ML20044G928
| ML20044G928 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 05/24/1993 |
| From: | Capra R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20044G929 | List: |
| References | |
| GL-91-09, GL-91-9, NUDOCS 9306070051 | |
| Download: ML20044G928 (5) | |
Text
.
t
}
s ceco
.,/
o UNITED STATES
[
}
NUCLEAR REGULATORY COMMISSION 2
WASHINGTON. D.C. 205EH001 gs
/
f POWER AUTHORITY OF THE STATE OF NEW YORK DOCKET NO, 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE l
Amendment No. 189 License No. DPR-59 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Power Authority of the State of New York (the licensee) dated February 22, 1993, complies with the l
standards and requirements of the Atomic Energy Act of 1954, as amended (the Act)'and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; i
C.
There is reasonable assurance (i).that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii).that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to.the common defense and security or to the health and safety of the public; and l
E.
The issuance of.this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements i
have been satisfied.
l 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-59 is hereby l
amended to read-as follows:
L l
]
j l
9306070051 930524
)
DR ADOCK 0500 3
4:
. (2) Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.189, are hereby incorporated in the license. The licensee shall operate the facility-in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance to be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION R&a. [&
Robert A. Capra, Director Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
May 24, 1993 e
i
r ATTACHMENT TO LICENSE AMENDMENT NO.189 FACILITY OPERATING LICENSE NO. DPR-59 DOCKET NO. 50-333 Revise Appendix A as follows:
Remove Paaes Insert Paaes 222c 222c 226 226 I
t l
JAFNPP 3.9 (cont'd) 4.9 (cont'd) 3.
From and after the time both power supplies are made or found moperable the reactor shall be brought to cold condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
G.
REACTOR PROTECTION SYSTEM ELECTHICAL PROTECTION G.
REACTOR PROTECTION SYSTEM ELECTRICAL PROTECTION ASSEMBLIES ASSEMBLIES Two RPS electrical protection assemblies for each inservice The RPS electrical protection assemblies instrumentation shall RPS MG set and inserwce alternate source shall be operable be determined operable by:
3 except as specified below:
I 1.'
Performing a channel functional test each time the plant is 1.
With one RPS electrical protection assembly for an in cold shutdown for a period of more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
supply inoperable, restore the inoperable channel to
. At least once per operating cycle, demonstrating the -
operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or remove the associated '
2.
RPS MG set or alternate power supply from service.
operability of over-voltage, under-voltage and under-frequency protective instrumentation by i
i
'2.
With two RPS electrical protection assemblies for an
- performance of a channel celebration includmg simulated ;
mservice RPS MG set or an inservice altemate power automatic actuation of the protective relays, trippmg logic supply inoperable, restore at least one to operable status and output circuit breakers and verifying the following l
within 30 minutes or remove the associated RPS MG set set pomts:
j or alternate power supply from service.
I i
OVER-VOLTAGE
-s132V-54 second Time Delay l
UNDER-VOLTAGE 2108V s4 second Time Delay.
l i
4 UNDER-FREQUENCY 257HZ s4 second Time Delay l
i Amendment No.
, 189 tcontinued on page 222d) 222c a
b
_._-m
..m m...
' 4.9 BASES (con't)'
4 D.
Battery System Measurements and electrical tests are conducted at
. specified intervals to provide indication of cell condition
' and to deterrrune the discharge capability of the betteries. Performance and service tests are conducted in i
accordance with the recommendations of IEEE 450-1987.
. E.
LPCI MOV indeoendent Power Sucolv Measurement and electrical tests are conducted at i
specified intervals to provide indication of cell condition, to determine the discharge capability of the battery.
Performance and service tests are conducted in i
accordance with the recommendations of IEEE.-
i 450-1987.
F.
Reactor Protectmn Power Sunches Functional tests of the electrical protection assemblies -
l are conducted at specified intervals utilizing a built-in test device and once por operating cycle by performmg an instrument calibration which verifies operation within the limits of Section 4.9.G.
4 4
k L
Amendment No. p. 7f, If4; If7.189 1
226 s
.