ML20044F038
| ML20044F038 | |
| Person / Time | |
|---|---|
| Site: | Claiborne |
| Issue date: | 05/04/1993 |
| From: | Wood L AFFILIATION NOT ASSIGNED |
| To: | Selin I, The Chairman NRC COMMISSION (OCM) |
| References | |
| NUDOCS 9305260400 | |
| Download: ML20044F038 (2) | |
Text
4 i
e Re: Louisiana Energy Services /
5/4/93 Application f or uranium enrichnent facility i
Dear a:
- r. Selin:
llease advise the I~RC licensing board to DEliY the above application because the people of Forest Grove and Center Springs are strongly opposed.to such a plant in their cc:amunity.
-To put it in those areas is to practice environcental racism.
Such a plant should not be thrust on A12 community and it is past time to stop the nuclear cy cle-except in small experimental uses.
It is a tech-nology too deadly for lif e and should be. scrapped.
-le need to realize when a technology is against the long-term interest of human beings effd other carth life.
~ r tz U<g>(
Lea Wood hhI RR 1, Box 1305 lp Underhill, VT 05489 e
h I
1 i
+
i 9305260400 930504 PDR ADOCK 07003070 C
A d
I i
k a
S a
a v
2 Ivan Selin, Chairman US Nuclear Regulatory Commission i
I washington, DC 20555 i
- r I
lualulll,,,,l,1,,l,1,,l,l,,,II,\\
u,,;s,g.
261' l
i I
s 4
3 I
,