p 3
9 Tenmu wiw Amnweg rmurce onam necw mwna un MAY 2 319G3 U.S.
Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter Of
)
Docket Nos. 50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - NRC BULLETIN NO. 93-02,
" DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAIMERS" On May 11, 1993, NRC issued NRC Bulletin No. 93-02, "b: 3ris Plugging of Emergency Core Cooling Suction Strainers,"
notifying licensees of the potential loss of net positive suction head for the Emergency Core Cooling System (ECCS).
The bulletin directed the licensees to take the.following actions:
1.
Identify fibrous air filters or other temporary sources of fibrous material, not designed to withstand a Loss of Coolant Accident (LOCA), which are installed or stored in the primary containment.
2.
Take any immediate compensatory measures which may be required to assure the functional capability of the.ECCS, and 3.
Take prompt action to remove any such material.
BFN Unit 2 is currently in a refueling shutdown.
Accordingly, TVA has performed a walkdown of the drywell (i.e., primary containment) and has confirmed that there are no temporary fibrous-air filter or other sources of fibrous material not designed to withstand a LOCA prior to closure of the drywell for restart.
k 9306020111 930523
/
l
.PDR ADOCK 05000259 G
PDR L/
l
2 U.S. Nuclear Regulatory Commission Mi.Y 2 3 B33 TVA notes that there are no permanently installed fibrous air filters inside the BFN Unit 2 drywell.
I BFN Units 1 and 3 are shutdown for extended outages.
These units will be evaluated for permanent fibrous material prior to their respective startup.
These units will be inspected and temporary fibrous material will be removed prior to their respective startup.
For Units 1 and 3, a report confirming completion of the above listed activities will be provided l
prior to their respective startup.
1 Enclosed is a list of commitments contained in this letter.
Please direct any questions concerning this issue to me at (205) 729-2636.
Sincerel i
(
U
~
~
P e a as Manager of Site Licensing I
Subscribed and sworn to before me on t is c23d d y of Mai/
1993.
fb Notary Public My Commission Expires N' J ') 4I l
Enclosure
]
cc: _See page 3 l
l 1
0.
L T
i 3
U.S.
Nuclear Regulatory Commission t1Af 2 31993 i
Enclosure cc (Enclosure):
f NRC Resident Inspector i
Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 Mr. Thierry M. Ross, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 i
i
?
i e
i b
I
I
. o.
E ENCLOSURE I
i
SUMMARY
OF COMMITMENTS r
I F
1.
Units 1 and 3 will be evaluated for permanent fibrous i
material prior to their respective startup.
2.
Units 1 and 3 will be inspected and temporary fibrous material will be removed prior to their respective startup.
l r
3.
For Units 1 and 3, a report confirming completion of the above listed activities will be provided prior to their i
respective startup.
t
?
l l
)
i k
l 9
8
~ l a
l 1
1
-