ML20044G594

From kanterella
Jump to navigation Jump to search
Notification of 930518 Meeting W/Util in Rockville,Md to Discuss Status of Repowering LACBWR W/Natural Gas
ML20044G594
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 05/24/1993
From: Pittiglio C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Joseph Austin
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9306030363
Download: ML20044G594 (2)


Text

,

_n 9

'r 0-

[fCic_

g

. UNITED STATES

) a[

ug J

.j NUCLEAR REGULATORY COMMISSION j

~*

WASHINGTON, D.C. 20666-0001 i.

l MAY 2'41993 Docket No. 50-409 MEMORANDUM FOR: John H. Austin, Chief I

Decomissioning and Regulatory -

Issues Branch Division of Low-Level Waste Management 1-i and Decomissioning Office of Nuclear Material Safety and Safeguards FROM:

Clayton L. Pittiglio, Project Manager

^

Decomissioning and Regulatory Issues Branch Division of Low-Level Wasts Management and Decomissioning Office of Nuclear Material Safety and Safeguards

SUBJECT:

SUMMARY

OF THE MEETING WITH DAIRYLAND POWER COOPERATIVE' r

DATE & TIME:

Tuesday, May 18, 1993 - 10:00 a.m.

r LOCATION:

One White Flint North i

t 11555 Rockville Pike, Room 1-F-5 Rockville, MD 20852 PURPOSE:

DISCUSSED THE STATUS OF REPOWERING LA CROSSE BOILING W TER REACTOR (LACBWR) WITH NATURAL GAS i

PARTICIPANTS:

EG DAIRYLAND

' WESTINGHOUSE C. L. Pittiglio R. Christians J. Iacovino L. Bell J. Parklyn 1

J. Austin L. Nelson P. Erickson D. Thorpe C. Ferrell E. Tremel R. Dudley

SUMMARY

The purpose of the. meeting was to discuss the possible repowering of LACBWR with natural gas.

If repowering of LACBWR. occurs,.

plant restart would be in 1997. Currently, the licensee is considering the.

i possibility of repowering the secondary side of the plant.

This project would include a 150 MWe gas turbine. Along with this option, the licensee D:

^ '!

_9306030363 930524 ~

DR ADDCK 05000409

)

g p

2 PDR

5 er 1

i MAY 2 41933

~'

2 is also considering the possibility of co-firing with natural gas the fossil unit on the site. The possible repowering of these units was the reason for the i

discussion with the NRC concerning natural gas on site. The licensee's presentation (enclosed)providesdiagramsshowingtheproposedlocationofthe natural gas pipeline, and th6sr approach to analyzing the potential blast effects on the reactor building due to a natural gas pipeline failure.

1 Crigir.a1 Signed By Clayton L. Pittiglio, Project Manager Decommissioning and Regulatory Issues Branch Division of low-level Waste Management and Decommissioning Office of Nuclear Material Safety and Safeguards Encosure:

As stated cc:

See next page do TRIBUTION:

Central-File'.

NMSS r/f

.RBangart WBrach JAustin JSurmeier PLohaus LPittiglio LBell LLWM r/f LLWM t/f PLrickson DDudley CFerrell SUBJECT ABSTRACT: La Crosse Meeting Summary In dall Box on "0TC:" line place a]:5MarklSsill]BoksyfnjC@puFrsiiEh B10;0Qt[DEfihe

~

C = cover E = Cover N ='N6' Copy 0FC :

LLDR E

LLg h

LLDR L

LPhfhio "4ME:

JAustin DATE: 5/19/93 h/93 5/tf/93 Path & File Name:P:LACMETS OFFICIAL RECORD COPY In small Box on "DATE:" line place a: M = E-Mail Distribution Copy H = Hard Copy M b b PDR :

YES

/ NO Category:

Proprietary or CF Only ACNW:

YES NO

/

Delete file after distribution Yes M No IG:

YES NO g r,

.