y y
'- 1
'N Cimmrnw;cith Edis:n O
1400 Opus Place
[
- ~
CJ Downers Grove, illinois 60515 l
\\s/$E;-
i May 18, 1993 t
U.S.
Nuclear Regulatory Commission Washington, D.C.
20555 i
Attention:
Document Control Desk
Subject:
Zion Station Unit 2 Cycle 13 Startup Report NRC Docket No. 50-304
Reference:
June 26, 1992 letter from C.P.
Patel to T.J. Kovach Pursuant to Facility Operating License No. DPR-48, Appendix A,
Technical Specification 6.6.1 and 10 CFR 50.4, Commonwealth Edison Company (CECO) is transmitting the attached " Zion Generating Station Unit 2 Cycle 13 Start..p Test Report."
Submittal of this report fulfills the requirement of Technical Specification 6.6.1. A. (3 ) to submit a summary report of plant startup and power eocalation testing following installation of fuel that has a different design.
Details of the replacement fuel aesign are described in the referenced ~NRC Safety Evaluation for Amendment No. 128 to DPR-48 and in the~related CECO submittals.
1 Please direct any questions you may have to this office.
Sincerely,
/l.
i Stephen F.
Stimac Nuclear Licensing Administrator l
Attachment cc:
A.
Bert Davis, Regional-Administrator - RIII C.Y.
Shiraki, Project Manager - NRR J.D.
Smith, Senior Resident Inspector - Zion s
g:ssmay:1.
270091 Ah'}i
/<
F 9306010263 930518 PDR ADOCK 05000304
[
P' PDR it.
'