Forwards ISI Summary Rept,Zion Generating Station Unit 2, Interval 2,Period 3,Outage 1
ML20044G688
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 05/24/1993
From: Joyce T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20044G689 List:
References
NUDOCS 9306040106
Download: ML20044G688 (1)


Text

_.

i Comm:nweilth Edixn Zion Generging station

$ ion IIliNois 60099 ay 24, M Telephone 708 / 746-2084 U. S. Nuclear Regulatory Commission l

Hashington, DC 20555 l

ATTN: Document Control Desk Attached is the report of the Inservice Inspections performed at Commonwealth Edison Company, Zion Unit 2 from October 24, 1992 through February 13, 1993.

This report is submitted in accordance with the requirements of Article IWA-6000 of Section XI of the ASME Boiler and Pressure Vessel Code, 1980 Edition up to and including the Hinter 1981 Addenda and Zion Technical l

Specifications 4.3.4.C and 6.6.3.B.a.

As indicated, this report applies to the inspections completed for the Interval 2, Period 3, Outage 1 examination program.

If you have any questions regarding the content of this report, please contact Rudy Tolentino of the Zion Station Support Engineering Group at (708) 746-2084 extension 2340.

Sincerely, DMA

_'D T.,

. Joyce Station Manager Zion Station cc: A. Bert Davis, Regional Administrator - RIII J. D. Smith, Senior Resident Inspector - Zion I

C. Y. Shiraki, Project Manager - NRR i

R. Tamminga (w/o att)

M. Lohmann (w/o att)

M. Rauckhorst (w/o att)

R. Chrzanowski (w/o att)

M. Pigon (w/o att)

S. Stimac (w/att)

R. Tolentino (w/att)

S. Kaplan (w/att)

Master file 1

020000

/g EP 258k M8gh

.o PDR