ML20044G451
| ML20044G451 | |
| Person / Time | |
|---|---|
| Site: | 05000134 |
| Issue date: | 05/25/1993 |
| From: | Lange D Office of Nuclear Reactor Regulation |
| To: | Bobek L WORCESTER POLYTECHNIC INSTITUTE, WORCESTER, MA |
| References | |
| NUDOCS 9306030120 | |
| Download: ML20044G451 (1) | |
Text
MAY 2 51993 Docket No. 50-134 Mr. Leo M. Bobek, Director Nuclear Reactor Facility Worcester Polytechnic Institute Worcester, Massachusetts 01609 Gentlemen:
SUBJECT:
REQUALIFICATION RESULTS - WORCESTER POLYTECHNIC INSTITUTE (WPI)
Enclosed is a copy of the Results for the Operator Requalification Examination conducted at WPI on April 19-21, 1993.
Sincerely, David J. Lange, Acting Chief Operator Licensing Branch Division of Reactor Controls and Human Factors, NRR
Enclosures:
1.
Summary Sheet 2.
Individual Requalification Examination Report 3.
Candidate's Answer Sheets Distribution: w/o encls. 2 & 3 OLB/LA Summary Sheet File (DMcCain)
Facility File (DMcCain)
Distribution: w/o encl Docket Files DLange JCaldwell PDoyle Nn n rq ~ ~
N + U $ 1; t ! [ U.[ ["^ [i; %' Ef' PDR (CentraEFilsF
~
l l
hCH OL Ih1 0
H OLB:
O 0/g{5(ell 0/p/93 R
o D
- dm P%y 05/81/93 05/11/93
/93 0'g 930603o220 930525 l
PDR-ADOCK 05000134 i
V PDR i
..}