Forwards Rev 31 to Physical Security/Contingency Plan .Submittal Revises Completion Date from 930731 to 1031 for Phase 1 to Permanent Security Upgrade Project.Rev Withheld (Ref 10CFR73.21)
ML20044H081
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/28/1993
From: Schofield B
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9306070362
Download: ML20044H081 (2)


Text

SAFt!GUA1]S

\\ FORMAL 0N iem e m, um, no we.e 9.ee c+ ewma Te,essee nc:

May 28, 1993 U.S.

Nuclear Regulatory Commission ATTN-Document Ccntrol Desk Wa mington, DC 20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYIH NUCLEAR PLANT (SQN) - PHYSICAL SECURITY / CONTINGENCY PLAN (PSP /CP) - REVISION 31, DATED APRIL 5, 1993 Enclosed you will find the subject item and instructions for updating Nuclear Regulatory Commission (NRC) copies 6 through 11.

Revision 31 is being submitted under provisions of 10 CPR 50.54(p).

This submittal revises the completion date from July 31, 1993, to October 31, 1993, for Phase one to the Permanent Security Upgrade Project.

This letter and the enclosed information are being sent by registered mail.

The signed receipt will signify that you have received this information and acknowledge that it contains safeguards material and should be withheld from public disclosure as defined by 10 CFR 73.21.

This receipt provides verification to TVA that NRC's copies of the plan 4

have been updated and the superseded material has been destroyed.

If you have any questions, please telephone Percy Hammons at (615) 751-2*/36.

Sincerely, s. r.

m.,. w.. n. w m.. a e n

..... a n.181 4 0,1 % dL N 5 L *i'u L

f.,

as T: 41

/

Bruce S.

Schofield Manager Nuclear Licensing and Regulatory Affairs

Enclosure:

Copies 6-9 i

cc:

See page 2 SAFEGUARJS

\\ 20RWAT ON i

9306070362 930528 PDR ADDCK 05000327 F

PDR

\\

[.

SAFEGUARDSMFOMA10N I

"e U.S.

Nuclear Regulatory Commission Page 2 May 28, 1993 cc: Mr. Dave LaBarge, Project Chief 1

U.S.

Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 U.S.

Nuclear Regulatory Commission (Copies 10 and 11)

Region II P.O.

Box 2257 Atlanta, Georgia 30301

-, ~.,, ~ <.. _. -... -

f. 'l * q v T ' f :!
  • A 30 h t!f e. 5! I' T r o' t' r

SAFEGUARDS QNFORMATiO