier und Isolation Zone.",
" Annunciators provide audible and visual PA barrier' intrusion alar, indication in the D.P." and "DPs are continuously manned by Security Officers except during an armed response or emergency conditions."
Section 5.4.2, page 5-3 Reincorporate +5e commitment to test the radio communication with the Sheriff's Offie. once each day.