ML20044G211

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-424/93-09 & 50-425/93-09 on 930418-0508 & Notice of Violation
ML20044G211
Person / Time
Site: Vogtle  
Issue date: 05/17/1993
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20044G212 List:
References
NUDOCS 9306020187
Download: ML20044G211 (3)


See also: IR 05000424/1993009

Text

,

,-

.

.-

.

.

MAY 171993

Docket Nos. 50-424, 50-425

License Nos. NPF-68, NPF-81

Georgia Power Company

ATTH: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 1295

Birmingham, AL 35201

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-424/93-09 AND 50-425/93-09)

This refers to the inspection conducted by B. Bonser of this office on April

18 through May 8, 1993. The inspection included a review of activities

authorized for your Vogtle facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence. After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement actions is

necessary to ensure compliance with NRC regulatory requirements.

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

'by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

p'omR 2%4

'\\

y

ol

<

-

-

.

.

.

.

t

MAY 171993

.

Georgia Power Company

2

'

,

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAt sicurg gy

/(LAN R. Hrppi

Alan R. Herdt, Chief

Reactor Projects Branch 3

s

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

-

cc w/encls:

R. P. Mcdonald

Executive Vice President

Nuclear Operations

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

C. K. McCoy

Vice President-Nuclear

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

W. B. Shipman

General Manager, Nuclear Operations

Georgia Power Company

P. O. Box 1600

Waynesboro, GA 30830

J. A. Bailey

Manager-Licensing

Georgia Power Company

j

P. O. Box 1295

>

Birmingham, AL 35201

'

Nancy G. Cowles, Counsel

Office of the Consumer's

,

Utility Council

B4 Peachtree Street, NW, Suite 201

. Atlanta, GA 30303-2318

Office of Planning and Budget

Room 615B

'

270 Washington Street, SW

Atlanta, GA 30334

l

cc w/encis: Continued page 3

,

I

i

'r

.

.

,

MAY 171993

i

.

,

Georgia Power Company

3

'

cc w/encls: Continued

l

Office of the County Commissioner

'

Burke County Commission

,

Waynesboro, GA 30830

i

Harold Reheis, Director

Department of Natural Resources

205 Butler Street, SE, Suite 1252

'

Atlanta, GA 30334

Thomas Hill, Manager

'

Radioactive Materials Program

Department of Natural Resources

!

4244 International Parkway

l

Suite 114

)

Atlanta, GA 30354

a

l

Attorney General

Law Department

l

132 Judicial Building

Atlanta, GA 30334

,

)

Dan H. Smith

!

Vice President

Power Supply Operations

i

Oglethorpe Power Corporation

'

2100 E. Exchange Place

Tucker, GA 30085-1349

l

l

l

Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky & Walker

12th Floor

,

'

1050 Connecticut Avenue, NW

Washington, D. C.

20036

.

bec w/ encl:

D. Seymour, RII

1

D. Hood, NRR

P. Skinner, RII

l

A. Herdt, RII

S. Vias, RII

Document Control Desk

NRC Resident Inspector

- U.S. Nuclear Regulatory Commission

P. O. Box 572

j

Waynesboro, GA 30830

RII DRP

R1

!

[

Y

ls

i

FILE: VG309RPT.DAS

eymour

P (rner

j

f/13/93

[/1/93

i

!

!

I

i

'

L

j