Corrected Notice of Deviation from Insp on 930104-22. Deviation Noted:On 921212,one Instructor Who Performed Auxiliary Operator Training Did Not Meet Requirements of License Procedures TRA-106 or STA-302
ML20044G944
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/19/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20044G941 List:
References
50-445-92-201, 50-446-92-201, NUDOCS 9306070076
Download: ML20044G944 (1)


Text

.

f

.)a APPENDIX B I

i s-

. NOTICE OF DEVIATION j

TV Electric

Dockets
S0-445:

Comanche Peak Steam Electric Station, 50-446 j

Units 1 and 2 Licenses:LNPF-87' NPF-89' j

I

-During an NRC inspection conducted on January 4-22, 1993, a deviation of NRC-j

~

l requirements was identified.

In accordance with:the " General Statement'of j

Policy and Procedure for NRC Enforcement Action",10. CFR Part. 2,: Appendix C,.

-l j

the deviation is listed below:

Section 13.1.3.1 of-the. Final Safety ' Analysis Report L(FSAR)} specifies ~

that auxiliary operators have. a high school. diploma or. equivalent.

FSAR j

Section<13.2.1.2-(4): specifies-that auxiliary operators complete fundamental training, systems classroom training, system observation -

training, and on-the-job training prior to being allowed to operate-j systems.

l Licensee Procedures TRA-106,~"ALARA Training,"; Revision 1, and.STA-302,-

" Station Records," Revision 16,-require that. auxiliary operators be.

l trained by instructors who.are: qualified 'in accordance with these i

procedures, j

Contrary to the above, on December 12,-1992,- several contract: auxiliary l

operators began performing Unit 2 activities, which included operating i

system components for alignment ~ and clearances, without having met all l

FSAR education and training'reuqirements.

In addition, one. instructor

.j who performed auxiliary operator training did not meet the requirements-1 of licensee. Procedures TRA-106 or STA-302 -(446/92201-04).

Your corrective actions to this deviation have been satisfactorilyLreviewed'

{

l and documented in NRC Inspection-Report 50-445/93-16; 50-446/93-16.

l Accordingly, no response'to.this Notice'is required.