ML20044G231

From kanterella
Jump to navigation Jump to search
Ack Receipt of 930401 & 0518 Ltrs Transmitting Scenario for Upcoming EP Exercise.As Result of Comments,Staff Made Significant Changes to Scenario.Revised Scenario Should Support Reasonable Demonstration of Er Capabilities
ML20044G231
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/26/1993
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cottle W
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 9306020208
Download: ML20044G231 (5)


Text

>

  1. QEGug

. UNITED STATES

+

f k

NUCLEAR REGULATORY COMMISSION W

REGION IV

'8 611 RYAN PLAZA DRIVE, SulTE 400 c,.g-j#

AR LtNGTON, TEXAS 76011-8064 MAY 2 61993 Docket:

50-498 50-499 License:

NPF-76 NPF-80 Houston Lighting & Power Company ATTN: William T. Cottle, Group Vice President, Nuclear P.O. Box 1700 Houston, Texas 77251

SUBJECT:

SOUTH TEXAS PROJECT EMERGENCY PREPAREDNESS EXERCISE SCENARIO This is to acknowledge receipt of your letters dated April 1 and May 18. 1993, transmitting the scenario for your upcoming emergency preparedness exercise.

We reviewed the scenario submitted April 1,1993, and communicated our comments to you during a telephone conversation held on April 28, 1993, l

between Mr. Dwight Chamberlain and other members of our staff and i

Mr. M. Covell and members of your staff. As a result of our comments, your i

staff made significant changes to the scenario.

The revised scenario which was submitted on May 18, 1993, was reviewed by our staff using Inspection l

Procedure 82302.

Based on our review, we have concluded that the revised

.i scenario should support a reasonable demonstration of your emergency response capabilities.

j Should you have any questions concerning this letter, please contact 5

Dr. D. Blair Spitzberg at (817) 860-8191.

l Sincerely, l

l g L.

. Callan, Director Division of Radiation Safety and Safeguards cc:

Houston Lighting & Power Company ATTN:

William J. Jump, General Manager Nuclear Licensing P.O. Box 289 i

Wadsworth, Texas 77483 l

a

[p.

9306020208 930526 PDR ADOCK 05000498 y

i\\

F PDR

l I

l i

i-Houston Lighting & Power Company i City of Austin Electric Utility Department ATTN:

J. C. Lanier/M. B. Lee t

721 Barton Springs Road Austin, Texas 78767 l

4 City-Public Service Board ATTN:

R. J. Costello/M. T. Hardt P.O. Box 1771 l

San Antonio, Texas 78296 i

'Newman & Holtzinger,.P. C.

ATTN: Jack R. Newman, Esq.

1615 L Street, NW i

Washington, D.C.

20036 i

Central Power and Light Company ATTN:

D. E. Ward /T. M. Puckett P.O. Box 2121 Corpus Christi, Texas 78403 1

INP0 Records Center

.i 700 Galleria Parkway i

Atlanta, Georgia 30339-5957 Mr. Joseph M. Hendrie j

50 Bellport Lane 4

Bellport, New' York 11713 0

Bureau of Radiation Control i

State of Texas j

1101 West 49th Street ~

Austin, Texas 78756 1

l Judge, Matagorda County Matagorda County Courthouse j

1700 Seventh Street i

Bay City, Texas 77414 i

.i Licensing' Representative Houston Lighting & Power Company Suite 610 Three Metro Center Bethesda, Maryland 20814 Houston Lighting & Power Company i

ATTN:

Rufus S. Scott, Associate j

General Counsel

'l P.O. Box 61867 i

Houston, Texas 77208 1

i

.3 i

-l

l 3

- Houston Lighting & Power Company- ;

i Chief, Technological Hazards Branch FEMA Region.6-

-Federal Center i

800 North toop 288 i

Denton, Texas 76201-3698 I

i

'I Lf 9

y I

l

.i b

i i

-f

's

{

i I

l 1

)

l i

4 t

.l l

e i

y!

I i

+

L i

i Houston Lighting & Power Company bcc: DMB (A045) bec without licensee's scenario Resident Inspector D. B. Spitzberg, FIPS FIPS File RIV File J. L. Milhoan i

L. J. Callan D. D. Chamberlain l

B. Murray Project Engineer DRP/D MIS System e

C. A. Hackney i

R. Erickson, NRR (MS 9 H15)

G. Dick, NRR Project Manager (MS 13 H15) i i

i E-93-13 i

RIV:FIPS W P C:FIPS k DD:DRSS[hD D:DRSS)((

DBSpitzberg:nh BMurray

(;f0DChamberlain LJCallan h S 21/ 93

% M /93 5 /2f/93 T /25/93

/

a

Houston Lighting ik Power Company '

-/cc: DMS (A045) f 1

bcc without licensee's scenario Resident Inspector D. B. Spitzberg, FIPS FIPS File RIV File J. L. Milhoan L. J. Callan D. D. Chamberlain B. Murray Project Engineer DRP/D j

t-MIS System C. A. Hackney R. Erickson, NRR (MS 9 H15)

G. Dick, NRR. Project Manager (MS 13 H15) 1 e

i y

i t

i i

E-93-13 RIV:FIPS W P C:FIPS b DD:DRSS[/f)

D:DRSS)k DBSpitzberg:nh BMurray #

ilhDChamberlain LJCallan M f

S 71 / 93 h M /93 5 /2f/93 7 /2f/93

/

i S01-100 i

1