ML20044G296
| ML20044G296 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 05/18/1993 |
| From: | Chris Miller Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20044G297 | List: |
| References | |
| NUDOCS 9306020293 | |
| Download: ML20044G296 (8) | |
Text
.
puntcuq$*$
A 3 "'
UNITED STATES n
3
.. E NUCLEAR REGULATORY COMMISSION p,
[
WASHINGTON. D.C. 20555 PUBLIC SERVICE ELECTRIC & GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-272 SALEM NUCLEAR GENERATING STATION. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.141 License No. DPR-70 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
The application for amendment filed by the Public Service Electric &
Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated January 18, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering.the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR' Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-70 is hereby amended to read as follows:
9306020293 930518 PDR ADOCK 05000272 P
9 1
I,
(2) Technical Specifications and Environmental Protection Plan l
The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 141, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 60 days after the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
)
(
Charles L. Mi Director Project Directorate I-2 Division of Reactor Projects - I/II i
Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: May 18, 1993 i
i l
l
)
1 i
o
i ATTACHMENT TO LICENSE AMENDMENT NO.141 FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 i
Revise Appendix A as follows:
Remove Paaes Insert Paaes 3/4 6-19 3/4 6-19 3/4 6-20 l
l
)
)
COMTAINMSNT SYSTEMS 1
ELECTRIC HYDROGEN RECOMBINERS - W LIMITING CONDITION FOR OPERATION 3.6.4.2 Two independent containment hydrogen recombiner systems shall be OPERABLE.
APPLICABILITY: MODES 1 and 2.
ACTION:
With one hydrogen recombiner system inoperable, restore the inoperable system to OPERABLE status within 30 days or be in at least HOT STANDBY I
within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.6.4.2 Each hydrogen recombiner system shall be demonstrated OPERABLE:
a.
At least once per 6 months by verifying during a recombiner
-l system functional test that the minimum heater sheath temperature increases to 2 700*F within 90 minutes and (upon reaching 700*F) verifying that, after increasing the power setting to maximum power for 2 minutes, the power meter reads 2 60 kW.
b.
At least once per 18 months by:
1.
Performing a CHANNEL CALIBRATION of all recombiner instrumentation and control circuits.
i 2.
Verifying through a visual examination that there is no evidence of abnormal conditions within the recombiner l
)
enclosures (i.e.,
loose wiring or structural connections, deposits of foreign materials, etc.)
P 3.
Verifying during a recombiner system functional test that the heater sheath temperature increases to 2 1200*F within 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and is maintained for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
j 4.
Verifying the integrity of all heater electrical circuits by performing a continuity and resistance to ground. test following the above required functional test. The resistance to ground for any heater phase shall be 2 10,000 ohms.
NOTE: The requirements of this 6 month system functional test can be met by satisfactory completion of the 18 month system functional test in Specification 4.6.4.2.b on those occasions where performance of both tests would be required at or near the same time.
SALEM - UNIT 1 3/4 6-19 Amendment No. 141 i
p ancoq e
A 3 *~
UNITED STATES n
3
.E NUCLEAR REGULATORY COMMISSION WASHINGTON, D C. 20555
\\...../
PUBLIC SERVICE ELECTRIC & GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-311 SALEM NUCLCAR GENERATING STATION. UNIT NO. 2 AMENDMENT TO FACILITf OPERATING LICENSE Amendment No.120 License No. DPR-75 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
The application for amendment filed by the Public Service Electric &
Gas Company, Philadelphia Eiectric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated January 18, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-751.s hereby amended to read as follows:
(2) Technical Soecifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 120, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance, and shall i
be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION f
harles L. Miller, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
Mby 18, 1993 i
l i
l l
.I 1
I
i l
ATTACHMENT TO LICENSE AMENDMENT NO.120 t
FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 i
i J
Revise Appendix A as follows:
Remove Pace Insert Pagg 3/4 6-22 3/4 6-22 i
l e
s I
l 1
L F
i t
~
CONTAINMENT SYSTEMS i
4 ELECTRIC HYDROGEN RECOMBINERS - W t
LIMITING CONDITION FOR OPERATION 3.6.4.2 Two independent containment hydrogen recombiner systems shall be OPERABLE.
I i
APPLICABILITY: MODES 1 and 2.
ACTION:
I With one hydrogen recombiner system inoperable, restore the inoperable system to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.6.4,2 Each hydrogen recombiner system shall be demonstrated OPERABLE
.1 a.
At least once per 6 months by verifying during a recombiner l
system functional test that the minimum heater sheath temperature increases to 2 700*F within 90 minutes and (upon reaching 700*F) f verifying that, after increasing the power setting to maximum power f or 2 minutes, the power meter reads 2 60 kW.
l l
r b.
At least once per 18 months by:
1.
Performing a CHANNEL CALIBRATION of all recombiner instrumentation and control circuits.
2.
Verifying through a visual examination that there is no evidence cf abnormal conditions within the recombiner enclosures (i.e.,
loose wiring or structural connections, deposits of foreign materials, etc.)
3.
Verifying, during a recombiner system functional test, that the heater sheath temperature increases to 2 1200*F within l
5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and is maintained for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
i 4.
Verifying the integrity of all heater electrical circuits by performing a reristance to_ ground test following the above required functional test.
The resistance to ground.
for any heater phase shall be greater than or equal to l
10,000 ohms.
NOTE: The requirements of this 6 month system functional test can be met by satisfactory completion of the 18 month system functional test in. Specification 4.6.4.2.b on those occasions where performance of both tests would be required at or near the same time.
]
l i
SALEM - UNIT 2 3/4 6-22 Amendment No.120
]
i 1
4
-n
~